ANS Operational Performance Framework as seen by the Airports

Slides:



Advertisements
Similar presentations
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
David Gamper, Director, Safety and Technical Affairs ACI World PRE-CONFERENCE WORKSHOP for the ICAO AIR NAVIGATION CONFERENCE ICAO HEADQUARTERS MONTREAL.
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Airside Capacity Enhancement
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Traffic Management and FUA integration
Information Management The ICAO Perspective
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
FASVIG Introductory Meeting
CANSO Role in ATFM/CDM in APAC
ANS Operational Performance Framework as seen by the Airports ICAO Worldwide Symposium on Performance of the Air Navigation System, Montreal, 27 March.
ICAO-IATA Cross-Border ATFM Workshop
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
ATM2003 / Students’ Programme „Structuring of co-ordination parameter at airports “ Franziska Meier Dresden University of Technology – Institute of Aviation.
Aviation Innovation for Regional Integration
Performance Framework for Efficiency H. Sudarshan
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Flight Operations.
ASBUs – Blocks 2 & 3 Overview Blocks 2 & 3 – ACI Viewpoint
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Collaborative Decision Making Module 5 “The Collaborative Environment”
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
Airport Slot Coordination & its Role in the CDM Process
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Door to Door Travel Model
Continuous Climb Operations (CCO) Saulo Da Silva
NextGen and Its Impact on Performance
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Innovation for Regional Integration
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
ICAO Air Navigation Bureau
FAA and JPDO ASAS Activities
CANSO Role in ATFM/CDM in APAC
Workshop on preparations for ANConf/12 − ASBU methodology
Traffic Management and FUA integration
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Collaborative Decision Making “Developing A Collaborative Framework”
Long term vision for Air Traffic Systems CARATS
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
Dave Behrens Director, Infrastructure Strategy IATA
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
Presentation transcript:

ANS Operational Performance Framework as seen by the Airports ICAO Worldwide Symposium on Performance of the Air Navigation System, Montreal, 27 March 2007

Free up the sky?

Free up the sky?

The Operational Concept: key deliverables for the aviation community To raise awareness of the need to change the way ATM is planned, to understand that planning by one party has impacts on all others and vice versa. To provide “getting-started” guidance for all regions, with tailor-made pace and focus To promote global harmonisation and an agreed transition strategy To foster capacity and safety, both locally and globally

ATM and Airport Operations: what airports need to perform Local and strategic Collaborative Decision-Making (CDM)

There is more than just the skies (Airline) Great, but what we want is this ... (ATC) Sorry guys, but we work like this ... (Airport) We plan this ... Collaborative Decision Making ??? (PAX) Schedule, check-in, security, delays, … (Ground handling) How will we cope? (Communities) Noise + gaseous pollution, safety ... (Legislator) I have a constituency, haven’t I?

ATM and Airport Operations ATS ATFM ASM Local CDM: a clear necessity AIRPORTS Airlines ATM Airside Landside Third parties

ATM and Airport Operations BUT: No airline will ever allow to be influenced on their operations (a/c turn-around, sequence of doors closed at gate, ...) No ATC will ever allow to be influenced on local operational airspace and rwy usage No airport operator will ever allow to be influenced on safety processes, investments and infrastructure usage, especially tailored for only one carrier Local CDM: a clear necessity AIRPORTS Airlines ATM Operational CDM is restricted to joint data/information, tight decision sharing and trilateral discussion of effects

Airport Collaborative Decision Making Future Programmes and development Airport Collaborative Decision Making Airport Collaborative Decision Making means information sharing and balancing of operational decisions between all stakeholders for the optimum output Possible instruments: Arrival Manager is a system and constituent for traffic flow through a defined block of airspace Departure Manager is a system and constituent for on-time delivery of departures HALS/DTOP: high approach landing system/dual threshold operations Slot swapping Speed control on final HCC /Hub Ctrl. Center, trilateral ops management Introduction of information pools (shift briefings etc.) Joint understanding of requirements of all stakeholders

ATM and Airport Operations: what airports need to perform Local and strategic Collaborative Decision-Making (CDM) A-SMGCS, Multilateration: equip aircraft, switch on transponder (on ground!), tighten separation RWY occupancy: reduce time on rwy – 5” less per ATM means 6’ more in FRA  HIRO, checklists, clear when cleared stand productivity: communicate actual ETD to operator, handlers’ equipment needs to be allocated, next INB is waiting Better links between systems (AMAN, DMAN, CAPMAN, SMAN) Better match between the various slots (Airport & ATFM slots) Optimal aircraft separation (M-Lat, wake vortex prediction, …) GPS / GBAS capability for landing/take off (fleet wide) Brake-to-vacate systems for aircraft (to minimize Rwy occupancy time)

ATM and Airport Operations: new initiatives Pilot Performance Days Joint controller workshops (discussing mutually beneficial improvements in terms of capacity and safety) Capacity Manager / CapMan (pre-planned just-in-time coordination of Rwy- and terminal usage)

CAPMAN is a modular designed system to... Future Programmes and development CAPMAN is a modular designed system to... unlock hidden capacity by calculating and forecasting the available operational capacity up to 10 hours ahead, for arriving and departing aircraft, based on: available infrastructure traffic demand current weather conditions and weather forecast for the next 10 hours make best use of available capacity by calculating the optimum runway utilisation and thus giving the available take-off and landing slots for each individual runway at ten-minute intervals. Providing these information for up to 10 hours, the system supports a well-balanced runway utilisation. sorting in the air, NOT on the ground

CAPMAN is a modular designed system to... Future Programmes and development CAPMAN is a modular designed system to... improve punctuality by forecasting the available operational capacity and the traffic demand, CAPMAN enables the air traffic flow management to discover possible bottlenecks in advance and thus having sufficient time for pro-active sorting and swapping to reduce future delays and improve the overall punctuality of the air traffic.

ATM and Airport Operations: new initiatives Pilot Performance Days Joint controller workshops (discussing mutually beneficial improvements in terms of capacity and safety) Capacity Manager / CapMan (pre-planned just-in-time coordination of Rwy- and terminal usage) High Intensity Runway Operations (location and type of exits, pilot information, infrastructure publications) Dual Threshold Ops (DTOP) (flexible rwy usage to reduce wake effects) Awareness campaigns (pilot meetings, flight experience, tower visits, joint events) Comprehensive approach to ALL capacity- influencing components (don’t ignore capacity elements next in sequence)

Short and medium term actions Development of an incentive/penalty system for adherence to schedules in agreement between Airport, Airspace Users and ATC Development of a masterplan for airport capacity. Required capacity to be determined by regarding available airspace, runways, apron, taxiways, stands and gates Define the capacity per item and identify the bottlenecks Determine the current maximum capacity over all aspects Identify measures to increase the entire capacity The implementation of a separate Apron Control unit should be investigated, depending on complexity of infrastructure and traffic density Stakeholders will have to be convinced that procedural adherence is an advantage to all

Conclusion More efficient use of airspace will demand more from airports in terms of capacity, therefore … Increased capacity in the sky must be accompanied by increased capacity on the ground, if the fruits of the ICAO Concept are to be maximised The role of an airport operator is to provide adequate infrastructure to respond to market demand Airport operators must be given the possibility to achieve this goal, on a level playing field with other modes of transport Airport operators are committed to undertake any justified initiative to ensure the highest safety standards, and to minimise the environmental impact of civil aviation ACI has published its position regarding capacity, efficiency, safety in the Policy Handbook, downloadable from www.aci.aero under “publications” ACI is pro-actively pursuing joint optimisation approaches: FSF, IATA, IFALPA, ACI (on Rwy safety) or ACI and IATA (on airport capacity/demand management)

THANK YOU Any questions? Contact us ACI World Headquarters PO Box 16 1215 GENEVA 15 Airport SWITZERLAND Tel: +41 22 717 8585 Fax: +41 22 717 8888 E-mail: aci@aci.aero www.aci.aero