Current activities Vienna, 10th May 2017.

Slides:



Advertisements
Similar presentations
May 3, BE 9.3 Eurocab Case Study EPFL - Industrial Automation Case Study: the Eurocab railways signaling Studienfall: die Eurocab-Signalisierung.
Advertisements

Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Czech-Slovak Corridor
UPS – Tradeshift Supplier Training
 BUT …. Terminal pilot REQUEST TO THE CCB
How to Redeem a Resource Manager Token in AIM
For Using of TAF Test Manager (TTM)
PCS Statistics and main development’s history 2017
PCS Technical Board Vienna, 28th February 2017.
RFC PCS Training Budapest, 8th – 9th February 2017.
PCS Follow up Project Preliminary results.
E-NOTIFY and CAER OnLine Training
Technical update 19 of December 2016
TTR IT Implementation Capacity Offer/Request/Allocation
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
Non-RU Applicant (NRA), PCS UG
FAFSA on the Web Preview Presentation
Business Office Manager Training The ACH Process in 7 Steps
RFC Short Term Path Request Pilots
Removal of national particularities, PCS UG
PCS Technical Board 17th October 2017, Vienna.
Envelope Concept report, PCS UG
PCS Outlook PCS User Group 12th September 2018, Vienna.
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
TAF-TSI Train Object 25th June 2018, Prague.
PaP Publication strategy TT2019 – Combined PaP
PCS Technical Board 1st June 2017, Vienna.
EEC Core Team 6th February 2018, Vienna.
Development roadmap PCS Day 2017.
PCS IT Day Operation Points updates from SNCF-Réseau’s interface.
The new C-OSS Timetable features are not fully in line with C-OSS expectations
PCS User Group 15th February, 2017.
PCS User Group Vienna, 13th September 2017.
AP Power Down Notification
PCS Developments – PCS CCB
PCS IT Day 23 November 2017, Vienna.
Retrospective report of the past year
Update timetable in PCS dossier from national system
PCS Groups and Boards PCS Day 2016
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
TAF-TSI Pilot PCS Day 2017.
PaP Product Definition
JS Pilot and TEG Meeting, Vienna, 12/02/2019
PCS CONTENT ON CMS.
Taskforce „TT Quality“: Report from First Workshop (short)
Handling of PaP identifiers
TSI Compliant PCS Mandatory Interface
JS Handbook overview of changes
ÖBB-Infrastruktur AG Network Access – Customer Care Patrick Wögenstein
PCS Link I-TMS 3 PCS IT Day
PR deadline experiences, PCS UG
PCS Envelope Concept Status of the project
Trainings before Problems: New user
Let’s go through Path Modification/Path Alteration process
RFC Short Term Path Request developments
Envelope concept changes
Connecting Europe, Railway Undertakings and ProRail
Developments Confirmation by the CCB that the TAF TSI components have been successfully implemented into PCS Confirmation by the CCB that PCS has been.
Envelope Concept report, PCS TB
Quick Border Information
Training timeline Train the trainer RFC 1st round RFC 3rd round
Modelling of Train and Path in TAF/TAP TSIs
DSG Governance Group Recommendations.
Using the AIM Alternative Testing Module (for Students)
Module 2.1 Facilities Management
TT Quality monitoring on borders
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Still More LB156 Comment Resolutions Date.
Railway timetabling tools with automatic solutions
Presentation transcript:

Current activities Vienna, 10th May 2017

TAF-TSI changes

Changes in PCS Dedicated test environment for the pilot: https://pcs-taftsitest1.rne.eu/pcs/login Operation points from CRD IM Parameters from PCS Production TT2018 PCS Core application with TAF-TSI changes, but without Loco types Process related changes  The following actions will be possible for the leading RU from Draft Offer phase: directly submit Active Timetable, the transition Post-processing will be skipped which is the behavior today do Withdraw, an option that is not supported today, that will effectively bring the dossier back to Harmonization phase. The IM timetable will be lost and the last version of the dossier in Harmonization will be revived do 'Return to Path Elaboration' which will change the phase to Path Elaboration and give appropriate dossier permissions (read for RU's, write for IM's). The last dossier version in Path Elaboration will be revived. Pap requests status changes in some cases will be necessary from drafted to reserved, tailor-made will stay tailor-made. New process type: ad-hoc with pre-accepted offer (type of information – 19). This means that once Draft Offer is submitted by the leading IM the dossier will immediately transition to Active timetable phase. 22 November 2018

Changes in PCS Train ID: This identifier should be stored on the dossier level in the Basic Data (under the international train number field).  It should be possible to define it during the dossier creation wizard in the 1st step and later it should be visible in the Basic Data. As the modification of the train id is not supported in later phases, the Leading RU can modify it only in Open phase. After releasing the dossier to Harmonization the field should be blocked. Path request ID/Path ID: TsiPathID element is added to PCS Available only in web-services and defined as optional element Path Request ID meaning RU timetable (modification until the end of Harmonization) Path ID meaning IM timetable (modification undil the end of Ad-Hoc request Offer) Traction mode new value: „No leading Engine” is added to the list 22 November 2018

Changes in PCS TrainCC system code table update → Route Class code list: Free text field was replaced with the following list: A, B, C, D, E, F, G, C2, C4, CM2, CM3, CM4, CM, CE, D2, D4, A2, A4, B1, B2, C3, D3, E4, E5 Brake type: „X” was added to the list Spelling mistakes had been fixed for „Braking” (instead of „Breaking”) Dangerous goods indication - new fields Danger Label: It should be added to the dangerous goods area. Free text. Dangerous Goods Volume: It should be added to the dangerous goods area. Values are expected in cubic meters. Limited Quantiy Indicator: New check box in the dangerous goods area. ETCS Level 0 EBICAB 700 NEXTEO ASFA ETCS Level NSC LS DAAT EBICAB 900 ETCS Level 1 ZUB 123 EVM SELCAB ETCS Level 2 ALSN CAWS SIGNUM ETCS Level 3 ATP-VR/RHK ATP ZUB PZB KVB BACC ATB 1st Gen LZB TVM 300 RSDD/SCMT ATB Next Gen Crocodile TVM 430 SSC GW ATP TBL 1 KVBP MEMOR II+ RETB TBL 2 KCVP SHP TPWS TVM 430TBL1+ KCVB PKP 22 November 2018

IP Consolidation package

IP Consolidation package National Systems Web-Service Request PCS IP PCS Core Web-Service Request Response/Error Code Notification Service National Systems Web-Service Request PCS Core Response/Error Code Notification Service 22 November 2018

IP Consolidation package As PCS IP tries also to resolve ACL issues as PCS Core, it can happen that the result on the GUI and via IP is different. The aim of the development to remove this additional layer in front of PCS Core and PCS interface partners would send the web-service operations directly to PCS Core. Expected benefits: Decrease of performance issues Decrease of confusing error/response codes, for example: RC 100, when nothing happened in the Core RC 302 on IP, when the action is possible via the GUI Decrease of development time on the interface side Fix open issues like problems in Path Alteration Expected consequences: the IP addresses will be changed on RNE side 22 November 2018

Planned scope for November 2017

Tasks until November PaP Product definition 1st and 2nd step Pre-booking phase for PaP requests RFC acceptance indicator separation from the IM indicators C-OSS timetable RFC Short Term Path Requests Pilot N day rule adjustment to be able to publish PaPs for real short term Empty Envelope Concept Project participation Wireframe creation Business analysis 22 November 2018

Tasks until November Selected CRs – in specification phase currently Notification Module (1074, 1084, 1091, 1258, 1049, 1207) Possibility to subscribe/unsubscribe to notifications New type of notifications Labels (1266) Activation attachment function during the observation phase (1287) – will be already in a patch Wrong dossier version nr. via interface (1050) Common mandatory parameters (1137) „Trivials”: 1182, 1176, 1192, 1199, 1205, 1201, 1222, 1260, 1259 22 November 2018