TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Advertisements

Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGn Opening Report - Nov 10 ‘08
IEEE TGai Closing Report
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGaf Waikoloa Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Opening Report - Jan 19 ‘09
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Taipei, TW 802 Interim –18 Jan ‘08
TGn Opening Report - Sep 08 ‘08
TGn Opening Report - Sep 08 ‘08
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Opening Report - Nov 10 ‘08
TGn ad hoc Opening Report - Sep ‘08
TGn Closing Report Los Angeles, CA, US 802 Interim
Sept 2008 Closing Plenary Motions
Sept 2008 Closing Plenary Motions
TGaf Waikoloa Closing Report
Mar 2010 Closing Plenary Motions
Supplementary Plenary Information - May 2010
TGn Opening Report - Sep 08 ‘08
TGu Teleconference Motions
TGad March 2011 Closing Report
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Opening Report - Jan 19 ‘09
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Opening Report - Sep 08 ‘08
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
TGn Closing Report Montreal, Quebec, CA 802 Interim – 18 May ‘07
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGm Closing Report – May 2010
TGn Closing Report – July ‘06
TGaf Orlando Closing Report
TGn Closing Report Orlando, FL, US 802 Plenary – March ‘07
TGn Closing Report – September 24 ‘09
TGn Opening Report - Nov 10 ‘08
May 2008 Closing Plenary Motions
January 2012 doc.: IEEE /0179r1 Jan 2012
IEEE TGai Closing Report
TGn Closing Report - July 19 ‘07
IEEE aj May Closing Report
Presentation transcript:

TGn Closing Report Jacksonville, FL, US 802 Plenary – 12-16 May ‘08 March 2008 doc.: IEEE 802.11-08/0420r0 May 2008 TGn Closing Report Jacksonville, FL, US 802 Plenary – 12-16 May ‘08 Date: 2008-05-16 Authors: Name Company Address Phone email 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) 427-4098 Bruce Kraemer Marvell bkraemer@ marvell .com Sheung Li SiBEAM +1 (408) 245-3120 sli@sibeam.com 555 Mathilda Ave, Sunnyvale, CA 94085 Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) 616-3800 adrian.p.stephens@ intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer, Marvell

Comments resolved in ONE meeting May 2008 Draft 4.0 Comments resolved in ONE meeting Bruce Kraemer, Marvell

March 2008 doc.: IEEE 802.11-08/0420r0 May 2008 TGn Motion Having approved comment resolutions for all of the comments received from LB124 on Draft 4.0, Move to instruct the editor to prepare Draft 5.0 incorporating these resolutions and begin as soon as possible, a 15 day Working Group Recirculation Ballot asking the technical question “Should 802.11n Draft 5.0 be forwarded to Sponsor Ballot?” TG: 17 Approve, 0 Not Approve, 1 Abstain. Bruce Kraemer, Marvell Bruce Kraemer, Marvell

Primary Meeting Documents March 2008 doc.: IEEE 802.11-08/0420r0 May 2008 Primary Meeting Documents Chair’s Opening Report 11-08-0503r4 Chair’s Closing Report 11-08-0504r0 Meeting Minutes 11-08-0505r0 Editor’s Report 11-08-0506r0 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

TGn Teleconference Plan March 2008 doc.: IEEE 802.11-08/0420r0 May 2008 TGn Teleconference Plan Call time: 11:00 – 13:00 ET Call number: 916-356-2663 Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode May 14 Interim May 21 Ballot 5 4280855 May 28 3437119 June 04 9940853 June 11 4866177 June 18 TGn Bruce Kraemer 1690388 June 25 7894042 July 02 9885719 July 09 1612862 July 16 Plenary Bruce Kraemer, Marvell Bruce Kraemer, Marvell

May 2008 Time Line proposal No changes to time line dates during this meeting but reassess dates during the July plenary meeting after conclusion of recirculation ballot on D5.0 TG: Approved unanimously Bruce Kraemer, Marvell

Currently Published Date March 2008 doc.: IEEE 802.11-08/0420r0 May 2008 802.11 Timeline Events Event Name Currently Published Date Actual Predicted PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Recirculation Sponsor Ballot Nov ‘08 Final WG Approval Mar ‘09 Final EC Approval RevCom/ Stds Board Approval Jun ‘09 Publication Jul ‘09 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

Ad hoc in July 2008 Request authorization for TGn to hold an ad hoc May 2008 Ad hoc in July 2008 Request authorization for TGn to hold an ad hoc on Dates July 10, 11 (Thur, Fri) in Denver, CO, US with the venue of choice being the 802 Plenary conference hotel (Hyatt Regency Denver) for the purpose of resolving comments received during LB1xx on Draft 4.0 Bruce Kraemer, Marvell