ALL4NEPAL – Update No4.

Slides:



Advertisements
Similar presentations
Security and Empowerment for Women and their Families: Ensuring a Gender- Responsive Humanitarian and Early Recovery Response in Haiti.
Advertisements

Where is Japan? Japan is lies to the East of China and Korea in the Pacific Ocean. Japan lies on the so called “Pacific Ring of Fire”, an active area.
Church Renovation/ Expansion Proposals Willowdale.
Part I January 26, Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994.
About Us Our vision is to eradicate poverty housing worldwide We work by empowering local communities to solve their own housing problems We have enabled.
A devastating 7.8 magnitude earthquake struck Nepal on Saturday 25 th April causing widespread damage.
Nepal Earthquake Response. A catastrophic earthquake shook Nepal on April 25, 2015 and caused tremors as far away as China and Pakistan.
Nepal Earthquake Occurred just before midday on 25 April Magnitude at a depth of around 15 kilometres The epicentre was the village of Barpak.
NOT FOR PUBLIC DISTRIBUTION HABITAT FOR HUMANITY’S Santo Development – Léogâne, Haiti.
Nepal Nepal Earthquakes The first earthquake occurred just before midday on 25 April 2015 at a 7.8 Magnitude. The epicentre was in the Gorkha district.
Mujibar’s House: A Case Study Presented to the DER Shelter Coordination Group Cyclone Sidr, Bangladesh 28 November 2007 FH Bangladesh.
The ‘ONE’ Trust. The‘ONE’ Trust : Mission To work as ONE united Sri Lanka to make a significant contribution to the Nation Re-building effort through.
Prediction and prevention of the effects of volcanic eruptions and earthquakes By forecasting, the design of buildings and defences, planning and.
What are we going to discover and learn today?
ALL4NEPAL – Update No4. So what can we do Global Partnership Making a Difference RT NEPAL.
Inter-Ministerial and Inter-Agency Coordination in Post-Earthquake Reconstruction Cooperation Among Government Departments and Line Agencies N. Vinod Chandra.
Lali Guras is Red Rhododendron, the national flower of Nepal
1. Trip overview Field locations Agencies consulted 2. Executive summary Current responses Remaining shelter needs 3. Technical notes Vernacular construction.
Asha for Education November 2005 Akkarapettai School Construction Project Proposal Asha AZ Project Champion – Mukund Asha Chennai Contacts – Lakshmi and.
About Us Our vision is to eradicate poverty housing worldwide We are motivated by our Christian faith We work by empowering local communities to solve.
Snapshot on Sichuan Earthquake May 2008 – April 2009.
Shelter and Non Food Relief Present Scenario: Damage: Totally - 859,486 (GOB statistics as of 1 August) Partially - 3,115,646 ( “ ) Human cost: 19,875,660.
Haiti Haiti is a small island country located in the Caribbean. It is one of the poorest countries in the world.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
L'Aquila, Italy: Earthquake Damage & Aid By: Alyssa Hach.
Nepal Earthquake Relief, Update भुकम्प राहत कार्यकम जानकारी Mr Nishan Rijal V. Chair, NSA 21 Oct 2015.
Update from Department for International Development (DFID) Economic Development Team Lead Gareth Weir
Creating Room to Read – John Wood Social Entrepreneurship, Book Assignment Fluff Clough.
St. Paul’s CSI Church Mulakkulam Village, Kerala, India St. Paul’s CSI Church Mulakkulam Village, Kerala, India Presentation to the Cathedral of St. Paul.
Nepal earthquake. What happened? The 2015 Nepal earthquake occurred on 25 April with a magnitude of 7.8 It is the most powerful disaster to strike Nepal.
Earthquakes in Rich Countries
Key idea: the effects of and responses to tectonic hazards vary between areas of contrasting levels of wealth.
All4Nepal Round Table Nepal. Nepal Quake 2015 A massive earthquake of magnitude 7.9 on the Richter scale struck Nepal on 25th April 2015 at 11:56 a.m.
November 7th 2009, the combined effect of Hurricane IDA and low-pressure system off the Pacific Coast led to heavy rainfall (355mm in few hours) Severe.
WELCOME TO ARDEN PRIMARY SCHOOL
The CHS: is these appropriate for Both international and national actors? Why and Why Not Rezaul Karim Chowdhury
Recruitment, Retention & Prohibited Activities
every one deserves a decent place to live.
Career and Technical Education Center at Heintz CTECH
Volunteer Orientation
Kwami Adzitso, Anju Bohora Carolina Merniez , Darlene Neth
Comparing and contrasting earthquakes
Pakistan earthquake 2005.
ANNUAL UPDATE FOR <YEAR> <NAME> <DATE>
BAD VIBRATIONS.
WELCOME TO ARDEN PRIMARY SCHOOL
Flood No.5 in Nghe An Qui Chau and Que Phong districts
Haiti Earthquake January 2010 Haiti Earthquake assembly
US military food drop after Haiti earthquake in 2010.
PROJECT IN THE PROVINCES OF DONG THAP AND AN GIANG Funded by ECHO
More lectures at Disasters Supercourse -
Kari, Debbie, Emma, Bryony, Abigail, Sarah
ORIENTATION.
POLIOPLUS FACT SHEET Feb 2018
Helping Haiti Rebuild U.S. Government post-earthquake strategy
Returning-Rebuilding-Preparing-Creating
Nepal’s Initiative on Climate Resilient WASH Programming
1989 Loma Prieta Earthquake Mitigation and Reconstruction
Part 3: The nature and main impacts of Bam earthquake
SCG Barisal Field trip report
Risk Management Practice (Case study: Sydney Opera House)
Let’s get water to where it’s needed!
Crisis Planning & Strategy: Using Earthquakes as a Case Study
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Earthquakes 2000 to 2005 From Indonesia to Pakistan
Greensboro Housing Hub
Japan earthquake and tsunami 2011
EVENT: An all-inclusive term for any of the following:
Water Scarcity Impacts 40% of Global Population
Presentation transcript:

ALL4NEPAL – Update No4

So what can we do...... Global Partnership Making a Difference RT NEPAL So what can we do...... Global Partnership Making a Difference

Nepal Quake 2015 A massive earthquake of magnitude 7.9 on the Richter scale struck Nepal on 25th April 2015 at 11:56 a.m. The intensity of the quake spread to several countries surrounding Nepal like Bangladesh, Bhutan, China and India More than 7000 deaths (Figures estimated to cross 12000 deaths) More than 14000 injured 8 million people affected in Nepal alone 2.8 million children in need of humanitarian assistance More than 80% buildings damaged in villages of Nuwakot & Sindhupalchowk districts alone Districts affected : 36 Schools completely damaged : 575 Schools partly damaged : 969 Students Affected :1.5 Million

Why Round Table’s focus is on Schools? Over 30.000 Class rooms have been destroyed by this Earth Quake in Nepal. About 1 million students don’t have place to study. If Children do not get back to school and in education again, they may get engaged in labour jobs and never return to school and will have a potential devastating effect on there lives and that of Nepal in the future. When schools have been made, it can be used as shelter for community at night and in day time children can get education.

Our Long Term strategy: Rehabilitation Objective Our aim is to build 100 classrooms and 50 TLC's (temporary learning centers). We have chosen Nuwakot which is about 2 hours from Kathmandu, as its one of the most affected area. We will have two kinds of reconstruction – Retrofitting the damaged structures Building completely new room Our classrooms will be as per the approved design of the Government and we will take permission from the District Education Officer. Rationale Non Clearing of debris may prevent the students from going to school due to fear of the existing damaged school building. Stopping to go to school now might end up in the children starting to do odd jobs. They may never return back to school. This leads to the high risk of children being engaged in child labor Budget As all the engineers are busy, we have not got all the cost for retrofitting and repair. The costing have started coming in and we are on the process of scrutinizing.

TLC and Classrooms The Goverment is working cost effective design for regular classroom, since it does not have budget its not priority at the moment. Goverment is working on starting all the schools asap with temporary learning centers (TLC) there are 2 types of TLC’s temporary made of bamboo and tarpaulin and second is semi permanent with steel structure and corrugated sheets. Goverment wants schools to get into operational asap using TLC and slowly build permanent classrooms when they get budget for the same. We are in the process of making Steel TLC which can later be converted to permanent classroom by adding flooring, walls, doors and windows. The ones that we have completed have the floor and half wall included from the start.

Project Activities Building of new Classrooms Retrofitting / Repair Existing Ones Phase 1 Supplying necessary construction Materials Erection of the frame Foundation, floor and half wall Corrugated sheets for roofing Finishing and handling over to the school management Schools and classrooms which have damages will be verified & checked by structural engineers and report issued to see if cost effective to repair. Based on recommendations from the structural engineer & approval by MoE will provide necessary retro fitting & repairs to those schools deemed cost effective to do. Phase 2 Later, after approval of design from MoE, we plan to make this building permanent by making necessary windows, doors etc.

Steel Structure TLC Design

Steel Structure under construction

Cost of TLC / Class rooms Stage 1 Cost of each TLC block is approx. US$ 3000 Stage 2 Approx cost of converting TLC block into permanent classroom is us$ 5000 Total cost of Classroom block (stage 1 + Stage 2) = US$ 8000 Each Block has 2 classes . That is US$ 4000 per permanent classroom

Shree Shivalaya Madhyamik Vidyalaya New Classroom Total No. of students – 450. Total staff – 17. Total Classes – nursery to 10, total 12 Total no. of rooms – 18 out of which 12 are fully damaged. Planned 2 TLC blocks to meet immediate requirement. Cost of Building TLC Blocks no 2 Phase 2 converting into class room TLC - 2 X 3000 = Us$ 6000 Class room – 2 X 5000 = US$ 10000

Shree Shivalaya Madhyamik Vidyalaya construction Due to space constraint’s we are making 1 block initially.

Nava Jeevan Madhyamik Vidhyalaya New Classroom Total Students: 350 (Boys-60%,Girls-40%). Total Classes: 1 to 10, total no. of rooms - 15 Total staff – 16. Building made of bricks and steel Truss, 2 class rooms fully damaged , 6 classrooms need to be demolished and new need to be built. Land ownership is of school. Manpower available for help. Need to build toilets Cost of Building TLC Blocks no 3 Phase 2 converting into class room TLC - 3 X 3000 = Us$ 9000 Class room – 3 X 5000 = US$ 15000

Shree Okharpauwa Madhyamik Vidyalaya Retrofitting Total No. of Students: 350 to 400. Total No. of Staff: 21 All classrooms made of concrete and are damaged. 10 class room block will be retrofitted, Toilets to be built and retention wall to be made. Cost of Retrofitting and toilet etc US$ 17,500

Bal Binod School Retrofitting Cost of retrofitting – Awaiting report Built by kirt7 under 11SFN.  Damaged by recent earthquake . Engineer will be giving his recommendation to repair soon . Cost of retrofitting – Awaiting report

Shree Shrijansil Prathamik Vidyalaya New Classroom No. of Classes – 4, Staff – 4, Students – 50 to 60 approx. No extra space to make new building Building is fully damaged Truss has been broken and fallen apart No pillar in buildings Toilets ok Cost of Building TLC Blocks no 2 Phase 2 converting into class room TLC - 2 X 3000 = Us$ 6000 Class room – 2 X 5000 = US$ 10000

Shree Ajingare Higher Secondary School Retrofitting + rebuilding Class – 7,8,9,10 – plan to use the same steel post structure and break the walls Class – 2,3,4,5 – steel structure from Japan aid, so just need to break the walls Computer Lab, Staff Lab, Library, Staff Canteen – Break all the walls as no steel structure Principle’s office, Staff room & library not usable *Note - No extra space to make new building. Awaiting reports and costs for works

Shree Mahadev higher Secondary School Under scrutiny Total no. of students – 623(40% boys, 60% girls). Total classes running – nursery to 12 and bachelors also. Tot no. of staffs – 23 excluding 10 bachelor level staffs. Total no. of rooms – 27 among which 17 is used for running school. School has occupied almost 23 ropanies of land, 5 ropanies is in its own name, the other land in the name of VDC.2 of the buildings made with Japanese Aid but fully damaged, truss can be used.No fund provided till date but Adams group of China has made around 14 truss.Total classes required to operation – 17 to 21.Has problem of bamboo and manpower Cost of Building 8 Blocks Cost of Retrofitting

Shree Mahadev Higher Secondary School, Duipiple Retrofitting + rebuilding Total Students – 425 to 450(40%boys, 60%girls). Total Classes running – 1 to 12. Alltogether 14 classes used for studying .Total no. of staffs – 17. School has 3 buildings out of 2 are made with Japanese Aid. All are fully damaged. Truss can be used though.Has water supply problemToilets are fully damaged. Furniture are also damaged in large number.Has bamboo and skilled manpower problem. 12 temporary classes required to run school.No fund has been made available till now. Cost of Building 8 Blocks Cost of Retrofitting Yet to be finalized awaiting architects report

Shree Shiladevi Madhyamik Vidhyalaya Under scrutiny Total no. of students – 301(boys – 35%, girls – 65%) Total no. of classes – 1 to 10. Total no. of rooms – 18. Land in the name of school. Korean group has made some sample truss classes but is incomplete. One of the Korean member has got injured. Toilets are also fully damaged Cost of Building 8 Blocks Cost of Retrofitting Awaiting Reports

Recent visit for raising awareness and support

Keep the donations coming in! ALL4NEPAL.org With the donations raised and between the RT Family members and global partners with RT Nepal the total amount raised and donated through the account so far is nearly €250,000.00 Empowering the future! Keep the donations coming in!