UNC Review Group 0251 Metering Issue for Consideration

Slides:



Advertisements
Similar presentations
Update on IDNO/DNO working group DCMF 12 November 2009.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU 3 rd Package Clarification of points raised at Transmission Workstream 3/12/2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.
Accuracy of CV determination systems for calculation of FWACV Dave Lander.
Potential reforms to the CoS meter reading process for smart gas meters Setting the open letter in context Rachel Hay 16/01/14.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
Energy Networks Association Flow Weighted Average Calorific Value Options Biomethane Campaign Working Group 7 th August 2014 The Voice of the Networks.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
DAQ Systems and Instruments for Hx Performance Testing and Periodic Monitoring.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Accuracy of CV determination systems for calculation of FWACV Dave Lander Update 12 th October 2011.
Didcot Biomethane to Grid project Learning Points SGN and CNG Services Ltd (CSL)
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Automation and Drives Siemens Flow Instruments A/S The Flow Force.pptApril Dedicated Program SITRANS F O Back to animation Flow measuring with differential.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Customer Charge On behalf of all DNs 25 October 2010.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
UNCC 11 November 2013 Request for Clarification on AUG Rules Fiona Cottam.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group -140 Thoughts on additional information requirements.
Industry Dialogue on xoserve Services 14 th September 2007.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
aNamePEN no 1.Harsh Patel Prince Patel Ronak Trivedi Yusuf Khan Guided by: M. M. Chhatbar Subject:
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
IGT and Shipper Workgroup meeting 28 th February 2011.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Accompanying Narrative
Settlement Reform Advisory Group
Horndon Temperature Error (SMER)
Wales & West Utilities Entry – Standard Special Condition D12
Modification Proposal 0283 Update
Action 0002: Meter Error Notifications
Chris Warner Network Code Manager
The upstream effect on back pressure ratio
LDZ Offtake Meter Orifice Plate Error
Exit Capacity Substitution and Revision
Chris Warner Network Code Manager
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Long Term Non Firm Capacity Update
Entry Capacity Transfer and Trade
Connected System Exit Points - Update
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Stefan Leedham Transmission Workstream 2nd November 2006
Gas Customer Forum 28 July 2008
Capacity Access Review
Presentation transcript:

UNC Review Group 0251 Metering Issue for Consideration 21 September 2009

Metering - Governance Background Metering is Governed by DECC and Ofgem Responsibility is at the terminals Regulation provide prescriptive arrangements (GCOTE 1997) Metering predominately Orifice plates (120 / 60) Purpose for metering developed

Ofgem Governance Provided for within the GCOTE Scope for CV and metering Requires sites to be directed, setting out performance requirements and Letter of approval Charging areas defined by industry Declared or FWACV can be operated FWACV seeks to protect consumers (1MJ/m^3 c2.5%)

Metering Standards Orifice plates standard ISO 5167 UNC OAD appendix D sets out requirements 1.1 % on volume Disconnect between entry and exit 1991 Vs 2003 Supplementary agreements allow greater uncertainty ? 0 to 30% of flow, +/- 3.6% 30 to 100 % of flow, +/- 2.1%

ISO 5167 ISO standards updated approximately every 5 years Changes to ISO 5167 – 2003 1. Discharge Coefficient 2. Expansibility Factor 3. Permanent Pressure Loss 4. Upstream Temperature Considered that 1991 overstates when compared to 2003 by approximately 1%, depending upon meter configuration

Other Factors and consideration Fixed factors for Pressure Temperature http://www.ofgem.gov.uk/Networks/Archive/Gas%20energy%20measurement%20a%20consultation%20document%2027%2012.pdf

Moving the debate forward To what extent does the difference in standards and range of uncertainty contribute to shrinkage Winners and losers Are localised factors more applicable Offtake Consumers meters This is an area for further work and investigation