IMT-Advanced Opening Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1429r0 Submission November 2008 Bruce Kraemer (Marvell); Darwin Engwer (Nortel)Slide 1 IMT-Advanced Closing Report Date:
Advertisements

Doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.
Doc.: IEEE Submission March 2008 Michael Lynch, Nortel Networks Update on ITU-R and IMT-Advanced At the November meeting IEEE 802:
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: _SEC_Motions_Mar08 Submission March 2008 Michael Lynch, Nortel Networksh Motion to SEC Motion by: LynchSeconded by: Heile.
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Doc.: IEEE /0172r0 Submission January 2008 Bruce Kraemer (Marvell); Darwin Engwer(Nortel)Slide 1 IMT-Advanced Opening Report Date:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: IEEE /0506r0 Submission January 2007 Bruce Kraemer, MarvellSlide 1 IMT-Advanced Report Tech Requirements Outline Date: Authors:
Suggestion to update Work Plan for IEEE m Standard
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
[RR-TAG Liaison Report to ]
November 2008 doc.: IEEE /1437r1 July 2011
IMT-Advanced Opening Report
ETSI Liaison Request November 08
IMT-Advanced Report Tech Requirements Outline
IMT-Advanced Opening Report
Revision Process Summary
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
IMT-Advanced Report Tech Requirements Outline
Submission Title: [WG-Regulatory Report November07]
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
IMT-Advanced – Numerical Justification
IEEE MEDIA INDEPENDENT HANDOVER
IEEE Shop Contents Date: Authors: Name Company Address
Energy STAR ad hoc Closing Report - January 2010
Smart Grid ad hoc Closing Report – May 2011
RR-TAG Liaison Report January 2008 IEEE
RR-TAG Opening Report Report on May 2008 interim meeting
IEEE 802 IMT-Advanced Technology Proposal Process
IMT-Advanced Closing Report
IMT-Advanced Closing Report
Possible liaison motion for IEEE as an IMT-2020 technology
TGn Closing Report Vancouver, BC, Canada 802 Plenary
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE – Liaison Report] Date.
Smart Grid Closing Report – November 2010
IEEE IMT-Advanced Review Process
RR-TAG Opening Report Report on November 2007 plenary meeting
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IMT-Advanced Technical Requirements
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
ETSI Liaison Requests November 08
IEEE 802 IMT-Advanced Technology Proposal Process
TGn Closing Report Los Angeles, CA, US 802 Interim
IEEE IMT-Advanced Review Process
RR-TAG Closing Report Report of the March 2011 Plenary meeting
Smart Grid Update – January 2011
IMT-Advanced Opening Report
RR-TAG Closing Report Report of September 2008 plenary meeting
GEN ad hoc Summary - Sep 14 ‘07
TGn Closing Report Vancouver, BC, Canada 802 Plenary
IMT-Advanced Status Report
IMT-Advanced Closing Report - March 2007
IMT-Advanced – Mid-week Report - March 2007
TGn Draft Redline Notice
Submission Title: [WG-RR TAG Liaison Report January08]
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
WG11 Snapshot May 08 Date: Authors: Name Company Address
TGn Closing Report – September 24 ‘09
IMT-Advanced Closing Report
Plenary Information - September 2009
WBA Carrier Wi-Fi Liaison request - March 2014
WG16 IMT Workshop Suggestion
Presentation transcript:

IMT-Advanced Opening Report May 2008 doc.: IEEE 802.11-07/0694r0 May 2008 IMT-Advanced Opening Report Date: 2008-05-15 Authors: Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 bkraemer@ marvell .com Darwin Engwer Nortel Networks 4655 Great America Pkwy, Santa Clara CA 95054 408 495 2588 dengwer@nortel.com Bruce Kraemer (Marvell); Darwin Engwer(Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

No significant changes or compromises have occurred May 2008 doc.: IEEE 802.11-07/0694r0 May 2008 History First (Admin) portion of IMT-Advanced Circular letter was released following January WP5D meeting in Geneva Updates IMT.Tech & IMT.EVAL correspondence groups met to discuss contents of their respective Annex 4 & Annex 7 sections No significant changes or compromises have occurred Discussions will continue during Dubai meeting beginning June 24. Goal is to agree upon all technical requirements and evaluation criteria Release of final circular would follow No plan to use telecons to develop further inputs to meeting Report on results to be presented in July plenary Additional details in 11-08-0546 Bruce Kraemer (Marvell); Darwin Engwer(Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

CALL FOR Technology Proposals May 2008 doc.: IEEE 802.11-07/0694r0 May 2008 CALL FOR Technology Proposals CALL FOR Technology Proposals: The IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) invites advanced technology proposals drafted in accordance with applicable ITU-T Next Generation Networks (wired) and ITU-R IMT-Advanced (wireless) submission requirements. The RR-TAG will announce the availability of the final submission requirements when they are published by ITU-T and the ITU-R. The RR-TAG requests each Working Group interested in participating in this process to indicate their intentions to the RR-TAG Chair, Michael Lynch, mjlynch@nortel.com. Source: 11-08-0624 Bruce Kraemer (Marvell); Darwin Engwer(Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

Circular Letter Structure May 2008 Circular Letter Structure Circular Letter Main Body Annex 1 Summary of Framework of IMT-Advanced Annex 2 Submission and evaluation process and consensus building Annex 3 Service requirement Annex 4 Technical system and performance requirement Annex 5 WRC-07 Resolutions and other relevant documents Annex 6 Submission guidelines & template for details of submission Annex 7 Evaluation guidelines and criteria and methodology Evaluation criteria and methodology (including test environments) Annex 8 Relevant ITU-R Recommendations, Reports and others Bruce Kraemer (Marvell); Darwin Engwer(Nortel)