Ford LSPI Prove Out Operational Data Plots

Slides:



Advertisements
Similar presentations
BEST Educational Platform Round Table Belgrade 2011 Mateusz Treder BEST Corporate Relations.
Advertisements

Combined Heat and Power plants – carbon AND cost saving? Daman Ranby – Director Ashley Allsop – Head of Sustainability.
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 methodologies 1.
SUPERPRO-BASED AMMONIA PLANT RETROFIT REACTOR OPTIMIZATION THROUGH ASPEN ASSISTANCE NORTH CAROLINA STATE UNIVERSITY DEPARTMENT OF CHEMICAL ENGINEERING.
The Earth’s Space Environment Session 2 – Progress Report.
Counting Techniques The Fundamental Rule of Counting (the mn Rule); Permutations; and Combinations.
Ford 1. Ford 2 Ford 3 Ford 4 Ford 5 Ford 6 Ford 7.
Statistical Modeling with SAS/STAT Cheng Lei Department of Electrical and Computer Engineering University of Victoria April 9, 2015.
Power Plant Construction and QA/QC Section 1.3– Oil and Natural Gas Engineering Technology Division.
Mack T12 Engine Test Update
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Migrant Student Information Exchange (MSIX) MSIX Lab: Merging and Splitting Student Records 2011 OME Conference November 14-16, 2011 Nashville, Tennessee.
Agenda for PresentationPresenter: Sergey Kostrov Implementation of a Geo-Coding subsystem Requirements, Objectives and Goals: 1.Cost effective because.
With Ms. Harper $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
© The Lubrizol Corporation 2006, all rights reserved Case Study: Sequence IIIG Phos Retention at 20 Hours Presented to ESCIT February 2007 San Antonio,
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI February 21, 2005.
Improving the world through engineeringhttp://nearyou.imeche.orgImproving the world through engineering 1 New Online Quarterly Reporting System Kevin Manning.
Datastream. Scroll to Datastream Scroll to Datastream and press Enter Enter.
S9-1 ADM730, Section 9, September 2005 Copyright  2005 MSC.Software Corporation SECTION 9 MONTE CARLO ANALYSIS, CORRELATION.
Step 1: Find the Cumulative Frequency for each class. < 99.5 <
How to Combine Items of Separate Bibliographic Records Version 16 and up Yoel Kortick.
12 Copyright © 2004, Oracle. All rights reserved. Using ADF Struts Components.
Ford LSPI Prove Out Analysis Kevin O’Malley The Lubrizol Corporation 1.
ESCIT Ballot January 8, Ballot Results Sequence IIIG preferred by a majority of the members –Sequence IIIG-EOT was the preferred duration Secondary.
Database Testing Gourav Mehta (Associate QA Engineer)
Plot Diagram.
Heavy Duty Engine Oil Classification Panel
Estimation Point Estimates Industrial Engineering
Small Engine Tool ID Part 1.
Quality Control Checks on Reservoir Fluid Samples
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
The Pathway Tools FBA Module
Cummins ISM Reference Data Review Merit Addendum for Cummins Surveillance Panel August 26, 2009 Jim Rutherford.
From: Saccadic suppression during voluntary versus reactive saccades
Copyright © 2006 American Medical Association. All rights reserved.
Basic Elements of a Graph
KEMENRISTEK DIKTI Publication by LSP3I SEMOGA BERMANFAAT.
Π: nil d: 0 π: nil d: ∞ 2 A B -1 π: nil d: ∞ C D E 4 π: nil d: ∞ π: nil d: ∞
VIE Precision Matrix Analysis
Tips Need to Consider When Organizing a College Event
Valid Points Need to Know about the Companies Act 2013
Data Analysis Empirical Distributions Industrial Engineering
Estimation Point Estimates Industrial Engineering
דיני חברות ד"ר ויקטור ח. בוגנים
2014 IARE Benchmarking Survey Summary
05 | More on Parameters Jeffrey Snover | Distinguished Engineer & Lead Architect Jason Helmick | Senior Technologist, Concentrated Technology.
ماجستير إدارة المعارض من بريطانيا
Business types Landscaping Company.
FORS Workshop Going for Bronze Overview.
PPT Design on 3D models Landysh Minligalieva Reservoir Engineer
ClueGene: An Online Search Engine for Querying Gene Regulation
VH Prove out tests with data available
Copyright © 2012, Elsevier Inc. All rights Reserved.
Knowledge Engineering
Supplemental Digital Content 2 – Figure 1
Forest plots for all drugs (OS and PFS HRs combined): excellent versus reduced PS comparison and ECOG PS levels comparison (see online supplementary 1). ECOG.
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Chapter (3) - Procedures
No correlation between the distance of the duplicated alleles and the transcription levels on each of the alleles. No correlation between the distance.
No correlation between the position of the gene in the nuclear volume and the transcription levels on each of the alleles. No correlation between the position.
Cumulative incidence of cardiovascular events according to medication group in participants of the 4D study with an LDL-C in its fourth quartile at baseline.
Overview of HEC Data Storage System (HEC DSS)
Simplifying Expressions
Quality Control Checks on Reservoir Fluid Samples
7. Ford-Fulkerson Demo 02/25/19 Copyright 2000, Kevin Wayne.
Frequency Plot Summary Process Steps
treasury overview ford motor company
Presentation transcript:

Ford LSPI Prove Out Operational Data Plots 11-17-15 Kevin O’Malley The Lubrizol Corporation

Overview 36 tests included 16 IAR (2 stands; 8 tests per stand; 2 engine builds per stand) 16 SwRI (2 stands; 8 tests per stand; 2 engine builds per stand) 4 LZ (1 stand; 1 engine build) 2 oils tested (low event oil and high event oil) Each oil tested in duplicate within each stand-engine build combination Operational parameters are plotted versus cumulative time Cumulative time is a combination of time from valid iterations A, B, C, and D; time at start of iteration A = 0hrs Each RunID/Test # is plotted in a separate pane

ZOOMED IN