U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005

Slides:



Advertisements
Similar presentations
1 Summary Slides on FNST Top-level Technical Issues and on FNSF objectives, requirements and R&D Presented at FNST Meeting, UCLA August 18-20, 2009 Mohamed.
Advertisements

Hongjie Zhang Purge gas flow impact on tritium permeation Integrated simulation on tritium permeation in the solid breeder unit FNST, August 18-20, 2009.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
What is Dual Coolant Blanket? Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University of California, Los.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
US TBM Activities Update 1- Quick background 2- Recent Activities Mohamed Abdou FNST Meeting held at UCLA, August 2-4,
FNSF Blanket Testing Mission and Strategy Summary of previous workshops 1 Conclusions Derived Primarily from Previous FNST Workshop, August 12-14, 2008.
US TBM Meeting INL, August 10-12, 2005 B. J. Merrill and D. A. Petti Fusion Safety Program Safety and Tritium R&D.
DCLL TBM: Comments on Design Strategy, and Experimental plans, schedule and required diagnostics Compiled by Neil Morley for the TBM Meeting May 10, 2006.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
Summary of Current Test Plan for US DCLL TBM in ITER Neil Morley and the US TBM Participants INL, August
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
Thermofluid MHD issues for liquid breeder blankets and first walls Neil B. Morley and Sergey Smolentsev MAE Dept., UCLA APEX/TBM Meeting November 3, 2003.
The effect of the orientations of pebble bed in Indian HCSB Module Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept.
2 nd EU-US DCLL Workshop University of California, Los Angeles, Nov th, 2014.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Strawman R&D Tasks and R&D Costs Neil Morley and Alice Ying INL, August
1 ITER Test Blanket Module (TBM) Current U.S. Designs, Plans, Issues, and Material R&D Needs Prepared by: Presented at the MASCO meeting Washington DC,
ITER Test Blanket Module and the Need for Coordination Outline What ITER means for the World Technology / Chamber / Blanket Community ITER Plans for TBM.
1 Recent Progress in Helium-Cooled Ceramic Breeder (HCCB) Blanket Module R&D and Design Analysis Ying, Alice With contributions from M. Narula, H. Zhang,
DCLL R&D Task Area Reports Compiled by Neil Morley for the TBM Conference Call Oct 6, 2005.
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
Fusion: Bringing star power to earth Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego NES Grand Challenges.
MHD Modeling and Experiments at UCLA for the ITER Test Blanket Program N. Morley, M. Abdou, A. Ying, S. Smolentsev, M-J. Ni, T. Sketchley, J. Burris, M.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
1 U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) 2.Possible.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame.
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Base Breeding Blanket and Testing Strategy In FNF Conclusions Derived from Previous FNST Workshop, August 12-14, 2008.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
US ITER TBM DCLL ITER-TBM Plan and Cost Summary PbLi Flow Channels He-cooled First Wall PbLi He SiC FCI 2 mm gap US DCLL TBM – Cutaway Views 484 mm US.
Review of Thermofluid / MHD activities for DCLL Sergey Smolentsev & US TBM Thermofluid/MHD Group 2006 US-Japan Workshop on FUSION HIGH POWER DENSITY COMPONENTS.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
DCLL Thermofluid/MHD R&D Sergey Smolentsev, Neil Morley and the ITER- TBM thermofluid group US ITER-TBM Meeting August 10-12, 2005 INEL.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Overview of the US ITER Test Blanket Module (TBM) Technical Plan
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
HARNESSING FUSION POWER POWER EXTRACTION Power Extraction Panel Preliminary Research Thrust Ideas Robust operation of blanket/firstwall and divertor systems.
Thermal-hydraulic analysis of unit cell for solid breeder TBM
US Participation in the
ITER Testing and Required R&Ds for Solid Breeder TBMs
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
Material Issues for the US ITER-TBM Program
DCLL TBM Reference Design
ITER Test Blanket Module (TBM)
Integrated Modeling Approach and Plans
Tritium Research in TITA Information Required
Overview and Meeting Objectives
Status of ARIES-CS Power Core Engineering
VLT Meeting, Washington DC, August 25, 2005
Remarks on US Costing Activities for the US ITER-TBM
Mohamed A. Abdou Summary, Approach and Strategy (M. Abdou)
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
ITER-TBM Planning and Costing Meeting
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
Nuclear Analyses for two “Look-alike” HCPB Blanket Sub-modules for Testing in ITER Mahmoud Z Youssef UCLA Presented at ITER-TBM4 Meeting, UCLA, March 2-4,
University of California, San Diego
TITAN - Flow Control and Thermofluid Modeling Tasks
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005 Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) Possible Practical Collaborations with Other Parties D. K. Sze (10 min.) Impact on TBM of Frame Design and Replacement Procedure C. Wong (10 min.) Comments on Quality Assurance R. Kurtz (10 min.)

Overview of US ITER TBM R&D, Time Schedule, and Cost Estimation Mohamed Abdou, Alice Ying, Neil Morley, Clement Wong, Tom Mann, Dai-Kai Sze, Mike Ulrickson, and the US ITER TBM Team TBWG-16 Detailed information is available at http://www.fusion.ucla.edu/ITER-TBM Note this information is being continually updated and refined.

US ITER TBM Program: Selected Concepts 1. The Dual-Coolant Pb-17Li Liquid Breeder Blanket concept with self-cooled Pb-Li breeding zone and flow channel inserts (FCIs) as MHD and thermal insulator -- Innovative concept that provides “pathway” to higher outlet temperature/higher thermal efficiency while using ferritic steel. -- Plan an independent DCLL TBM that will occupy half an ITER test port with corresponding ancillary equipment -- Work closely with any Parties interested in this or similar concepts 2. The Helium-Cooled Solid Breeder Blanket concept with ferritic steel structure and beryllium neutron multiplier, but without an independent TBM -- Support EU and Japan efforts using their TBM structure & ancillary equipment -- Contribute unit cell /submodule test articles that focus on particular technical issues

A Detailed TBM Planning and Costing Activity for the US TBM Program has been requested by the DOE Planning will be for the US Reference Scenarios: DCLL TBM with PbLi exit temperature of 470ºC and a series of TBM that occupy half a port. HCCB submodule that has a size of 1/3 of one-half port in cooperation with the EU or Japan Detailed planning and cost is for a 10 year period between now and the shipment of the TBM deliverables in 2015 for DAY ONE ITER operation. The cost is the total cost for the TBM project including R&D, design, engineering, fabrication, qualification, etc., as well as the cost of interface with ITER and other parties. The R&D Cost includes all costs related to the Reference Scenarios that occur within the next 10 year period whether they are related to the first (Day ONE) Test Articles or subsequent test articles. Cost of the deliverables includes only the cost of the First Test Article and associated equipment (See Project Deliverables slide).

US Test Blanket “Project” Deliverables Based on Reference Scenario Parameters Pb-Li Primary Coolant Loop Transporter, Port Cell Area Secondary He Coolant Loop TCWS Test Port Primary He Coolant Loop US DCLL Test Module Helium Flow Loop (primary) PbLi Flow Loop Tritium Processing Systems Secondary Helium Flow Loop (and Heat Exchanger for PbLi Flow Loop) US HCCB Test Submodule Ancillary Equipments (primary helium flow conditioners, measuring systems for helium, tritium, and test submodule) DCLL TBM coolant circuits, Red-doted circuit shows the primary He loop cooling the first wall and all FS structures, Blue-dash circuit shows the Pb-Li loop and the Green-dash circuit shows the secondary helium loop.

US ITER TBM Costing Activity Milestones 12-Aug-05 Costing Activity Initiated 31-Aug-05 WBS established for Level 6 and lower Responsible persons for Level 6 and lower assigned 7-Sep-05 WBS for Level 6 and lower revised 9-Sep-05 Conceptual design summaries for DCLL and HCCB issued 6-Oct-05 Initial schedule and base cost estimate for WBS level 6 of DCLL and HCCB 27-Oct-05 Initial schedule and base cost estimate for engineering design, procurement/fabrication, and ancillary equipment 7-Nov-05 R&D decision criteria established 30-Nov-05 Complete revised schedule and cost estimate for WBS level 6 and lower (include contingency factor) 12-14 Dec-05 “Physical” Meeting (all information about costing will be presented and discussed) 16-Dec-05 R&D priorities finalized 13-Jan-06 Initial Draft Costing Activity Report Due 15-Feb-06 Complete Draft of Final Costing Activity Report 22-23 Feb-06 Physical meeting (internal review of draft report) 1-Mar-06 Complete incorporating comments into the Report 15-Mar-06 Send Final TBM Cost Estimate Report to DOE 28-Mar-06 “External” review

US DCLL TBM Reference Scenario Conditions FS Tmax ≤ 550° C FS/PbLi < 500° C SiC/PbLi < 500° C SiC Tmax < 500° C He < 450° C PbLi ≤ 470° C Module Geometry: Port frame thickness, mm 200 “Dog leg” width, mm 30 Frame and TBM gap width, mm 20 TBM height, m 1.66 TBM width, m 0.484 Radial depth, m 0.413 Frontal area, m2 0.803 First wall shape flat Module Materials: Structural material Ferritic Steel (FS), e.g. F82H or EUROFER Breeding material Pb-17Li FW/structural coolant 8 MPa helium Intermediate loop coolant Flow channel insert SiCf /SiC or metallic sandwich e.g. FS/Al2O3 FW coating 2 mm Be Notes: DCLL features will be tested at PbLi temperatures compatible with ferritic steel (500C). He and PbLi flowrate, and inlet and outlet temperature, will be varied depending on experiment underway, but these limits will not be exceeded External piping material for Helium system will be austenitic steel (transition element required) External piping material for the PbLi has not yet been decided, but likely to be a commercial ferritic/martensitic steel up to the HX (Cutting/rewelding technique required)

US Test Blanket Project Organized by Subsystem and Deliverables

US Test Blanket Work Breakdown Structure

Most Work Breakdown Structure Elements are further broken down into the following subcategories: Administration R&D Engineering Preliminary Design Detailed Design Fabrication Support Fabrication/procurement Assembly, testing, & installation

US strategy for ITER testing of the DCLL Blanket and First Wall Concept Develop and deploy a series (~4) of vertical half-port DCLL-TBMs during the period of the first 10 years of ITER operation with Test articles from day one of ITER operation with specific testing goals and diagnostic systems Associated ancillary equipment systems in a transporter behind the bioshield and in space in the TCWS and tritium buildings using bypass PbLi flow to keep temperature of ancillary equipment below material limits Develop international collaboration on PbLi systems to the maximal extent

US DCLL TBM Testing Schedule in the US DDD ITER Year -1 1 2 3 4 5 6 7 8 9 10 ITER Operation Phase Magnet testing & vacuum HH- First Plasma HH DD Low Duty DT High Duty High Progressive Testing Conditions Toroidal B field Vacuum Heat flux B Field Disrup-tions Small DD neutron flux NWL Full disruption energy Fluence Accumula-tion Electromagnetic/Structural (EM/S) TBM Install RH System check-out Transient EM Loading on structure and FCIs FW heat flux loading ITER field perturbation Hydrogen permeation LM-MHD tests Nuclear Field/ Tritium Prod. (N/T) TBM  Finalize Design Nuclear field Tritium production Nuclear heating Structure and FW heating Thermofluid/ MHD (T/M) TBM FCI thermal and electrical insulation Tritium permeation Velocity profiles Integrated (I) TBM High temperature effects in TBM Tritium permeation/recovery Integrated function, reliability

Electromagnetic/Structural (EM/S) TBM (for Hydrogen Phase) Testing Goals Validate general TBM structure and design Measure forces and the mechanical response of the TBM structure to transient EM loads Determine ferromagnetic and MHD flow perturbation of ITER fields Measure thermal and particle load effects on plasma facing surface (Be) and FW structure/heat sink Information in the early HH phase can be used: to modify designs of subsequent TBMs to be deployed in the later DT phase for ITER DT Licensing. Establish performance baseline and operational experience of the TBM and ancillary systems Integration of control systems and diagnostics with ITER systems Demonstration of required subsystems and port integration Demonstration of remote handling procedures Measurement of thermal time constants and heat loss Measurement of tritium (hydrogen) permeation characteristics Testing heating/filling/draining/remelting and accident response procedures Perform initial studies of MHD effects and Flow Channel Insert performance MHD flow distribution (manifold design, multichannel effects) 3D pressure drop (toroidal field and toroidal + true poloidal field) FCI performance changes as a function LM exposure time FCI response to loading from EM events (water hammer, transient eddy current forces) Map ITER field in TBM area

DCLL Test Module Fabrication Schedule Summary (note: schedules are evolving) *Prototype may or may not be full scale

Purposes of R&D activities in a “project” are to reduce risk Risk that the experimental device will negatively impact ITER plant safety, licensing operation schedule Risk that TBM experiments will not achieve experimental mission Understanding of phenomena and modeling capability is insufficient to interpret or utilize data Failures in diagnostics or large inaccuracies in measurements give incomplete or poor data Unanticipated system performance leads to irrelevant or unquantifiable operating conditions

Main DCLL TBM R&D Areas Identified in the US Activity Main DCLL TBM R&D Areas Identified in the US Activity. Several are common issues of interest to all Parties Test Module R&D Tasks Areas (some have several subtasks) US Person – Morley Tritium Permeation Merrill Tritium Extraction (PbLi & He) Willms Thermofluid MHD Smolentsev SiC/SiC Fab Process & Properties Katoh SiC/PbLi/FS Compatibility Pint FS Box Fabrication & Material Issues Rowcliffe/Kurtz Helium Flow Distribution and HX Wong PbLi/H20 Hydrogen Production Be Joining to FS Zinkle/Ulrickson Virtual TBM Simulation Suite Abdou Advanced Diagnostics Integrated mockup tests Ulrickson/Tanaka

DCLL Test Module R&D Schedule Summary (note: schedules and R&D tasks are evolving)

Some R&D area highlights: Thermofluid – MHD Thermofluid – MHD is an important class of issues for the DCLL design, operation and safety Several R&D subtasks are being planned Continued model development: 3D-HIMAG and other research codes needed to predict basic performance of DCLL and to utilize/interpret TBM experimental data Experiments on basic FCI performance: 3D pressure drop, flow development, effect of / need for pressure equalization holes, overlap regions, etc. Experiments on manifolds design: needed to explore range of achievable flow uniformity under various operating conditions Partially integrated MHD flow tests on flow mockups Example: Effect of FCI pressure equalization gap on Hartmann wall side, SiC=20

Some R&D area highlights: Tritium Inventory and Permeation Modeling 10 20 30 40 50 0.0 0.5 1.0 1.5 2.0 Tritium pressure above PbLi (Pa) Number of pulses Simulations have lead to a new strategy for tritium control Swept secondary containment around transporter cask and TCWS skid for controlling leaked or permeated tritium More aggressive permeator development to reduce tritium partial pressure in PbLi Swept secondary containment around all PbLi (and He) piping Operation at lower He/PbLi temperatures if ITER limit is approached TMAP model and resultant tritium pressure for an example DCLL case

An Idea: Virtual TBM Better integration and management of codes used for predicting TBM conditions and interpreting TBM experiments CAD MCNP HIMAG TMAP ANSYS RELAP … Experience with CAD/MCNP should just be the start

ORNL

Rough DCLL TBM Cost Estimate Summary Covering the next 10 years (Subject to revision in detailed evaluation of costs) Preliminary DCLL R&D Cost Summary Tritium Permeation XXX Thermofluid MHD SiC/SiC Fab Process & Properties SiC/PbLi/FS Compatibility FS Box Fabrication & Material Issues Helium Systems Subcomponent Tests PbLi Hydrogen Production Be Joining to FS (TBM PFC) Virtual TBM Advanced Diagnostics Integrated mockup tests Design, analysis and DCLL TBM and systems fabrication rough cost estimate is XXX some key costs still not included Prioritizing and trade-off assessment activity underway Risk assessment activity underway

Ceramic Breeder Test Submodule Inserting “US” unit cells into the EU HCPB structural box Electromagnetics/Neutronics unit cell design Unit (mm)

Main HCCB Test Sub-Module R&D Areas Identified in the Activity Test Module R&D Ying Helium flow distribution and manifold testing Calderoni Pebble bed thermomechanics and T recovery Calderoni/Katoh RAFS fabrication development (overlap with US DCLL) Rowcliffe/Kurtz T-control and predictive capability Ying/Merrill Development of FS & SS transition element Zinkle/Kurtz Diagnostics and instrumentation (some overlap with US DCLL) ½ scale mockup and qualification tests (some overlap with US DCLL) Tanaka In-pile pebble bed assembly test Katoh/Calderoni

HCCB Test Sub-Module Schedule Summary (note: schedules and R&D tasks are evolving)

Rough HCCB TBM Cost Estimate Summary Covering the next 10 years (Subject to revision in detailed evaluation of costs) Engineering Design Activities: ~$XXX Fabrication of 1st series of unit cells ~$XXX

Categorizing R&D Tasks A system needs to be established to categorize R&D tasks to give a cost range Simple rating system being tried in the US: E = Essential for the qualification and successful execution of the TBM experiment, and no other party is doing it I = Important for the qualification and successful execution of the TBM experiment, or Essential but is definitely being done by another party D = Desirable but the risk is acceptable if not performed According to this system: International effort affects US prioritization

Some initial conclusions (that some have already realized, but all need to face) TBMs are generally much more expensive than initial estimates might show Many hidden expenses will continue to be discovered Undefined elements of ITER QA/licensing requirements can impact cost significantly (~>10%) R&D efforts are a large portion of costs They must be scrutinized and prioritized R&D activities mostly address areas of interest to other Parties Tested full scale prototypes are likely necessary to avoid failures in first years of operation that jeopardize mission of validating DT phase TBM There is very little time left if subscale mockups and prototypes are to be attempted.

TBWG should identify and coordinate effort on key, common, R&D areas Suggestion, For each common R&D area, one or two parties (depending on issue difficulty and criticality) should “volunteer” to do the research, and share the results Be layer joining to FS Tritium extraction and cleanup in He purge and coolants Common diagnostic sensors and controllers Common test and qualification tests and test facilities Virtual TBM simulation capabilities FS technology (joining, shaping, in-situ rewelding, irradiation database) FS to Austenitic Steel Transition Sections PbLi/Water hydrogen generation (all PbLi systems with volume > 280 liters) (Another US Presentation will elaborate on practical possibilities…) Cooperation on R&D issues is the first step to cooperative test programs – once common needs and purposes are clearly evident to the parties