Novi GOLD. Novi GOLD Razpoložljivi totalni tlak, Pa Novi GOLD Področje delovanja Zračni pretok, m3/h

Slides:



Advertisements
Similar presentations
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Advertisements

RWD CONTROLLERS TECHNICAL
Heating, Ventilating, and Air-Conditioning
IX. REDUCING GREENHOUSE TEMPERATURE A. temperature regimes –range deg, stress above 90 deg.
Commercial Mechanical Requirements
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
STAND ALONE CONTROL FOR TERMINALS
Geothermal Retrofit of HVAC Systems
HVAC Heating, Ventilation and Air Conditioning -something that you never think about until it doesn’t work properly.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
RETScreen® Energy Efficiency Projects
Blow Dryers A heat transfer problem waiting to happen By Scott Lemmon and Charlie Crosby.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Objectives Finish with Multizone Systems
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Lecture 17: VAV and Terminal Reheat Systems Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Air Conditioning Systems
Objectives Discuss Project Topics Learn to design VAV and DOAS System.
Heat Recovery Ventilator Be used with AC system, Create a healthy life.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
I Pag 1 Microchiller 2. I Pag 2 I Pag 3 Information on the display.
2010.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Beckhoff Building Automation New Automation Technology HVAC-Library Exercise Air Conditioning System.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
STUDY ON HVAC SYSTEM STUDY ON HVAC SYSTEM
Objectives Analyze processes in AHU and buildings.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
SWIMMING POOL HEAT PUMP
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Heat Pumps Presentation by: Rana Itani. Objective To familiarize audience on the components of a heat pump and how it works.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
HCB 3-Chap 19B: All-Air_Multizone_Reddy1 Chapter 19B: ALL-AIR SYSTEMS FOR MULTIPLE SPACES Agami Reddy (July 2016) 1)CAV terminal reheat 2)CAV multizone.
SREČNO NOVO LETO 2009 Lara Koren, 2.c.
Product Awareness, Commissioning & Maintenance
Fan Coil Controller FC/S 1.1
Comparison between L – Series / K - series
Welcome to the Colorado Restaurant Association Pikes Peak Chapter Energy Efficiency in the Restaurant Industry.
Objectives Finish analysis of most common HVAC Systems
Announcements End of the class – course evaluation
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
CEDAR Detector Ventilation System Review
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Discus Final Project Learn about Solar Systems
Announcement No project presentations !
Lecture Objectives: Finish with HVAC systems
SELACAL SOLARNI FOTONAPETOSTNI SISTEM ZA TOPLO VODO
Voyager II and III – Energy Recovery Modules
Lecture Objectives: Answer questions related to HW 4
Chilled Beam Performance:
Chapter 19B: ALL-AIR SYSTEMS FOR MULTIPLE SPACES
Glavne lastnosti multimetrov so:
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
E-mobilnost in njena integracija v elektroenergetski sistem
Air Conditioning System-1
Lecture Objectives: Discus Final Project Learn about Solar Systems
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
B. Munkhbayar BEEC/SCEA/MUST
Lecture Objectives: Discuss HW4 parts
Objectives Finish with Heat exchangers
Announcements Exam 1 Next Class (Thursday, March 14th):
Mikkelin university of applied sciences Building services
Objective Revie the Cooling Cycle Learn about air distribution systems
(a) Find the PE at A PE = m g h = ( 500 kg )( 9.8 m/s2 )( 30 m )
Objectives Processes in Cooling towers and AHUs.
Presentation transcript:

Novi GOLD

Razpoložljivi totalni tlak, Pa Novi GOLD Področje delovanja Zračni pretok, m3/h 400 500 1000 2000 3000 5000 10000 14000 1000 11 12 21 22 31 32 500 400 Razpoložljivi totalni tlak, Pa 300 200 100 0,1 0,2 0,3 0,4 0,5 1 2 3 4 Zračni pretok, m3/s

Opis naprave GOLD, velikosti 21/22 in 31/32 Novi GOLD Opis naprave GOLD, velikosti 21/22 in 31/32 elektro omarica odvodni ventilator z motorjem in frekvenčnikom ODPADNI ZRKA priklopna kapa filter na odvodu ODVODNI ZRAK ODPADNI ZRAK nastavitvena zaslonka tipalo dovodnega zraka DOVODNI ZRAK SVEŽI ZRAK zaščitni okvir (dodatno) tipalo odvodnega zraka dovodni ventilator z motorjem in frekvenčnikom rekuperator zraka dovodni filter pogonski motor rekuperatorja

Opis naprave GOLD, velikosti 21/22 in 31/32 Novi GOLD Opis naprave GOLD, velikosti 21/22 in 31/32 elektro omarica dovodni ventilator z motorjem in frekvenčnikom priklopna kapa DOVODNI ZRAK dovodni filter SVEŽI ZRAK DOVODNI ZRAK nastavitvena zaslonka tipalo odvodnega zraka ODPADNI ZRAK ODVODNI ZRAK zaščitni okvir (dodatno tipalo dovodnega zraka odvodni ventilator z motorjem in frekvenčnikom rekuperator zraka odvodni filter pogonski motor rekuperatorja

Žični upravljalnik Novi GOLD Uporabniški nivo STIKALNA URA TEMPERATURA PRETOK ZRAKA Preizkusni nivo NASTAVITVE TESTI Servisni nivo OMEJITVE NASTAVITVE

Večja prilagodljivost pri montaži Novi GOLD Večja prilagodljivost pri montaži Velikost 11/12 Desna izvedba Leva izvedba Zunanji zrak Odvodni zrak Dovodni zrak Odpadnii zrak

Večja prilagodljivost pri montaži Novi GOLD Večja prilagodljivost pri montaži Velikost 21-32 Desna izvedba Leva izvedba Zunanji zrak Odvodni zrak Dovodni zrak Odpadni zrak

GOLD Wing, lastni razvoj in lastna proizvodnja ! Novi GOLD GOLD Wing, lastni razvoj in lastna proizvodnja ! Direktno gnani regukacija hitrosti nizek hrup majhne tlačne izgube

Povezava kanala in centrifugalnega ventilatorja Novi GOLD Povezava kanala in centrifugalnega ventilatorja Tlačni padci v kanalu 9,4 m/s 25 Pa 1900 Padec tlaka v kolenu Sistemski efekt Skupni padec tlaka 25 Pa 175 Pa 200 Pa 9,4 m/s 600 Dim. 400 x 400, Centrifugalni ventilator-dvostransko sesanje , pertok 1,5 m3/s

GOLD Wing zmanjša padec tlaka v kolenu centrifugalni ventilator Novi GOLD GOLD Wing zmanjša padec tlaka v kolenu centrifugalni ventilator GOLD Wing 3,8 m/s 9,4 m/s 200 Pa 5 Pa 600 600

GOLD potrebuje manj prostora Novi GOLD GOLD potrebuje manj prostora

Visoka električna učinkovitost Centrifugalni ventilator Novi GOLD Visoka električna učinkovitost 1000 3,8 m/s 5 Pa 11 12 21 22 31 32 500 400 600 Totalni tlak, Pa 300 GOLD Wing 11 12 21 22 31 32 200 9,4 m/s 200 Pa 100 0,1 0,2 0,3 0,4 0,5 1 2 3 4 5 600 pretok , m3/s Centrifugalni ventilator Max. karakteristika SFPv = 2,5 kW/(m3/s)

Visoka električna učinkovitost centrifugalni ventilator Novi GOLD Visoka električna učinkovitost 1000 3,8 m/s 5 Pa 11 12 21 22 31 32 500 400 600 totalni tlak, Pa 300 GOLD Wing 11 12 21 22 31 32 200 11 12 21 22 31 32 9,4 m/s 200 Pa 100 0,1 0,2 0,3 0,4 0,5 1 2 3 4 5 600 pretok, m3/s centrifugalni ventilator Max. karakteristika SFPv = 2,0 kW/(m3/s)

Visoka električna učinkovitost centrifugalni ventilator Novi GOLD Visoka električna učinkovitost 1000 3,8 m/s 5 Pa 11 12 21 22 31 32 500 400 600 totalni tlak, Pa 300 GOLD Wing 11 12 21 22 31 32 200 11 12 21 22 21 22 31 32 31 32 9,4 m/s 200 Pa 100 0,1 0,2 0,3 0,4 0,5 1 2 3 4 5 600 pretok, m3/s centrifugalni ventilator Max. karakteristika SFPv = 1,5 kW/(m3/s), stl. 21-32

Dušilnik zvoka pogosto odpade Novi GOLD Dušilnik zvoka pogosto odpade

Rotacijski rekuperator Turbo Temperaturni izkoristek do 85%! Novi GOLD Rotacijski rekuperator Turbo Odpadni zrak Odvodni zrak Zunanji zrak Dovodni zrak Temperaturni izkoristek do 85%!

Grelnik zraka lahko odpade Novi GOLD Grelnik zraka lahko odpade

Varčno delovanje zagotavlja nizke obratovalne stroške! Novi GOLD Varčno delovanje zagotavlja nizke obratovalne stroške! Vzdrževanje, 5% Investicija, 15% Visok izkoristek ventilatorja Visok izkoristek rekuperatorja Operation, 80% Veliko ekonomičnih nastavitev

Regulacijski sistem GOLD GOLD regulacija krmiljenje ventilatorja regulacija temperature dogrevanje hlajenje nadzor Regulacijski sistem GOLD

GOLD regulacija Krmiljenje ventilatorja Regulacija temperature Dogrevanje Hlajenje Nadzor konst. zračni pretok ERS kontrola brez grelnika vodni hladilnik stikalna ura povečan zračni pretok regulacija dov. zraka DX hladilnik daljinski stop, nizka-visoka vodni grelnik VAV regulacija regulacija odv.zraka električni grelnik

GOLD regulacija Krmiljenje ventilatorja Regulacija temperature izpihovanje rekuperatorja izbira pretočne enote kompenzacija zunanje temp. ponovni vklop, DX hladilnik 1 stopnja avtomatski preklop leto/zima nizka/visoka hitrost ročna nastavitev rekuperacija hladilne energije zaščita pregretja el. grelnika časovna nastavitev, visoka hitrost nevtralno področje ročna nastavitev rekuperator itd izbira smeri pretoka poletno nočno hlajenje protizmrzovanje vodni grelnik povečano hlajenje Krmiljenje ventilatorja Regulacija temperature Dogrevanje Hlajenje Nadzor

GOLD regulacija Nastavitve Trenutne temperature in hitrosti zraka Air purging of the heat exchanger Alarmi s pojasnili - na primer za: filtre rekuperator temperature potreben servis ventilatorje Nastavitve Trenutne temperature in hitrosti zraka Choice of flow unit Outdoor tempera-ture compensation Restart time, DX cooling in 1 stage Automatic change-over - summer/ winter time Low speed/high speed individual flows for SF/EF Cooling energy recovery Recooling for electric air heater Timer function, high speed Neutral zone Manual operation, fans, heat exch., etc. Choice of direction of air flow Summer night cooling Anti-frosting moni-tor for water coil Boosted cooling Fan control Temperature control Reheating Cooling Control

GOLD regulacija Settings Current temperatures and air flow rates Air purging of the heat exchanger Settings Current temperatures and air flow rates Alarms with explanation in plain text for instance for: Filters Heat exchanger Temperatures Service required Fans Choice of flow unit Outdoor tempera-ture compensation Restart time, DX cooling in 1 stage Automatic change-over - summer/ winter time Predožičeni vhodi/izhodi zunanji vhod, ustavitev zunanji vhod, nizka hitrost zunanji vhod, visoka hitrost prenastavitev temperature ali zračnega pretoka indikacija pretoka dovod in odvod zraka daljinsko resetiranje alarma indikacija obratovanja indikacija obratovanja, visoka hitrost alarmi A in B Low speed/high speed individual flows for SF/EF Cooling energy recovery Recooling for electric air heater Timer function, high speed Neutral zone Manual operation, fans, heat exch., etc. Choice of direction of air flow Summer night cooling Anti-frosting moni-tor for water coil Boosted cooling Fan control Temperature control Reheating Cooling Control GOLDen EYE LON