GHSP Problem Solving Team Champion: Team Members: Team Mentor:

Slides:



Advertisements
Similar presentations
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
Advertisements

A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Educator Evaluation System Salem Public Schools. All DESE Evaluation Information and Forms are on the SPS Webpage Forms may be downloaded Hard copies.
PHD Performance Management Program Matt Gilman Spencer Soderlind Brieshon D’Agostini October 19, 2011 PDCA Training Series 2 DO 1.
1 Team Skill 1 - Analyzing the Problem Sriram Mohan/ Steve Chenoweth 371 Ch 5 in Requirements Text.
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Overview of DMAIC A Systematic Framework for Problem Solving
10-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 10 Project Quality Management.
Managing Project Quality
PMP® Exam Preparation Course
© 2003 IBM Corporation July 2004 Technology planning for not-for-profit organizations IBM volunteer name Title, organization.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
CIS 499 Senior Seminar Introduction to IT project management.
Practical Assessment Project Template
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram) What solutions.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
Analyze Wrap Up and Action Items
Continuous Improvement Project (A Guideline For Sponsors)
Practical Assessment Project Template

ROLE of a Continuous Improvement LEADER
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Service Management World Class Operations - Impact Workshop.
Causal Analysis & Resolution (CAR) Support Category
BUSINESS DRIVEN TECHNOLOGY
Lean Six Sigma DMAIC Improvement Story
Problem Solving Sheet Guidelines
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Project Management Processes
PROBLEM SOLVING MODULE
Project Integration Management
<Project Name> <Name> SOLUTIONS / COUNTERMEASURES
Policy & Procedure Writing
Global 8D Problem Solving
TechStambha PMP Certification Training
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
PDCA Problem Solving Guide
OPS/571 Operations Management
SNMS Supplier Network Management System
Lean Six Sigma DMAIC Improvement Story
A3 Project Title Project Lead: Facilitator: Project Champion(s):
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
CIS12-3 IT Project Management
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Project Management Processes
Problem Solving.
Chapter 3: Project Integration Management
by Operational Excellence Consulting LLC
Site (e.g., LARC Embakasi)
Practical Assessment Project Template – REV. 5.2
Validation by Process Owner Validation by Project Leader
Quality Assurance in Clinical Trials
Project Management Essentials
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Practical Assessment Project Template – REV. 5.2
1 -: 8D Problem Solving Technique :- Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Practical Assessment Project Template – DMADV
Presentation transcript:

GHSP Problem Solving Team Champion: Team Members: Team Mentor: Problem Statement (what is wrong with what): CI-FORM-COR-X08

GHSP Problem Solving Team Champion, Members, roles, and Mentor are identified. Problem Statement complete. Business Plan review – as applicable. Reviewed with Mentor. CI-FORM-COR-X08

Problem Definition (Summation from above tool) GHSP Problem Solving Define the Problem (5W-2H or Is-Is Not): What: When: Where: Why (is this a problem): Who: How: How Much (many): Current Situation (Gap vs Goal, include charts/graphs/pictures/flowchart as necessary): Problem Definition (Summation from above tool) CI-FORM-COR-X08

GHSP Problem Solving Lessons learned from GEMBA walk: SMART Goal: CI-FORM-COR-X08

GHSP Problem Solving Define Problem Problem is analyzed using data (run chart, pareto, check sheet, is/is not, etc. Problem scope is appropriate Problem solving goal identified – SMART goal. Reviewed with Mentor CI-FORM-COR-X08

GHSP Problem Solving Protect the Stakeholders CI-FORM-COR-X08 Protect (Y/N) If No, Why not? Method Results   CI-FORM-COR-X08

GHSP Problem Solving Protect the Stakeholders Protection Method: Verification method is effective: CI-FORM-COR-X08

GHSP Problem Solving Protect Stakeholders Stakeholder(s) have been identified. Method(s) of Protection identified. Protection is implemented and communicated to necessary stakeholders. Protection method has been verified to be effective. Protection results are recorded Reviewed with Mentor. CI-FORM-COR-X08

GHSP Problem Solving Analyze and Verify Root Causes Use Fishbone, 5-why, or other root cause analysis tools. Tool templates can be found at the Problem Solving intranet page.. CI-FORM-COR-X08

GHSP Problem Solving Analyze and Verify Root Causes Occurrence Root Cause: Verification Method: Escape Root Cause: Verification Method: Systemic Root Cause: Verification Method: CI-FORM-COR-X08

GHSP Problem Solving Analyze and Verify Root Causes Root Cause analysis complete and appropriate tools used. Occurrence root cause(s) identified. Occurrence root cause verified. Escape root cause(s) identified if applicable Systemic root cause(s) identified. Reviewed with Mentor. CI-FORM-COR-X08

GHSP Problem Solving Select and Implement Solutions Thought Starters: What is the team going to do? Who is going to do it? When is it going to be done? How to validate the solution? Short term Initial results of countermeasure? Feedback from users? CI-FORM-COR-X08

GHSP Problem Solving Select and Implement Solutions (Recommendation-Create a PDCA for each solution) Standardization Countermeasure Plan A P C D Implementation Plan Validation Data CI-FORM-COR-X08

GHSP Problem Solving Select & Implement Solutions Documentation of plan / schedule of tasks (PLAN). Documents necessary to run test / trial / implementation (PLAN). Photos / videos / drawings of test / implementation effort (DO). Data / proof collected during countermeasure testing (DO) Assessment of goal and, if applicable, root cause impact (CHECK). Documentation required to standardize, communication of change, training, etc. (ACT) If c/m is unsuccessful, description and documentation of action taken. (ACT) Reviewed with Mentor. CI-FORM-COR-X08

GHSP Problem Solving Verify Effectiveness (Long-term): Verification Method (Data, Auditing, Gemba Walks, etc.) Before vs After data (compare against SMART goal) Before vs After pictures Operator/User Feedback: CI-FORM-COR-X08

GHSP Problem Solving Verify Effectiveness Verification period is appropriate. Verification data is collected. Problem solving goal met – graphical data included. Reviewed with Mentor CI-FORM-COR-X08

GHSP Problem Solving Sustain and Share Lessons Lessons learned – what did we learn? How did we share/communication the lessons? Did we standardize solutions across departments, plant and/or organization? CI-FORM-COR-X08

GHSP Problem Solving Sustain and Share Lessons Cost Savings/ROI? Individual growth? Overall benefits (expected and unexpected)? CI-FORM-COR-X08

GHSP Problem Solving Sustain and Share Lessons Description / assessment of expected and unexpected benefits (if applicable). Description of individual and team growth / skills learned. Description of countermeasure standardization in daily use (Look across production, departments, organization) Data/photos/video documentation of ongoing sustainment. Reviewed with Mentor CI-FORM-COR-X08

GHSP Problem Solving CI-FORM-QUA-X02   Corrective Action Closure Acknowledgement The undersigned have reviewed the attached corrective action request and acknowledge the actions present will sufficiently correct the described problem or defect. At least two (2) approval signatures required for closure. Corrective Action/PTR Number:________________________________ Approvals Date Notes Exceptions/Comments Quality Leader or designate Technical Leader or designate Production Leader or designate Operations Manager or designate SDE Manager or designate (supplier issues only) EMS/QMS Management Rep or designate (system audit issues only) PTR Description: CI-FORM-QUA-X02