Update on “IPPC implementation” and “Competitiveness” studies

Slides:



Advertisements
Similar presentations
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
Advertisements

Can financial services in developed countries remain on a long-term basis within postal organizations or is separation inevitable? TIP Conference, ,
European integration 1www.ecb.europa.eu © Progress of European integration 1952ECSC European Coal and Steel Community 1958 EEC and EURATOM European Economic.
Ecdc.europa.eu October 11, 2007, WarsawTsvetan Bogdanov Student Mobility in Sofia University: Tendencies and Perspectives.
National Workshop on Labour Inspection and Undeclared Work 29 – 30 October 2009 Budapest, Hungary Labour Inspection and Posted Workers: The Bulgarian Experience.
Directive 95/50/EC TDG Checks Application of Annexes Erkki Laakso EUROPEAN COMMISSION DG ENERGY & TRANSPORT TDG Checks Riga June 2006.
7 November 2006VI Eurosai Training Event - Prague1 Auditing EU funds – National SAI experiences Jan van den Bos – Netherlands Court of Audit.
EIPA CAF Resource Centre CAF CAF activities – state of affairs Patrick Staes & Ann Stoffels EIPA CAF Resource Centre Berlin, 8-9 February 2007.
IGLO Aim IGLO is an informal association of Brussels- based non-profit R&D Liaison Offices. The aim of IGLO is: to facilitate and enhance the interaction,
EIE- Surveyor 1 Financial aspects ► 40 % amount 45 days after initial contract (about December2005) ► 40 % 45 days after approval of the progress report.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Progress of European integration
RACIST VIOLENCE AND CRIME IN THE EU: From Official Data to Victim Surveys Sofia – CSD September 2006 Dr. Jo Goodey Programme Manager – Research.
TRADE CONTACT GROUP Brussels 9th June 2009 Agenda item 3a) State of play of IT systems: Import Control System (ICS); Export Control System (ECS); New.
Marine Strategy Framework Directive: activities of WG DIKE
Working Group on Data, information and knowledge exchange
Tracking of VET graduates Presentation for the EQAVET Annual Network meeting 20 June 2018 Koen Bois d'Enghien DG EMPL unit E3 VET, apprenticeships and.
Point 5. Countries plans on Time Use Surveys
Expert Hearing on Data Protection Legislation and ESF Reporting
Support to National Helpdesks
Agenda Item 8(b): Progress with data collection template
Support to National Helpdesks
Patrick Staes and Ann Stoffels
ESF FINANCIAL EXECUTION PART 1 STATE OF PLAY END 2016
CAF Activities.
Adult Education Survey
GBV survey: progress EUROSTAT 20 March 2018.
State of play of PA and OP negotiations
Consultation process on Milieu's national technical reports Part of Commission Assessment process on art. 11 On technical country reports : Letters and.
Carl Bro a/s - Team Leader - IPPC-experts - Quality Assurance
MSFD Scoreboard Status at 23 November 2012 Belgium Bulgaria Cyprus
EUPAN/TUNED social dialogue meeting , Stockholm
Marine Strategy Framework Directive: Transposition and Implementation
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Human Resources Management Performance Assessment: Czech Presidency
State of play of OP negotiations
PRODUCTION RETAIL SALES CONSUMER PRICES
Working Group A ECOSTAT Summary Milestone Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
Overall 2011 ESF Budget Execution
Expert Advisory Forum on priority substances
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Item 8.1 Implementation of the 2016 Adult Education Survey
Cross Acceptance State of play Jan 2014 RISC.
Marine Strategy Framework Directive: Status of reporting
Marine Environment and Water Industry Unit
Marine Strategy Framework Directive: Status of reporting Art. 8/9/10
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Marine Strategy Framework Directive: Transposition and Implementation
Advisory Group Meeting Presentation of Draft Final Report
New voting rules in Regulatory Committe
Steering Committee, Eurostat, Luxembourg, 4 February 2011
DG Environment, Unit D.2 Marine Environment and Water Industry
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
Collecting methodological information on regional statistics
Environmental objective document –
Legal and implementation issues update
Meeting of Water Directors State of transposition and implementation
Assessment of Reporting on Competent Authorities
Exemptions and Disproportionate Costs
Update on legal issues Strategic Coordination Group
WG Integrated Testing in Pilot River Basins
Marine Strategy Framework Directive: Status of reporting
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE
Evaluation of Public Administrations‘ Added Value to the Lisbon Strategy Goals Dr Gordana Žurga.
Quality project regional GVA and employment
Review of BWD reporting for 2009 season (Item 2)
Presentation transcript:

Update on “IPPC implementation” and “Competitiveness” studies - Advisory Group 23 May

Permitting status analysis Permitting data received by the Commission for all MS except 6 Telephone interviews of AG MS : “IPPC implementation proforma” sent to all MS ; 9 interviews carried out, 4 scheduled to take place – remainder to be carried out by end June

Selection of specific installations Selection criteria after consultation with AG Determination of installations with “IPPC permits” (information from MS) Contacts with operators and competent authorities to ask for cooperation

Selection of 30 specific installations (+30 reserve) Iron & Steel Non-Ferrous Metal Cement Chemicals Textiles Pulp & Paper Total UK 2 6 France Germany Sweden 4 Spain Italy Portugal Greece Hungary Poland Czech Republic Lithuania 12 8 10 60

State of play Identification of installations finalised except for Italy Agreement with competent authorities and operators for 18 out of 27 installations Waiting for response from operators for 9 out of 27 installations No agreement of operators: for 2 installations Site visits completed for 2 installations

Next steps Complete site visits: end July (depending upon Italy etc.) Analysis and further exchange with CA / operators: summer Draft final report presented to 3rd Advisory Group meeting on 25 October Final report presented to IEG in 2007

Key issues Timely response to information requests and exchange of information is key to progression of the study Participation of operators and CAs is critical to success of the study Based on the 2 completed site visits, the data collection and reporting template approach appeared to work very successfully

Competitiveness Study Selection of sectors: domestic glass / steel production by electric arc furnaces Preparation questionnaire: consultation AG Questionnaire sent out to operators: beginning May Expected responses: End May

Electric steel making Questionnaires sent out to 120 installations Questionnaires not sent to authorities (focus on economic issues) but MS AG informed 10 MS concerned: UK, FR, DE, ES, IT, PL, SE, BE, LU, PT

Domestic glass Questionnaires sent out to 50 installations Covers IPPC and non IPPC installations Most MS concerned but more than 4 installations only in FR, DE, IT, CZ, AT

Next steps Analysis of responses to questionnaires Site visits in about 6-10 installations / headquarters Preparation of sectoral surveys Draft final report for comments to AG

Key issues Timely and sufficiently high response to questionnaires Co-operation with operators to set up interviews and site visits Information on MS implementation shared with the “implementation study” 2 “common installations” with the “implementation study” - coordination of information request and possible joint site visits