Cost estimation and behaviour

Slides:



Advertisements
Similar presentations
Determining How Costs Behave
Advertisements

Determining How Costs Behave. Introduction n How do managers know what price to charge, whether to make or buy, or other questions related to costs. n.
Copyright © 2006 The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 ~ Curve Fitting ~ Least Squares Regression Chapter.
Cost Behavior: Analysis and Use
© 2008 McGraw-Hill Ryerson Limited. Cost Behaviour Merchandisers Cost of Goods Sold Manufacturers Direct Material, Direct Labour, and Variable Manufacturing.
Prepared by Diane Tanner University of North Florida Chapter 10 1 Cost Estimation.
Cost Accounting Dr. Baldwin University of Arkansas – Fort Smith Fall 2010.
Chapter 4 Cost-Volume-Profit Analysis Revenues Costs.
CHAPTER 3 MEASUREMENT OF COST BEHAVIOUR.
Determining How Costs Behave
Correlation and Regression Analysis
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Determining How Costs Behave Chapter 10 2/07/05.
Measurement of Cost Behaviour
Chapter 3 Cost behaviour, cost drivers and cost estimation
1 Cornerstones of Managerial Accounting, 2e Copyright © 2008 Thomson South-Western, a part of the Thomson Corporation. Thomson, the Star logo, and South-Western.
Cost Behavior Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
Relationships Among Variables
Chapter 3 Cost Behaviour
1 CHAPTER M4 Cost Behavior © 2007 Pearson Custom Publishing.
Determining How Costs Behave
Cost concepts, Cost Classification and Estimation
Cost Analysis and Classification Systems
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 11 Regression.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 12-1 Chapter 12 Simple Linear Regression Statistics for Managers Using.
3 CHAPTER Cost Behavior 3-1.
Chapter 5 Cost Behavior: Analysis and Use. © The McGraw-Hill Companies, Inc., 2005 McGraw-Hill /Irwin Types of Cost Behavior Patterns Recall the summary.
© 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 12 Describing Data.
Statistics for Business and Economics 8 th Edition Chapter 11 Simple Regression Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Ch.
Linear Trend Lines Y t = b 0 + b 1 X t Where Y t is the dependent variable being forecasted X t is the independent variable being used to explain Y. In.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Accounting 3020 Chapter 5 – Cost Behavior: Analysis and Use.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Learning Objective 1 Explain the two assumptions frequently used in cost-behavior estimation. Determining How Costs Behave – Chapter10.
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 10 Determining How Costs Behave.
Cost drivers, cost behaviour and cost estimation
Basic Concepts of Correlation. Definition A correlation exists between two variables when the values of one are somehow associated with the values of.
Basic Concepts of Economics Use basic economic concepts to explain changes in natural resource base and environmental quality Prepared by Husam Al-Najar.
STATISTICS 12.0 Correlation and Linear Regression “Correlation and Linear Regression -”Causal Forecasting Method.
3-1 Cost Analysis Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 3.
© 2007 Pearson Education Canada Slide 3-1 Measurement of Cost Behaviour 3.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 10: Determining How Costs Behave 1 Horngren 13e.
Copyright © 2013 Nelson Education Ltd.
STATISTICS 12.0 Correlation and Linear Regression “Correlation and Linear Regression -”Causal Forecasting Method.
Section 1.6 Fitting Linear Functions to Data. Consider the set of points {(3,1), (4,3), (6,6), (8,12)} Plot these points on a graph –This is called a.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Cost Behaviors Management Accounting. Cost Classifications Association with cost object Cost object is anything for which management wants to collect.
Chapter 14 Introduction to Regression Analysis. Objectives Regression Analysis Uses of Regression Analysis Method of Least Squares Difference between.
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Six: The application of quantitative methods to management.
Prepared by Diane Tanner University of North Florida ACG Cost Estimation 4-1.
1 Determining How Costs Behave. 2 Knowing how costs vary by identifying the drivers of costs and by distinguishing fixed from variable costs are frequently.
Prepared by Debby Bloom-Hill CMA, CFM
Determining How Costs Behave
The simple linear regression model and parameter estimation
Cost Estimation & Cost Behaviour
10.2 Regression If the value of the correlation coefficient is significant, the next step is to determine the equation of the regression line which is.
Mixed Costs Chapter 2: Managerial Accounting and Cost Concepts. In this chapter we explain how managers need to rely on different cost classifications.
Determining How Costs Behave
Cost-Volume-Profit Relationships
Determining How Costs Behave
MBF1413 | Quantitative Methods Prepared by Dr Khairul Anuar
CHAPTER 3 Describing Relationships
Correlation and Regression
© 2017 by McGraw-Hill Education
Regression All about going back (regressing) from the points to the function from which they came. We are looking at linear regression.
Cornerstones of Managerial Accounting, 5e
DSS-ESTIMATING COSTS Cost estimation is the process of estimating the relationship between costs and cost driver activities. We estimate costs for three.
Cost behaviour, cost drivers and cost estimation
Regression and Correlation of Data
Presentation transcript:

Cost estimation and behaviour CHAPTER 10 Cost estimation and behaviour

10.1a General principles • A regression equation (or cost function) measures past relationships between a dependent variable (total cost)and potential independent variables (i.e. cost drivers/activity measures). • Simple regression y = a + bx Where y = Total cost a = Total fixed cost for the period b = Average unit variable cost x = Volume of activity or cost driver for the period • Multiple regression y = a + b1 x1 + b2 x2 • Resulting cost functions must make sense and be economically plausible.

Cost estimation methods 10.1b Cost estimation methods Engineering methods Inspection of accounts method Graphical or scattergraph method High-low method Least squares method.

Inspection of accounts 10.2 Engineering methods • Analysis based on direct observations of physical quantities required for an activity and then converted into cost estimates. • Useful for estimating the costs of repetitive processes where input-output relationships are clearly defined. • Appropriate for estimating the costs associated with direct labour, materials and machine time. Inspection of accounts • Departmental manager and accountant inspect each item of expenditure within the accounts for a particular period and classify each item as fixed, variable or semi-variable.

10.3 Graphical or scattergraph method Y = £240 + £2x • Past observations are plotted on a graph and a line of best fit is drawn. • Unit VC = Difference in cost = £720 – £560 = £2 per hour Difference in activity 240 hours – 160 hours Figure 1 Graph of maintenance costs at different activity levels Y = £240 + £2x

10.4a High–low method • Involves selecting the periods of highest and lowest activity levels and comparing changes in costs that result from the two levels. Example Lowest activity 5 000 units £22 000 Highest activity 10 000 units £32 000 Cost per unit = £10 000/5 000 units = £2 per unit Fixed costs = £22 000 – (5 000 × £2) = £12,000 • Major limitation = Reliance on two extreme observations

10.4b Figure 2 High–low method

The least squares regression formula Exhibit 1 Past observations of maintenance costs

10.5b The simple regression equation y = a + bx can be found from the following two equations and solving for a and b: The above equation can be used to predict costs at different output levels.

10.6a Multiple regression analysis

10.6b Multiple regression analysis (cont.)

Factors to be considered when using 10.7 Factors to be considered when using past data to estimate cost functions Identify the potential activity bases (i.e. cost drivers) The objective is to find the cost driver that has the greatest effect on cost. • Ensure that the cost data and activity measures relate to the same period. Some costs lag behind the associated activity measures (e.g. wages paid for the output of a previous period). • Ensure that a sufficient number of observations are obtained. • Ensure that accounting policies do not lead to distorted cost functions. • Adjust for past changes so that all data relates to the circumstances of the planning horizon. Adjust for inflation, technological changes and observations based on abnormal situations.

10.8 Summary 1. Select the dependent variable (y) to be predicted. 2. Select the potential cost drivers. 3. Plot the observations on a graph.* 4. Estimate the cost function. 5.Test the reliability of the cost function. Figure 3 Effect of extrapolation costs *Be aware of the dangers of predicting costs outside the relevant range.

10.9a Tests of reliability Tests of reliability indicate how reliable potential cost drivers are in predicting the dependent variable. The most simplistic approach is to plot the data for each potential cost driver and examine the distances from the straight line derived from the visual fit. A more simplistic approach is to compute the coefficient of variation (known as r2). See slide 9b for the calculation of r2 from the data shown on sheet 5a.

10.9b r so that r2 = (0.941)2 = 0.8861 r2 indicates that 88.61% of the variation in total cost is explained by the variation in the activity base and the remaining 11.39% by other factors. Therefore the higher the coefficient of variation the stronger the relationship between the dependent and independent variable.