Tampa Hillsborough Expressway Authority

Slides:



Advertisements
Similar presentations
IDOA Office Supply and Toner Products Pre-Proposal Conference May 10, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
Advertisements

Impact 100 Women Together, Changing Lives. COMMON GRANT TRAINING.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004 Presenter: Anna Mosupyoe and Ravi Moodley Date: 24 January 2012 Time: 10:00.
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
IDOA RFP Media Buy Pre-Proposal Conference June 11, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Informational Webinar Troy Grant Assistant Executive Director for P-16 Initiatives Tennessee Higher Education Commission.
Byrne Criminal Justice Innovation Program (BCJI) FY 2015 Funding Overview March 12, 2015 Byrne Criminal Justice Innovation Program (BCJI) FY 2015 Funding.
Procurement & Strategic Sourcing
State of Utah Small Package Delivery Services States Kickoff Webinar
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Submitting a Responsive Proposal
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
2nd Street Drainage and Paving Improvements
Four Winds Condominium Association August 2, 2017
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004
S.R. 30A / U.S. 98 / Panama City Beach Parkway
June 5, 2017.
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
TRAVEL SERVICES Request for Proposal
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
Joint Parking Task Force Update Procurement & Strategic Sourcing
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Public Information Meeting NW 100th Street Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meeting of the Hillsborough MPO Board December 5, 2017
Tampa Hillsborough Expressway Authority Industry Forum 6/15/2018.
Florida Transportation Commission FY 2009
Request for Proposal and Specifications for
Request for Proposal and Specifications for
Administrator of Construction Todd Wilson Senior Project Manager
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
SR 400 Express Lanes: Market Sounding
Washington Metropolitan Area Transit Authority (WMATA)
PROJ. 566(17) LOR PID MAJOR WIDENING
Proposal Writing Tips Ivan Page L.A.C.M.T.A.
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
ApprenticeshipNC Regional Collaboration and Expansion Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
Tampa Hillsborough Expressway Authority Industry Forum 2/8/2019.
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Harbour Island Force Main Replacement
DESIGN-BUILD PROGRAM OVERVIEW
U.S. 20 at State Road 2 New Interchange
Procurement & Strategic Sourcing
FY2019 TDHCA Emergency Solutions Grant Overview
SP TH 169 Redefine Informational Meeting July 25, 2019
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session The Road Accident Fund 05 August 2013.
East Selmon Capacity Project PD&E Study Industry Forum
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Tampa Hillsborough Expressway Authority South Selmon Safety DB Mandatory Pre- proposal Meeting 7/11/2018

Introductions Man Le – THEA Contracts & Procurement Manager Joe Waggoner– THEA Executive Director Dave May, PE – THEA Director of Expressway Operations Bob Frey, AICP – THEA Planning Director Christina Kopp, AICP – THEA Project Manager Sue Chrzan – THEA Director of Public Affairs & Communication Jim Drapp, PE – THEA GEC Doug Burkhart, PE – THEA GEC Dan D’Antonio, PE,PTOE – THEA GEC

Project Roles Tampa Hillsborough Expressway Authority (THEA)- Owner/Developer/Operator HNTB- General Engineering Consultant (GEC) to THEA Tierra- Geotechnical Consultant to GEC & THEA Omni- Utilities Consultant to GEC & THEA Playbook- Public Involvement Consultant to THEA Dave May, PE- THEA Project Manager Doug Burkhart, PE- GEC Project Manager

Agenda Project Overview & Objectives Other Projects Public Involvement Innovative Aspects & ATC’s Written Technical Proposal/Schedule Page Turn Meeting Q & A Session Scoring SBE DB Stipend TRC Members & Technical Advisors Project Documents Questions

Project Overview & Objectives Project Limits- Himes Ave. to Hyde Park Ave. Project Goals Full Depth Paved Median with Barrier Wall Typical Sections TTCP/Work Hours Sign Structures Lighting Project Information

Project Limits

Project Goals Improve safety to the corridor within the limits described. Minimize the inconvenience to the travelling public. Minimize environmental impacts, including impacts to established wetlands, to the maximum extent possible. Maintain or improve, to the maximum extent possible, the quality of existing traffic operations, both in terms of flow rate and safety, throughout the duration of the Project. Minimize the number of different Traffic Control Plan (TCP) phases, i.e., number of different diversions and detours for a given traffic movement. Maintain direct access to adjacent properties at all times, with the exception in areas of limited access Right-of-Way where direct access is not permitted. Coordinate with adjacent construction projects and maintaining agencies. Minimize the inconvenience to adjacent residences including minimizing night work, noise and temporary construction lighting.

Project Overview & Objectives Project Limits- Himes Ave. to Hyde Park Ave. Project Goals Full Depth Paved Median with Barrier Wall Typical Sections TTCP/Work Hours Sign Structures Lighting Project Information

South Selmon Median Safety DB Project Existing Typical Sections

South Selmon Median Safety DB Project Typical Sections

TTCP/Work Hours Project Limits- Himes Ave. to Hyde Park Ave. Lanes Closures typically not allowed between the hours of: 5:00 AM to 9:00 AM 3:00 PM to 7:00 PM Work Hours Minimize noise and light impacts to adjacent residences Adjustments to Work Hours/Lane Closures may be considered through the ATC process through showing compelling benefits to THEA and adjacent residents Minimize phases and lane shifts Railroad Coordination as required Public Involvement

Sign Structures Remove and replace the following structures: Overhead truss over the westbound lanes north of El Prado Boulevard Overhead truss over the eastbound lanes south of Platt Street Overhead truss over the eastbound lanes west of S. Boulevard The following structures will be removed and not replaced: Overhead truss over the eastbound lanes located east of Willow Avenue Overhead truss over the westbound lanes west of Hyde Park Avenue

Sign Structures

Sign Structures

Sign Structures

Sign Structures

Project Overview & Objectives Project Limits- Himes Ave. to Hyde Park Ave. Project Goals Full Depth Paved Median with Barrier Wall Typical Sections TTCP/Work Hours Sign Structures Lighting Project Information

Agenda Project Overview & Objectives Other Projects Public Involvement Innovative Aspects & ATC’s Written Technical Proposal/Schedule Page Turn Meeting Q & A Session Scoring SBE DB Stipend TRC Members & Technical Advisors Project Documents Questions

Selmon West Extension Project

Selmon Expressway South Capacity Project Project Overview Selmon Expressway from Selmon West Extension to Whiting Street PEIR: PD&E study will be conducted as a PEIR No state or federal funds Follow procedures and requirements set forth in FDOT PD&E manual

Selmon Expressway South Capacity Project Typical Sections

Selmon Expressway South Capacity Project Typical Sections

Selmon Expressway South Capacity Project Typical Sections

Schedule Procurement: August, 2018 – January, 2019 PIER: February, 2019 – February, 2021 Public Meetings: December, 2020

Public Involvement THEA Public Information Officer (PIO) will- Send Out Weekly Lane Closure Notifications Send Out Bi-weekly Project Status Emails Maintain and Update Project Website Post Updates on Social Media Design Build Team will Coordinate Closely with PIO Design Build Team will Attend Meetings with the Public to Provide Quick Response to the PIO that will Address Construction Issues Design Build Team will Proactively Report any Interaction with the Public to the PIO Design Build Team will Attend Meetings with Homeowners Associations or other groups as Requested by the PIO Design Build Team will Provide Support as needed by PIO

Innovative Aspects & ATC’s The following will not be considered: Reduction in the begin and end Project limits Reduction in the number of lanes and lane widths as depicted in the Typical Section Package and Concept Plans Reduction in permanent Design Speeds on all State or local roads Reduction in the Access Classification and Control, or changes to the access management or property access requirements Reduction in the minimum storage lengths at intersections, as depicted in the Concept Plans Elimination of tolling point locations Elimination or relocation of proposed median openings shown in the Concept Plans Elimination of tolling site and equipment ATC’s (One Round only) will follow standard FDOT process

Written Technical Proposal Submit 1 Original, seven (7) Flash Drives containing the Technical Proposal in PDF format and seven (7) collated, complete sets of hard copies, including roll plots New Times Roman type font, minimum font size ten (10) Project Approach- Maximum of 10 pages 8 ½” x 11” sheets Schedule Narrative for Design & Construction with Bar Charts showing Critical Path. Duration w/no WAR Plans Plan & Profile Sheets (Roll Plots or 11’ x17’ sheets) Roll Plots (Max. Width- 36”, Max. Length- 48”) All Others (11” x17” sheets) TSP’s

Page Turn Meeting 60 minutes followed by 5 minutes of THEA questions One unaltered Aerial Photo or Map allowed No other handouts, electronic presentations, etc. other than copies of the submitted Written Technical Proposal No questions allowed by the DB Team Maximum of 8 attendees of the DB Team allowed

Q & A Session 60 minutes in length No other handouts, electronic presentations, etc. other than copies of the submitted Written Technical Proposal No questions allowed by the DB Team Some questions, but not necessarily all will be provided to each DB Team approximately 24 hours prior to their Q& A Session

Scoring Element: Points: Price Proposal scoring: Letter of Interest 20 Design 10 Construction 10 MOT 15 Schedule 15 Price 30 Total Possible Points: 100 Price Proposal scoring: X/Y multiplied by 30 Where: X = the lowest Scored Price as proposed by any responsive Proposer Y = the Scored Price proposed by Proposer A = Proposer’s Price Proposal score, to three decimal places

Procurement Schedule Thurs., Aug. 2, 2018 Deadline to request participation in ATC Mtg. No. 1 Thurs., Aug, 9, 2018 Deadline to submit Preliminary List of ATC’s prior to ATC Meeting No. 1 Wed., Aug. 15, 2018 One-on-One ATC Meetings Tues., Aug. 28, 2018 Deadline to submit ATC Concept Proposals & Design Exceptions or Variations Fri., Aug. 31, 2018 Deadline to submit Questions prior to Technical Proposal Fri., Sept. 7, 2018 Deadline for Authority to post Responses to Questions Fri., Sept. 28, 2018 Technical Proposals Due Wed., Oct. 3, 2018 Deadline to “opt out” of Technical Proposal Page Turn Meeting Thurs., Oct. 11, 2018 Technical Proposal Page Turn Meetings Wed,. Oct, 24, 2018 Question & Answer Sessions Thurs., Nov. 1, 2018 Deadline to submit Written Clarification Letter following Q & A Sessions and Questions prior to submission of Price Proposal Tues., Nov. 6, 2018 Deadline for Authority to post Responses to Questions Mon., Nov. 12, 2018 Price Proposals Due, announcing of Technical Scores, and posting of Final Scores and Bid Prices Mon., Nov. 26, 2018 Public Meeting of Selection Committee & posting of Award Fri., Nov. 30, 2018 Anticipated Award Date Tues., Dec. 18, 2018 Anticipated Execution Date n

SBE THEA’s Small Business Enterprise (SBE) Policy requires nondiscrimination on the basis of race, color, national origin, and gender in its employment and contracting practices and encourages the solicitation and utilization of SBE’s. This means that the Authority’s goal is to spend a portion of the highway dollars with Certified SBE’s as prime Design-Build Firms or as subcontractors. Race-neutral means that the Authority believes that the overall goal can be achieved through the normal competitive procurement process. THEA has exceeded 15% SBE participation on its program for the last several years.  

DB Stipend $46,166 per non-selected shortlisted Design-Build Firm that meets the stipend eligibility requirements Design-Build Firm must fully execute with original signatures and have delivered to the Authority no later than July 18, 2018, four (4) originals of the Design-Build Stipend Agreement. TSP’s

TRC Members and Technical Advisors South Selmon Median Safety DB Project: TRC Members: Dave May, PE – THEA Bob Frey, AICP – THEA Christina Kopp, AICP – THEA Technical Advisors: Sue Chrzan – THEA Jim Drapp, PE – THEA GEC Doug Burkhart, PE – THEA GEC Julian Gutierrez, PE – THEA GEC Dan D’Antonio, PE, PTOE – THEA GEC

Project Documents http://www.tampa-xway.com/procurement/# The cone of silence remains in place for all THEA, HNTB, Tierra and OMNI staff. All questions should be emailed to Man Le, THEA Contracts & Procurement Manager: man.le@tampa-xway.com Answers will be posted on the THEA website

Questions?