ERL BPM System Mike Billing, Mark Palmer

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Feedback for CESR TA Michael Billing May 17, 2007.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 First Results from the Mesa Beam Profile Cavity Prototype Marco Tarallo 26 July 2005 Caltech – LIGO Laboratory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
INFN- Legnaro National Lab. Activity on ESS DTL Diagnostics: BPM & BCM
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CESR-c and ILC Damping Ring Instrumentation
Beam Commissioning Adam Bartnik.
EUROTeV Diagnostics WP5
Phase Feed-Forward Piotr Skowroński (CERN)
LCLS_II High Rep Rate Operation and Femtosecond Timing
Diagnostic & Control Status
RF Synchronization Activity
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
F.Marcellini, D.Alesini, A.Ghigo
LLRF and Beam-based Longitudinal Feedback Readiness
Fill-pattern Control System for KEKB
Intra-Pulse Beam-Beam Scans at the NLC IP
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Limits on damping times
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Fast Orbit Feedback at the SLS
Linac Diagnostics Commissioning Experience
The LHCb Front-end Electronics System Status and Future Development
Breakout Session SC3 – Undulator
Isotope Readiness Review Run Plans
Presentation transcript:

ERL BPM System Mike Billing, Mark Palmer (J. Dobbins, C. Strohman, E. Tanke) Outline: Overview Parameters Stripline Design and Status Readout Plan Readout Hardware Overview Performance Interface Diagnostic Capabilities Implementation Plan

Overview Requirements: Hardware Need to know all operating configurations for which BPM measurements needed Bunch structure Full possible current range Required position resolution How many bunches to average over Etc Need to specify timing system interface Hardware Will describe progress on stripline development Will give an overview of readout electronics Front Ends Timing Digital Processing DAQ 11/22/2018 ERL BPM System

Parameters Bunch Charge Bunch Length Bunch Spacing BPM Orientation ~8 pC to 80 pC Bunch Length 0.6 -1 mm Bunch Spacing 25 ns 40 MHz Laser Rep Rate 0.77 ns 1.3 GHz Rep Rate 2.3 ns 1.3 GHz/3 Rep Rate Future Interleaved Accelerating & Decelerating Bunches BPM Orientation In plane? 45 degree? Beampipes Striplines for 3.0” OD pipe Other??? BPM Count (and when) Room 128: 4 (early Fall) Phase Ia: ??? Beyond… Resolution Requirements ??? mm Readout Requirements Position Current? Phase? Averaging vs Bunch-by-Bunch Etcetera 11/22/2018 ERL BPM System

Stripline Design & Status Feedthrough Testing Kyocera, MPF, Ceramaseal Ceramaseal checked out for 50W with r < 0.2% while others were ~3-6% Need to place order Stripline Pipe 2.37” ID 3.0” OD Striplines Nominal 30 degree l/4 length 50 W ~1% reflection coefficient Tapered section for impedance matching All tests done without welding 20 mr / div & 0.1 ft/div 11/22/2018 ERL BPM System

Readout Plan 11/22/2018 ERL BPM System

Readout Hardware Overview Use existing BPM module 8-channel BPM Allows for IQ measurement Phase-locked loops CESR 24 MHz 72 MHz ERL 40 MHz 80 MHz Jumper controlled TigerSHARC DSP Ethernet - 100MBit Coldfire chip RTEMs EPICs IOC 11/22/2018 ERL BPM System

Performance Signal Characteristics Noise and Resolution Bunch – use 80 pC Ipeak ~ 10 Amps Tbunch = 0.77 ns Stripline fstrip ~ 0.5 rad Vpeak ~ 20 V x or y ~ 15 mm (D/S) Resonant Circuit Filter Q ~ 20 Center Frequency ~ 1.3 GHz BW ~ 65 MHz Peak Signal Ratio ~ 0.07 Digital Sampling Tavg = 1 ms Navg = 80 (digital averages) Nbunch = 1300 bunches (in 80 avg’s) Noise and Resolution Noise dominated by digital sampling. Fractional errors: sfrac ~ 10-3 (single sample) savg ~ 10-4 Position Resolution sposition ~ 1-2 mm 11/22/2018 ERL BPM System

Interface Communications/Control DAQ Software Present status ERL Plan Control thru XBus interface (MPM access) Ready to test ethernet interface for data transfers ERL Plan All operations via Ethernet Several questions: EPICs IOC in each module? Intermediate level IOC? What level of data processing desired in DSP? DAQ Software Low-level code based on transfers of data packets which are mapped into C structures Replace MPM packet transfers with suitable EPICs packet transfer routines Preserve rest of the existing DAQ (C code) 11/22/2018 ERL BPM System

Diagnostic Capabilities Required Measurement Modes Quad/RF Cavity Reference Centering Stability Mechanical Electronic Optics Correction Beta or phase Coupling Dispersion in arcs Measurement type DC or transient? Pulsed or CW? Trajectory correction and feedback Current Monitoring Fast Feedback Input Timing System Integration/Requirements 11/22/2018 ERL BPM System

Implementation Plan Immediate plans Short-term plans Room 128 BPMs Stripline Prototype Cut final test strip (#3) Weld unit Bench test Electronics Order parts for 6 BPM readout modules Finish Engineering Design Vacuum connections Address trapped volumes Finalize specifications Short-term plans Order all parts Construct first full BPM Prep 1st ERL readout module Prepare beampipe modifications for installation at end of CESR Linac Install during June shutdown Beam test shortly thereafter Use 72 MHz timing Room 128 BPMs Incorporate final modifications by July Produce striplines by early Fall Assemble and test first 4 readout modules by early Fall Finalize DAQ software by early Fall 11/22/2018 ERL BPM System