HD ENGINE RAW PN MEASUREMENT

Slides:



Advertisements
Similar presentations
PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.
Advertisements

17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 24th WHDC, Geneva, 03 June 2008 Informal document No. GRPE (56th.
Particle Measurement Programme Informal Working Group (PMP) Progress Report and Next Steps Giorgio Martini Sustainable Transport Unit.
Institute for Energy and Transport B. Giechaskiel, G. Martini
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 22nd WHDC, Geneva, 16 January 2008 GRPE/WHDC/FE08 Informal document No.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Draft presentation to GRPE Informal document No. GRPE-52-9.
RDE COM Meeting ACEA Page 1 Random Cycle Generator.
OICA presentation of ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Preliminary results PMP: 1 st.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
PM and PN Emissions from Two Scania Euro V Engines Hua Lu Karlsson
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
JRC 30 March Particle Measurement Programme Exploratory work & Validation Exercise (JRC) First Validation Exercise comparisons B. Giechaskiel, G.
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
PN-Calibration Issues
Technologies for low emission light duty powertrains
HD CNG ENGINE PN MEASUREMENT
PMP IWG Progress Report
EPPR India comments on B1 Text 15th September 2017
PMP IWG Progress Report
PMP IWG Progress Report
PMP IWG Progress Report
Progress report by the Chair of the informal group on REC
PMP Heavy Duty Validation Exercise
Particle Measurement Programme - Report
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
Off-cycle Emissions GTR – Status Report for GRPE
76th UNECE GRPE session PMP IWG Progress Report
76th UNECE GRPE session PMP IWG Progress Report
BRAKE PARTICLE EMISSIONS
77th UNECE GRPE session PMP IWG Progress Report
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
WLTP DTP PM-PN Subgroup Activity Report
RDE Regulation Commission Meeting
PMP IWG Progress Report
HD ENGINE RAW PN MEASUREMENT
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Input ACEA Boundary Conditions.
Additional RDE trip indicator(s)
Informal document GRPE Rev1
Inter-Laboratory Comparison Exercise CPC CALIBRATION
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
PN-PEMS Progress update
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
Co2 veHICLE test Feedback on three options for implementation of the test The purpose of the test is to increase the credibility of the simulation based.
Informal document GRPE-77-30
RDE-LDV working group 20 November 2012, Brussels, EU Pierre Bonnel
Informal document GRPE-79-20
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
Candidate Regulations for IWVTA
Presentation transcript:

HD ENGINE RAW PN MEASUREMENT PMP GRPE-74 GENEVE, 11 January, 2017 Hua Lu Karlsson

Background PN should be measured via partial dilution or CVS system according to the current regulation HD OEMs requested PMP program to evaluate direct PN measurement for HD application Several OEMs have already measured raw PN emissions for development purpose for many years, experienced that the instrumentation and method are robust.

ACEA Round Robin Program PN measurement

Comparison between different PN measurement

Brief summary The differences between diluted and raw PN measurements are similar to the data reported by JRC PEMS PN HD program. The differences are in similar magnitudes as the differences between CVS and particle flow PN sampling. ACEA requests PMP program further investigates the feasibility to allow PN raw measurement for HD applications.