Vienna Module Production Modules for TEC Ring 2 R2N R2S 2003 2 2 with Dorazil hybrids, without rigidifiers 2004 5 5 with final hybrids, but with retro-fitted connectors on the Kapton cable Total: 7 7 ==> Yet no modules produced for the final production ..... represented by J. Hrubec Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Ring 2 Normal Ring 2 Stereo Vienna / Inst. für Hochenergiephysik Modules for Ring 2 Ring 2 Normal Ring 2 Stereo Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Preparation of the frame Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Vienna / Inst. für Hochenergiephysik Sensor alignment Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Vienna / Inst. für Hochenergiephysik Alignment precision 2003 Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Vienna / Inst. für Hochenergiephysik Bonding Bonding plate for Ring 2 Normal Ring 2 Stereo with rigidifiers Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Vienna / Inst. für Hochenergiephysik Module test: I-V Module .....26693 Module .....26698 Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Module ......26693 module with all channels working correctly Plots for Deconvolution mode and Inverter ON Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Module ......26698 module with highest number of channels not working Plots for Deconvolution mode and Inverter ON Channels 342 and 683 open on hybrid Handling accident: damaged bonds, scratch on pitch adapter Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Vienna / Inst. für Hochenergiephysik Module status 1 hybrid received with distorted bonds (on 3 APV’s): no problems on the module ==> no repair done A few channels open on some hybrids 1 pinhole ==> channel not bonded between sensor and PA 1 module with a handling accident: damaged bonds replaced, scratch on the pitch adapter, module fulfills still the specifications (7 bad channels) 1 module shows frequent I2C problems All modules shipped to Aachen and Lyon Vienna / Inst. für Hochenergiephysik Tracker-week April 2004
Vienna / Inst. für Hochenergiephysik Inventory Modules for TEC Ring 2 R2N R2S Frames 78 77 Rigidifiers 385 355 Hybrids 0 0 After having moved their hybrid test station, the colleagues in FNAL hope to ship hybrids to Vienna this week. Vienna / Inst. für Hochenergiephysik Tracker-week April 2004