SEISMIC RISK MANAGEMENT MECEDONIAN EXPERIENCE

Slides:



Advertisements
Similar presentations
Strengthening capacities at local level to build a culture of safety and resilience at all levels ILO International Training Centre At the UN/ISDR Global.
Advertisements

Museum Presentation Intermuseum Conservation Association.
DROUGHT MONITORING CENTRE - NAIROBI WHAT COULD BE DONE ON DROUGHT WITHIN ISDR PLATFORM?
Towards a Culture of Disaster Prevention and Risk Management Andean Programme for the Prevention and Mitigation of Disasters.
Hazard and Risk Analysis What are the socio-economic and political trends? Consider recent assessment / reviews / baseline studies / analytical exercises.
A Joint Code of Practice Objectives and Summary Presentation
Water Integrity Capacity Building Programme: Outcomes and lessons learned from SADC regions SIWI WGF & CapNet UNDP 29 May A3.
DISASTERS, RISK and SUSTAINABILITY Omar D. Cardona.
A hazard in itself is not a disaster.. It has the potential to become one when it happens to populations who have certain vulnerabilities and insufficient.
Background to the WCDRR
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
Implications for Caribbean Capital Markets 25 May, 2011 Marlene Murray CFA Society of Trinidad and Tobago.
1 A new training course for Engineers in Lyon : « Prevention and management of risk in the territory » A way forward ‘’excellence’’ ?
Vulnerability Assessments and Adaptation to Climate Change Consultations on the Relationship between Climate and human rightsGeneva 22 October 2008 Festus.
Outline: Lecture 4 Risk Assessment I.The concepts of risk and hazard II.Shaking hazard of Afghanistan III.Seismic zone maps IV.Construction practice What.
Disaster Reduction & Climate Change Adaptation by Fengmin Kan, UN-ISDR Africa Nairobiwww.unisdr.org.
Quantifying Disaster Risk and optimizing investment Sujit Mohanty UNISDR – Asia Pacific Protecting development gains: A path towards resilience.
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
Economics of Extreme Climatic Events By Adil Rasheed (EPFL-ENAC-ICARE-LESO-PB)
GRIP - Global Risk Identification Programme, UNDP Bureau for Crisis Prevention and Recovery, , Local Risk.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior U.S. Geological Survey Natural Hazards Science – Reducing the World’s.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Workshop on RISKS AND IMPACTS ON FLOOD FROM EXTREME EVENTS IN ASEAN COUNTRIES Bali, August 5 th 2015.
Liability Issues for TRIO Programs Managing Your Project’s Risk.
OPENQUAKE Mission and Vision It is GEM’s mission to engage a global community in the design, development and deployment of state-of-the-art models and.
Shelley Jules-Plag & Hans - Peter Plag ARE BUILDING CODES CONSISTENT WITH OUR KNOWLEDGE OF GEOHAZARDS?
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
HFA Progress and Updates Consultative Meeting of National Disaster Platform on Feb 17, 2013 Jishnu Subedi Institute of Engineering Tribhuvan University.
The World Bank’s Role in Disaster Mitigation Financing the Risks of Natural Disasters June 3, 2003 Alcira Kreimer Manager, Disaster Management Facility.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in Antigua and Barbuda Funded by a special appropriation by the U.S. Congress to countries.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in St. Kitts and Nevis Funded by a special appropriation by the U.S. Congress to countries.
What APEC Task Force for Emergency Preparedness (TFEP) has progressed in the implementation of HFA Presented by Vincent Liu Program Director APEC Secretariat.
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
Japan International Cooperation Agency Role of stakeholders Priorities for Action Summary of the SFDRR Priority 1: Understanding disaster risk.
International Accounting Standards An older set of standards stating how particular types of transactions and other events should be reflected in financial.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
European Forum for Disaster Risk Reduction: contributions to Climate Change Policy agenda Dr. Pande Lazarevski Co-chair of the European Forum for DRR Brussels,
Business Continuity Planning 101
How to improve interagency coordination and cooperation in developing integrated policies and procedures that mitigate risk and minimize impact?
Responsibilities of researchers Asking ourselves what responsibilities do we have towards the scientific community and society? Research is regulated by.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Identifying capability assessment challenges and opportunities in.
MIT University Skopje Ass. Prof. Oliver Andonov, PhD
Framework Programme : 7th Research Framework Programme : Some aspects.
Albania Disaster Risk Mitigation and Adaptation Project
International assistance
Disaster and Emergency Planning
Crisis management related research at
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Introduction to Business (MRK 151)
Sendai Framework for Disaster Risk Reduction
Eduardo Ismael Hernández UPAEP University, MEXICO
Strategic Planning for Learning Organizations
DISASTER MANAGEMENT – WITH SPECIAL EMPHASIS ON EARTHQUAKE
ENVIRONMENTAL ASSESSMENT TOOLS
14th MEETING OF WORKING GROUP F ON FLOODS Thursday 17 October 2013
Hazards Planning and Risk Management Risk Analysis and Assessment
Vulnerability Assessments and Adaptation to Climate Change
14th MEETING OF WORKING GROUP F ON FLOODS Thursday 17 October 2013
Communication and Consultation with Interested Parties by the RB
SPA Analysis and Synthesis of Loss Estimation & Risk Assessment (LERA) Methodologies for Prediction and Prevention of Catastrophes Project reference.
Information Security Risk Management
REPUBLIC COUNCIL ON ROAD TRAFFIC SAFETY OF THE REPUBLIC OF MACEDONIA
A2 Unit 5 – Hazards Option.
A2 Unit 5 – Hazards Option.
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
UNDMTP Presentation, Session V: Early Warning Symposium 24 May 2006
Disaster Preparedness and Resilience
The Technology Mechanism of the UNFCCC
Presentation transcript:

SEISMIC RISK MANAGEMENT MECEDONIAN EXPERIENCE prof. Elena Dumova-Jovanoska “Ss.Cyril and Methodius” University, Skopje prof. Elena Dumova-Jovanoska

INTRODUCTION Natural disaster mitigation efforts are increasingly evaluated in the context of integrated risk management. It is often useful to approach seismic engineering issues from a risk management standpoint. Many strategies are possible, Decision makers must consider different, and often conflicting, interests in choosing a strategy. How should a strategy be selected? 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 2

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 3 prof. Elena Dumova-Jovanoska 3

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 4 prof. Elena Dumova-Jovanoska 4

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 5 prof. Elena Dumova-Jovanoska 5

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 6 prof. Elena Dumova-Jovanoska 6

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 7 prof. Elena Dumova-Jovanoska 7

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 8 prof. Elena Dumova-Jovanoska 8

EARTHQUAKE & DAMAGE 17th INTERNATIONAL SYMPOSIUM OF MASE 9 prof. Elena Dumova-Jovanoska 9

EARTHQUAKE & DAMAGE Skopje, 1963 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 10

EARTHQUAKE & DAMAGE Skopje, 1963 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 11

SEISMIC RISK MANAGEMENT Seismic risk management is the development of policies, procedures, and strategies to limit the extent of disaster caused by earthquakes. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 12

SEISMIC RISK MANAGEMENT The risk management is a process of weighting alternatives (options) and selecting the most appropriate action to reach an acceptable decision. Generally, risk assessment/analysis process involves objectivity, whereas risk management involves preferences and attitudes which have both objective and subjective elements. Two options that can be combined in an overall risk management strategy are: reducing expected loss by implementing preventive or mitigation measures; and insurance and loss sharing in case of an accident (or a damaging earthquake). 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 13

SEISMIC RISK MANAGEMENT Reducing expected loss by implementing preventive or mitigation measures includes: enhancing seismic provisions for new construction and retrofitting existing structures and infrastructure (hard measures for seismic risk mitigation) Alternative retrofit strategies for seismic upgrading. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 14

SEISMIC RISK MANAGEMENT Insurance serves as a valuable vehicle to mitigate financial risk (soft measure for seismic risk mitigation). This is particularly important for facilitating post-disaster recovery, because a negative impact is often too grave and drastic; it would take a long time to return to the original state of wealth/asset. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 15

SEISMIC RISK MANAGEMENT Earthquakes in the United States and Japan have caused considerable monetary loss, but the reported fatalities are minimal. This corroborates the life safety performance limit of the current seismic design code, and the motivation for performance-based earthquake engineering that accounts for other losses. The loss of lives from the South American and Asian earthquake is considerably high. Monetary loss and fatalities associated with earthquakes from 1980 to 2011, [5]. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 16

SEISMIC RISK MANAGEMENT In order to prepare a comparison of strategies, the impact of each strategy on the risk profile of the system must be evaluated. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 17

SEISMIC RISK ASSESMENT In seismic-prone regions, a full seismic risk analysis is generally represented as the economic and social losses of a potential seismic event. Its estimation requires contributions from several scientific disciplines: for assessing seismic hazard (including probabilistic assessment and site effects), the building response and its vulnerability in order to predict the ultimate damage and fatalities, and the economic and social consequences in the area in question. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 18

SEISMIC HAZARD & SEISMIC RISK SEISMIC HAZARD – Gives the probability that a certain parameter of ground motion (MMI, PGA, Spectra) or, in a more general case, of the seismic process, will be surpassed within a lifetime period. SEISMIC RISK – The convolution of hazard with vulnerability for a group of structures, a region, etc. This means the product of probability of occurrence of a certain level of ground motion by the vulnerability of a group of structures, multiplied by their number, and extended to all possible levels of ground motion. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 19

SEISMIC HAZARD European-Mediterranean Seismic Hazard Map 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska

VULNERABILITY & FRAGILITY Building response: VULNERABILITY – Degree (level) of performance of a system (engineering structure, network, social group, etc.) under a certain level of seismic action. A more vulnerable system is the one that, for a given action, cannot perform so well as another one. FRAGILITY of a structure can be defined as its damageability while the structure’s vulnerability is a consequence of this damageability. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 21

VULNERABILITY & FRAGILITY CURVES VULNERABILITY FUNCTIONS relate the probability of losses as a result of damage to a ground motion measure. Some types of losses that can be used in developing seismic vulnerability functions for structures include repair cost, repair time, casualties, environmental impacts. FRAGILITY CURVES describe the probability of reaching or exceeding specific damage levels as a function of seismic intensity measure, 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 22

VULNERABILITY & FRAGILITY CURVES Vulnerability and fragility curves, that take on the form of analytical functions, are commonly used in seismic risk assessment and loss estimation applications. Vulnerability Curve Fragility Curves 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 23

MACEDONIAN EXPERIENCE Risk Management Low on national level is adopted in 2005. It defines several kind of risks: Government Assessment group Headquarter Crisis Management Center CUK Institutions Management committee security, natural, technical/technological health. Crisis Management System in Macedonia 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 24

MACEDONIAN EXPERIENCE Stip Bitola Ohrid Skopje Tetovo Kumanovo Strumica Veles Territorial distribution of CUK regional centers 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 25

MACEDONIAN EXPERIENCE Since key step in the process of Crises Management is risks assessment, in 2011 the Government has adopted “Decree for assessment of threat to the security of the Republic of Macedonia from all risks and dangers, its content and structure, the manner of keeping and updating, as well as the determination of the entities in the crisis management system to which a complete or statement of assessment is provided”. Document in a very general and concise form defines the steps of hazard and risk assessment independently of the type of the hazard. Some key terms in crisis management; hazard, risk, vulnerability, risk assessment etc. are introduced. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 26

MACEDONIAN EXPERIENCE Another document that completes the review of the situation in the area of crisis management in Republic of Macedonia are the "Standard Operating Procedures for Communication Coordination and Cooperation among the Crisis Management System entities in the declared crisis", which the Government adopted in 2012 . In this document, among other types of hazards and risks, the procedures and responsibilities of certain institutions in case of an earthquake, are defined. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 27

CONCLUDING REMARKS Our scientific and technical knowledge has improved considerably in the last decades. This is clearly shown by many technological achievements, by the number of scientists devoted to these subjects with an excellent research production provided through a large and diverse number of research programs and national and international initiatives, and by a huge amount of publications (books, specialized journals, frequent international conferences, meetings, workshops, etc.). 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 28

CONCLUDING REMARKS The scientific achievements have led to an increase in efforts towards the assessment of hazard and vulnerability but, only very recently, has political awareness gained some visibility, in particular in the wealthier earthquake prone countries. It is clear that much is still needed to understand seismic phenomena and the technical needs of varied types of constructions and facilities. On the other hand, a great effort has to be made to provide public information which will contribute to an increase in decision-makers’ awareness, so that they can support public and private actions leading to the mitigation of risk. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 29

CONCLUDING REMARKS Where is Macedonia? It seems that the global framework of the risk management system is settled according contemporary achievements in these young field, but…. transparency of the activities and public presentation of gained results is definitely a week point, use of these results in creating of public opinion towards definition of policy for seismic risk mitigation is even less visible, participation of insurance is insignificant and promotion of support for individual owners for retrofit measures of their buildings do not exists at all. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 30

CONCLUDING REMARKS Where is Macedonia? It seems that the global framework of the risk management system is settled according contemporary achievements in these young field, but…. transparency of the activities and public presentation of gained results is definitely a week point, use of these results in creating of public opinion towards definition of policy for seismic risk mitigation is even less visible, participation of insurance is insignificant and promotion of support for individual owners for retrofit measures of their buildings do not exists at all. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 31

CONCLUDING REMARKS It is clear that much is still needed to understand seismic phenomena and the technical needs of varied types of constructions and facilities. But, on the other hand, a great effort has to be made to provide public information which will contribute to an increase in decision-makers’ awareness, so that they can support public and private actions leading to the mitigation of risk. We should ask ourselves if engineering community is doing the right things, and what policies it is pursuing to achieve a substantial reduction of seismic risk. 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 32

CONCLUDING REMARKS Italy 17th INTERNATIONAL SYMPOSIUM OF MASE 33 prof. Elena Dumova-Jovanoska 33

? CONCLUDING REMARKS Macedonia 17th INTERNATIONAL SYMPOSIUM OF MASE 34 prof. Elena Dumova-Jovanoska 34

Thank you! dumova@gf.ukim.edu.mk 17th INTERNATIONAL SYMPOSIUM OF MASE prof. Elena Dumova-Jovanoska 35