Gas-Lift Design Outline

Slides:



Advertisements
Similar presentations
New Gas Lift Products & Technology
Advertisements

GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
Choke Correlation and Gas Lift Curves P2ES Provides Several Curve Options 1.CC – Choke Correlation Curve Based on Oil Rate (OR) Based on Total Liquids.
DRILLING ENGINEERING Well Control.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Basics of Pump Vigyan Ashram, Pabal.
Hydraulic Valves. Objectives related to Valves 1.State the function of a valve. 2.Describe the three types of valves. 3.List the four uses of pressure.
Lecture 4 Pressure variation in a static fluid N.S. Equations & simple solutions Intro DL.
CE 230-Engineering Fluid Mechanics Lecture # 6 Basics of Fluid Statics.
Instrumentation Analyzer Pressure Regulation and Vent Recovery System Frank Ruiz, Ruiz & Associates.
Chapter 6 Pressure Control Valves
API GAS LIFT TASK GROUP CHAIR - JIM BENNETT EXXONMOBIL.
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
By: Gatut Widianoko Weatherford Artificial Lift Systems
Objectives for Basic Gas Lift Seminar
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Gas Lift Redesign in Dual Strings Completion
2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo.
Hydraulic Symbols. Piping and Tubing Symbols Normal working line Flexible working line Pilot line Drain line Enclosure outline Direction of flow.
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
Tangents and Differentiation
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
PDVSA INTEVEP Accumulation Process and Phenomena in Chamber Lift Completions Sergio Caicedo ASME/API Gas-Lift Workshop Houston, Texas, Spring 2002.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
© Copyright 2005 POSC Volume Reports and Flow Networks Overview.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Advanced Artificial Lift Methods Prepared by Dr. Nguyen Advanced Artificial Lift Methods – PE 571 Introduction.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
Experiment 6: Rankine Cycle Yvette Triay Reporter Group 3.
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
IPO GLV Throttling Mechanism with Inherent Reverse Flow Checking
Back Pressure Regulator Repair
Asekhame Yadua Introduction Main Results
All you want to know about plunger lift!
Analysis of Heading in Artificially Lifted Wells
Gas Lift in Subsea Wells
Dual Fuel Engines.
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
New Technology Opening Remarks
Continuous Flow (IPO) Valves
Flow Network Construction
Shell Exploration & Production
A typical lift scenario with tubing landed in the curve
Gas-Lift Breakout Sessions Fall 2003 Gas-Lift Workshop
Historical Review of Dual and Multiple Completions
CHAIR - JIM BENNETT EXXONMOBIL
P5523 Oil-to-Gas Separator
Consider a gas phase reaction
2001 ASME/API Gas-Lift Workshop
(Make More Fluid with Less Valves)
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Gas-Lift Breakout Session Report Out Fall 2003 Gas-Lift Workshop
QC checks on composition
CHAIR - JIM BENNETT EXXONMOBIL
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019

LAPLACE TRANSFORMATION

Presentation transcript:

Gas-Lift Design Outline Design Factors Injection Pressure Valve Size: 1.5” or 1” Port? Opening & Closing pressures Differential Valves Others? Continuous Flow IPO Valves Equilibrium curve Constant Rate (optimum gradients) Variable Rate PPO Valves Variable rate Dual Wells Intermittent Lift IPO Valves: unloading Spacing Factors Fall-back Pilot Operating Valve Gas-Lift Design: Breakout----Joe Clegg

Gas-Lift Design Static Flowing Valve type Size Seat/Port TEF Opening pressure Gas-Lift Design: Breakout----Joe Clegg

Equilibrium Curve Juch; Neely; Blann Gas-Lift Design: Breakout----Joe Clegg

IPO Valves: Constant rate design Gas-Lift Design: Breakout----Joe Clegg

Optimun Gradient Graphs Design graphs for: Wellhead Pressure = 100 psig 2.441” tubing, GLR = 750 cu.ft/barrel Gas Injection Pressure = 1000 psi Kill fluid gradient = 0.465 psi/ft Gas-Lift Design: Breakout----Joe Clegg

Variable rate Gas-Lift Design: Breakout----Joe Clegg

Blann & Winkler Gas-Lift Design: Breakout----Joe Clegg

Intermitent Gas-Lift Design-- Manual Gas-Lift Design: Breakout----Joe Clegg

Intermittent Gas-Lift Design Gas-Lift Design: Breakout----Joe Clegg

PPO valves Dual Well Gas-Lift Design: Breakout----Joe Clegg

IPO Valves Gas-Lift Design: Breakout----Joe Clegg

Conclusions Gas-Lift Design: Breakout----Joe Clegg