Value Engineering Study Case Done By: Ameer A. Al-Saleh ( ID# 850651) For: Dr. Sadi Assaf Summer 2005 Effective Layout : Cost & Schedule Impact on Residential.

Slides:



Advertisements
Similar presentations
Jingming Xu Multimedia Communications Lab University of Waterloo
Advertisements

MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
13/4/20051 Alaa Sadik Ph.D., University of Hull, UK Faculty of Education in Qena جامعة جنوب الوادي مركز تنمية قدرات أعضاء هيئة التدريس Effective Presentation.
Load Balancing in a Cluster-based Active Jiani Guo (Student Member, IEEE) Laxmi Bhuyan (Fellow, IEEE) March 15 th 2005 Seo, Dong Mahn.
Assessment of Peaking Gas Service for New Englands Quick Start Generators Planning Advisory Committee March 3, 2005 Herbert Rakebrand III Herbert Rakebrand.
Use of administrative data at Statistics Finland Ilkka Hyppönen Statistics Finland.
August National Medicare & You Training Program Speaker Name Group Name Date.
Lia Toledo Moreira Mota, Alexandre de Assis Mota, Wu, Shin-Ting
Slovenian experience on 98/34 Notification Procedure Conference on the Functioning of the 98/34 Notification Procedure, Brussels, 22 June 2005 mag. Irena.
SURVEILLANCE OF SAFETY OF ELECTRICAL EQUIPMENT - ACTIVITIES OF MARKET INSPECTORATE OF RS Pavel Peter GORŠE Assistant Chief Market Inspector
Mt. Diablo Unified School District IFAS Training Purchase Requests Using Web Screens Creating PRs and Receiving Items (First Revision)
M.Nedim Alpdemir, Anastasios Gounaris¹, Arijit Mukherjee², Desmond Fitzgerald, Norman W. Paton¹, Paul Watson², Rizos Sakellariou¹, Alvaro A.A. Fernandes¹,
UKOLN is supported by: Exploring the Global Knowledge Space Dr Liz Lyon, UKOLN, University of Bath, UK SWMLAC ICT Masterclass Bristol, January
UKOLN is supported by: Starting to explore the role of memory institutions within the social fabric of the new Web Dr Liz Lyon, UKOLN, University of Bath,
East Hampton High School July 2013 – July 2014 Design Phases.
By: Walter C. Brown and Daniel P. Dorfmueller
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
HOME BUYING/SELLING Hill AFB Housing Office
ARCH 4602 LARC 4506 & 6406 ID 4606 Collaboration Studio site inventory and analysis...
Virginia Housing Development Authoritys NoVA Preservation Initiatives Affordable Housing Advisory Committee December 16, 2005.
REDWOOD UTILITY BILLING A UTILITY MANAGEMENT & CONSERVATION COMPANY.
March 18, 2005Computers in Libraries SPACE THE FUTURE FRONTIER Don Albrecht Jennifer S. Kutzik Colorado State University Libraries.
October 19, Semantic Web. October 19, Semantic Web Part 3: Semantic Web.
Module Reading Plans and Elevations
Behaviour and Design of Steel Structures Lecture 3 Conceptual design.
King Fahd University Of Petroleum & Minerals Value Engineering Study For Car Parking Shade Presented By Ali M. Moussa For CEM 512 :Value Engineering Dr.
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
RFP for ERP Software and Services Pre-Proposal Conference November 1, 2005 Nothing in this presentation (visual, verbal or written) shall be construed.
INAR 342 FINISHING. INAR 342 : FINISHING Aim of the Course This course is designed to heighten the students understanding of the rules and principles.
07/05/20051 The Performance Impact of Kernel Prefetching on Buffer Cache Replacement Algorithms by Ali R. Butt, Chris Gniady, and Y.Charlie Hu, SIGMETRICS05.
1 Overview and Outlook for PPP Projects in Vilnius Mrs. Ruta Vainiene Adviser to the Mayor of the City of Vilnius November 22 nd, 2006 Vilnius.
Constructions of Large-panel Buildings in Vilnius
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
May 9, September 2005, Barcelona, Spain Prioritization of Forestry Themes for the SRA Risto Päivinen.
Robust Optimization Concepts and Examples
CAS: Central Instrument for Managing for Results.
January 11, Beginning Robotics 2005 Prairie Creek Elementary RoboClub.
Load Balancing Hybrid Programming Models for SMP Clusters and Fully Permutable Loops Nikolaos Drosinos and Nectarios Koziris National Technical University.
May 11, Overview of Medicare, Medicaid and State Children’s Health Insurance Program for Citizens’ Health Care Working Group William J. Scanlon Health.
SU/IU Service-Learning Symposium Nov Strategies and challenges to institutionalising service-learning at a South African university Magda Fourie.
Aug. 22, 2007 Americas CF&S Kick Off Meeting 1 Overview of Value Engineering Program T. Lackowski.
AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Primary Residential Design Considerations
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
1 Report to Regional Coordinators of TAG Meeting Sept 22-24, 2004.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Private Sector  Buildings and structures built for ordinary people.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Asset Planning & Optimization Capital Renewal Strategies
Foundations of Technology Construction
(Additional materials)
Construction Project Management
Value Management.
House Construction Budget Plan
Quantities and Price.
Quantities and Price.
TCU-PROJECT: 7TH Semester Course
Foundations of Technology Construction
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Value Engineering Study Case Done By: Ameer A. Al-Saleh ( ID# ) For: Dr. Sadi Assaf Summer 2005 Effective Layout : Cost & Schedule Impact on Residential units

Introduction VE Case Study: Effective Residential Layout and Effective Construction Schedule. My VE study case could be debatable, yet it is added-value paper. Cultural block is barrier to Creativity; this is a block that we impose on our selves due to the society, the culture or group to which we belong. Our way is right will confine our thinking power..

Ameer Al-Saleh, INDEX Mission And Objective Flash Points Fact Sheet Sample of Designs VE Job Plan 1. Information Gathering Phase 2. Function Analysis Phase 3. Creative Phase 4. Evaluation Phase 5. Development Phase 6. Presentation Phase Conclusion

Ameer Al-Saleh, Mission and Objective Main objective of this paper is : to introduce Value Engineering job plan on Residential housings in Saudi Arabia based on effective layout consolidation. Intermediate Objective: elevate the awareness among the public of layout cost impact construction wise, and schedule wise. Mission: Get maximum Riyal (SR,) value in, during, by end of construction activity of residential houses.

Ameer Al-Saleh, Flash Points Value engineering is a creative, organized approach whose objective is optimize the life cycle cost and/or performance of a facility. Main VE teams objective is to analyze the project (service/equipment/facility), find high cost areas, recommend alternatives, and estimate initial and life cycle costs for the original design and for each proposal alternative.

Ameer Al-Saleh, Information Phase Whatever a man dose, he must do first in his mind. - albert szent-Gyorgyi ( ) Hungarian- American Biochemist. Key Questions What is it? What does it do? What must it do? What does it cost? What is the budget? What is it worth?

Ameer Al-Saleh, Data Source

Ameer Al-Saleh, Facts Sheet Average income is …./year/employee Nation Growth Rate is 3.5 %/Year Government Residential Loan takes 15 years to get. Average Real Estate Loan is more than 50 % interest for 6 year span ( recently activated) The official estimation stated that Saudi is in need of 1 million housing units within the forthcoming 5 years. Average house cost is 1.2 million in a city( as of 2004 estimation). Material cost jumped more than 40% since October last year. Huge number Of Saudis are renting their shelter.

Ameer Al-Saleh, Residential Layout in KSA Presentation 8-18 is mainly for general layout concept (current Practice). Saudi Family have a man sitting room, a women sitting room, and a living room. Average utilization of Man / women sitting room have been sharply declined due to social behavior and modernization. The average area of Man & Women Sitting rooms is 114 M2 in sum. Hereinunder examples of some houses and their layouts.

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh, الرجاء إضغط

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh,

Ameer Al-Saleh, Flash Fact Sheet on the Project ( Original Plot) Project Type: Residential Apartments Building Total Lands Area: 700 M2 Construction allocated area = 420 M2 Total number of Buildings Stories= 2 Parrot surface = (16+30) * 2 = 92 Meter long equivalent to 46 M2 Circumferential Fence Wall length = 35* = 90 meter length, equivalent to 45 M2 Upstairs Lounge Construction Area = 80 M2 Total Construction Area = 420 * = = 1011 M2

Ameer Al-Saleh, Preliminary Cost Estimation DescriptionUnit rate (SR/M2)Total quantityTotal Cost, SR Land Cost* ,000 Construction Cost Commercial Deluxe Super deluxe Power connection fee Water Proof - Toilet Water Proof - Roof Total Cost Commercial Deluxe Super deluxe

Ameer Al-Saleh, Project Stages Concept Development (Basic Design ) Develop Preliminary Cost Estimation Detail Engineering Drawings Design Material Specification Development Detail Construction Estimation Calculation Project Bidding Technical / Commercial Evaluation study Project Contract Awarding Project Execution

Ameer Al-Saleh, Project Execution A- Site preparation B- Site Layout C- Foundation Layout D- Foundation & Ground Bean s Concrete Pouring E- Column Rebar Preparation F- Columns concrete Pouring G- Floor Slab preparation/ Concrete pouring H- Wall Block Layout I- Doors/ Window Preparation J- Exterior / Interior Plastering K- Painting L- Electrical lightings/switch installation M- Building turn over to owner

Ameer Al-Saleh, Project Budget

Ameer Al-Saleh, Project Construction Schedule

Ameer Al-Saleh, Function Analysis Phase It is better to aim at perfection and miss than it is to aim at imperfection and hit it.-T.J.Watson Basic Function of House: shelter residents FAST Diagram The Esteem value ( prestigious,and Social value) Vs. Use Value.

Ameer Al-Saleh, Function Analysis

Ameer Al-Saleh, Function Analysis

Ameer Al-Saleh, FAST Diagram

Ameer Al-Saleh, Creative Phase Key Question: What else will do the job? (Take ONE function at a time) Out of 20 ideas, 3 was considered, 1 was thoroughly evaluated.

Ameer Al-Saleh, Creative Idea Worksheet

Ameer Al-Saleh, Evaluation Phase Change your thoughts and you change your world. – Norman Vincent Peale Economical layout of the residency was re-evaluated to reduce cost. Cultural impact was reviewed vs. other culture practices to reduce residential cost. The Esteem value ( prestigious,and Social value) Vs. Use Value have been considered.

Ameer Al-Saleh, Cost/Worth Model

Ameer Al-Saleh, Development Phase I hear and I forget. I see and I remember.I do and I understand. – Chinese Proverb Eliminate Majlis ( 30 M M 2 ) and host guest in hotels / Isteraha instead. Cancel Majliss toilet ( 8 M M 2 ) Save Foyer space by integrate it with Living Room (8 M M 2 ) Same is applicable for a Women Sitting room Total Saving ( SR) is rounded to 114,000 per 2 story building as capital + construction cost. Potential Construction Schedule Saving is 2 months This saving is equal to approx 10% of total expense.

Ameer Al-Saleh, Project Breakdown

Ameer Al-Saleh, Project Budget- Cost Wise

Ameer Al-Saleh, Worth Wise

Ameer Al-Saleh, Calculation Detail-Page 1

Ameer Al-Saleh, Calculation Detail- Page 2

Ameer Al-Saleh, Calculation Detail – Page 3

Ameer Al-Saleh, Calculation Detail- Page 4

Ameer Al-Saleh, Detail Calculation- page 5

Ameer Al-Saleh, Detail Calculation – Page 6

Ameer Al-Saleh, Detail calculation – Page 7

Ameer Al-Saleh, Presentation Phase Out of this discussion, we believe there are a potential saving for house owner in so many dimension. Among most items is the plot layout. Another concept for value engineering study building materials.

Ameer Al-Saleh, What is value engineering? I am reminded of the quote in our local fast food shop: the bitterness of poor quality remains long after the sweetness of low price is forgotten The VE job plan failing to plan is the same as planning to fail The information phase Whatever a man dose, he must do first in his mind.- albert szent-Gyorgyi ( ) Hungarian-American Biochemist Function Analysis system technique it is better to aim at perfection and miss than it is to aim at imperfection and hit it.- T.J.Watson The evaluation phase Change your thoughts and you change your world. – Norman Vincent Peale Life cycle costing Initial capital costs is but a fraction of the total life cycle cost of a facility The development phase I hear and I forget. I see and I remember.i do and I understand. – Chinese Proverb The presentation phase A picture is worth a thousand words

Ameer Al-Saleh, Al-yousefi, A., Al-Huwaiter,A.,Al-Oshaish, S.,Shublag, E., (1999) Value engineering in Saudi Arabia overview & application in public and private sectors, Proceedings of the Society of American Value Engineering Conference. ATSME , Standard Practice for Performing Value Analysis (VA) of Buildings and Building Systems Fowler, T.C (1983). The User Oriented FAST Diagram. Proceedings of the Society of American Value Engineering Conference. Value Engineering manual, Utah Department of Transportation, Engineering Services

Q & A Thank you for your listening. Now, it is your turn to ask, please do if you have any question(s).