Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

North Texas Municipal Water District Water Treatment Process.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
1 Collection System And Wastewater Treatment Plant Sewer Update
Loudoun Water’s Potomac Water Supply Program RWI/PRWPS- Request for Qualifications Pre-submittal Conference– July 9, 2013.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Phase Difference = Phase Difference = 0.05.
CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Water System Planning Study
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Raw and Finished Water System Improvements April 22, 2014.
NC AWWA-WEA 2015 Annual Conference Monday, November 16, 2015 The Use of Chlorine Dioxide to Reduce TOC at Davidson Water, Inc. Water Treatment Plant.
Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director Public Works Department.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Update on RCR Permitting
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
WATER – WASTEWATER TREATMENT EXPERIENCE
Recycled Water Project Basis of Design Report
Electrical Distribution Design Services
Richland Creek Water Supply Program Briefing
Kings Bluff Raw Water System Parallel Raw Water Main Project
MSD’s Second Annual “Can You Dig It?”
Perris Water Filtration Plant Membrane Upgrade – Phase I
Rate Increases: Reasons Methods.
Recycled Water Project – Sharon Heights GCC
2015 Project Preview NUCA of Colorado
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
What is it all about?.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
HOW THE COOLING SYSTEM OF YOUR CAR WORKS.
Class III Estimate for Regional Consolidation
This is not safety-critical, but it is financial-critical.
Southern Delivery System
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Brackish Water Desalination Project

Southwest Section AWWA 2018 – Baton Rouge, LA
City Council Business Meeting
Richland Creek Water Supply Program Program Update
MANILLA WATER SUPPLY UPGRADE
Presentation transcript:

Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000 Upgrade Existing RWPS: $1,300,000 Construct New RWTM: $5,000,000 Construct New FWTM: $13,300,000 1

Estimated Costs (Includes engineering) Project Element Modifications at existing WTP $450,000 Construct new 6 MGD water treatment plant $39,100,000 Upgrade existing raw water pump station $1,300,000 Construct new raw water main (12,000 lf) $5,000,000 Construct new finished water main (36,000 lf) $13,300,000 Total Estimated Cost $59,150,000 (Includes engineering)

Next Steps Make critical decisions (project timing, growth/demand projections, project phasing) Project schedule if decision made to proceed today

 Questions?