ECE 135 – Group 3 Presentation 1-2 Pat Cleary with Kevin Parker & Bryan Chavez January 27th, 2005
Work Summary Initial GANTT Charting Project Assignments Initial IEEE 802.3z Standard Research Start Research into VCSEL/PDs Introduction to Test Equipment
GANTT Chart
Organizational Management Project Assignment Task Task Leader Primary Support Organizational Management Pat Kevin Optical Link Design Bryan Board Layout Board Construction Testing Report Prep
Research Results: Overview
Research Results: Tx
Research Results: Rx
Start Research into VCSEL/PDs http://www.copax.com.tw/product03_SFP.htm http://www.lasermate.com/VCSELdiode850ga.htm http://www.advancedopticalcomponents.com/product/datacom.php http://www.metrotek.com/hsingaas.html http://www.gpd-ir.com/InGaAs%20high%20speed_spec.htm
Start Research into VCSEL/PDs
Introduction to Test Equipment ?
Introduction to Test Equipment
Introduction to Test Equipment
Future Work Short Term Continue Standard Research Begin Testing Eval Board Long Term Select Design Components Order VCSEL/PD’s
References For the IEEE 802.3 Standard: http://standards.ieee.org/getieee802/download/802.3-2002.pdf Figure 38-1; Table 38-3; Table 38-4