Site #1 Advantages Disadvantages

Slides:



Advertisements
Similar presentations
Evaluating Standards for Site Certification Presented to: American Public Power Association Presented by: Robert M. Ady, President Ady International Company.
Advertisements

By Alfredo Cabrera Nathan Mustafa Sterling Mosley.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Office of Risk Management Driving in Inclement Weather.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
HOW CAN YOU COMMUNICATE YOUR VISIBILITY TO OTHER DRIVERS?
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Winter Operations GPS Truck Tracking and Material Usage Tom Clay Washington State Department of Transportation Western States Equipment Conference
Winter Storm Response Presentation & Discussion. Winter Storm Response2 Storm Response – PW Mission “We strive for the safest roadways at a reasonable.
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
What does PWD do for our City?. Administrative Services Engineering Operations.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Snow Removal Information Robert “Brutus” Cantoreggi, Director Carlos Rebelo, Highway and Ground Superintendent.
Routing and Mapping EMT070 Cars and Radios. Types Reckoning (Dead?) Box maps Thomas Brothers City maps State maps GPS.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Urbanization of Rural Areas Urbanization of rural areas occurs as the result of: –Cheaper property for development –Larger new neighborhoods accommodate.
South Meadows Open space # 16 Upgrades Open space # 16 Upgrades.
Olathe’s Snow Removal Program. Overview Snow Removal Policy Types of Routes Snow Route Information Site AVL units Complaint database.
Places and Spaces A515 – Five Ways to Foxlow Farm. Building site Foxlow Farm Cottage hospital Staden Lane 5 Ways junction Haddon Hall.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
Marlboro Farms/Archer Farms PD ZOM Overview Marlboro Farms PD approved in 1976 as a 138ac mixed-use development with commercial, 27 single-family.
City of Joliet Anti – Icing/De-Icing Program MIKE EULITZ – ROADWAYS ENGINEER.
SOAR WINTER PREPARATION Some safety and operative instructions reviews show the following task for SOAR to be addressed -Dome outer ladder: Current structure.
Idaho Transportation Department Winter Maintenance Best Practices
MD 30 (Hanover Pike) at Mt. Gilead Road
Pioneer Road Relocation and Reconstruction Project
Secor Road Reconstruction Project Public Meeting #2
Impact of the Change Proposed:
VEHICLE MOVEMENT CHAPTER 12.
Water and Honey Buckets in Rural Alaska
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Interstate 15 North Phase 4 8/19/2015 Update
Highway 14 – Owatonna to Dodge Center District 6 Update
Potholes Supplemental Feed Route Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meter Set Protection American Gas Association
Looking for best Landscape Design London Ontario service -
SAVING OUR NEIGHBORHOOD
Directions to Butler Stadium: FROM THE NORTH: Take I-95 south toward Richmond Va. Take exit 150A toward Triangle/Quantico. Cross Jefferson Davis Highway.
47b. Fatal injuries at road construction sites, by major industry, total (All employment)
Chapter 15: Driving in Rural Areas
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Transportation Engineering Basic safety methods April 8, 2011
Lyle Parkway to SR 540 (Winter Lake Road)
NAVIGATING THE WINTER WITH THE ILLINOIS TOLLWAY
Passing other Vehicles
M-1.
Geometric Design: General Concept CE331 Transportation Engineering.
Snow and Ice Removal Route Optimization
MESA COUNTY SNOW PLOW PROGRAM.
Crag Race Route.
Transportation Workshop
Stockton City Council December 6, 2007 Land Use Diagram Changes
Shelter and settlement options
IS-700.A: National Incident Management System, An Introduction
Ending Homelessness - Overcoming the Barriers
Example of cones and signs as traffic control at a roadway incident.
Chapter 8: Site Selection
Great Homesite on 4+/- Acres Madison County, MS
Presentation transcript:

Site #1 Advantages Disadvantages Livermore Maintenance Site Alternatives Site #1 Advantages Site is six miles closer to Hwy 287 for material deliveries, employees, and access during inclement weather. County purchased the 35 acre property in 1987 for future replacement of Livermore maintenance facility. Site infrastructure is partially screened from CR 74E by terrain. Good sun exposure during winter months. Works better for snow removal. Less Overlap with plow routes. Disadvantages Two residential homes have direct sight lines of the site. Overhead power lines extend through the site, a section of the distribution line may need to be relocated during construction. Site is located on a minor curve of CR 74E. County would construct turn lanes and acceleration/deceleration lanes.

Site #2 Advantages Disadvantages Livermore Maintenance Site Alternatives Site #2 Advantages No residential homes adjacent to the site. When snow events occur at higher elevations only, site is located closer to roads needing snow and ice control services. Site access is located along relatively straight section of CR 74E. Disadvantages Site topography does not accommodate screening from CR 74E. Site is six miles farther from Hwy 287 for material deliveries, employees, and access during inclement weather. State Wildlife Area across the road. Most service vehicles exiting site must immediately climb McNey Hill. Slow and hard on trucks, and requires longer acceleration/deceleration lanes. Site design and construction more costly than Site #1.