Gasunie ranks among the largest gas infrastructure companies in Europe

Slides:



Advertisements
Similar presentations
Hazardous Substances. Employer’s Responsibility Every employer has a duty to ensure that their employees and others are not exposed to risks to their.
Advertisements

Chapter 24 Solid and Hazardous Wastes
RG - OFFICER Eng.Essam Hegab Environmental Health and Safety Manager.
Environmental Permitting Regulations Tom Fowler – Environment Officer
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
EU focus on waste management. European waste management is particularly challenging: environmental protection must be achieved without distroying the.
Reduce, Reuse, and Recycle. Preventing and Reducing Pollution  Human activity is responsible for much of the world’s pollution  Humans can also do much.
Waste Chapter 19.
Solid Domestic Waste By: Laya Bataineh & Yousser Louhaichi.
Solid & Hazardous Wastes. Domestic Waste  38 % Paper  18% Yard waste  8% Metals  8% Plastic (20% by volume)  7% Glass  7% Food  14% Miscellaneous.
. Integrated Science C Mrs. Brostrom.  Objective: Explain short term and long term impacts of landfills and incineration of waste materials on the quality.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Solid Waste In the US 98.5% of the solid waste comes from mining, oil production, agriculture, sewage sludge, and industry The remaining 1.5% is municipal.
Gasunie ranks among the largest gas infrastructure companies in Europe. Safety is a top priority within Gasunie; it forms the basis of our “licence to.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
DRAFT REGULATIONS ON END-OF-LIFE VEHICLES Public Consultation Waste Management Unit Malta Environment & Planning Authority (MEPA) End-of-Life Vehicles.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Gasunie is one of the major gas infrastructure companies in Europe. Safety has the highest priority within Gasunie; it forms the basis of our ‘licence.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Gasunie ranks among the largest gas infrastructure companies in Europe. Safety is a top priority within Gasunie; it forms the basis of our “licence to.
Hazardous Wastes. Hazardous waste discarded solid waste/liquid material - contains 1 or more of listed 39 compounds, catches fire easily, explosive, corrosive.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. CHAPTER.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Lecture (11): Waste Recycling
Automotive Engines Theory and Servicing
Chapter Nineteen: Waste
Waste Generation and Waste Disposal
Control of Waste.
storage and External Transportation
Gasunie is one of the biggest gas infrastructure companies in Europe
Gasunie is one of the biggest gas infrastructure companies in Europe
Waste Generation and Waste Disposal
Regional Workshop on e-waste
Waste Minimisation and New Developments in Recycling
Waste management trash, recyclables, hazardous waste, nuclear waste, e-waste, biological waste, . . .
Average person produces 1700 lbs of MSW per year
Solid Waste.
BY: All Purpose Clean Up All Purpose Clean Up1.
Resource Conservation and Recovery Act (RCRA)
Gasunie is one of the biggest gas infrastructure companies in Europe
SHE Code 41: ‘Controlling Pollution to Air, Water or Land’
Classroom Catalyst.
Environmental Awareness Training
SHE Code 31: Controlled and Hazardous Waste
Hazardous Waste Any waste that is a risk to the health of humans or other living things Solids, liquids, and gases Often contain toxic, corrosive, or.
Waste Disposal / Zero Waste to Landfill
Waste Generation and Waste Disposal
Waste Generation and Waste Disposal
Gasunie is one of the biggest gas infrastructure companies in Europe
Our Impact on the Pedosphere
Waste Generation and Waste Disposal
Waste Generation and Waste Disposal
Effects of the point of measurement on the comparability of the data on waste treatment Methods of data compilation and the effects on the comparability.
Dealing with Waste Ad Qual Castech Ltd..
LAND POLLUTION.
Welcome To Our Presentation 1. Topic Name Transfer Stations and Transport, Ultimate Disposal Methods 2.
Hazardous Waste.
Municipal Solid Wastes
Waste Generation and Waste Disposal
Waste Generation and Waste Disposal
Food Safety T-1150 This work has been produced by DGL (Aust) Pty Ltd
Waste Generation and Waste Disposal
Solid and Hazardous Waste Chapter 21
SOLID WASTE MANAGEMENT PRINCIPLES
Waste Generation and Waste Disposal
Waste Generation and Waste Disposal
Automotive Engines Theory and Servicing
Presentation transcript:

Gasunie ranks among the largest gas infrastructure companies in Europe Gasunie ranks among the largest gas infrastructure companies in Europe. Safety is a top priority within Gasunie; it forms the basis of our “licence to operate”. We apply the most stringent health, safety and environmental standards in respect of our employees and our contractors. It goes without saying that Gasunie’s safety policy, characterised by a proactive approach to the prevention of accidents, incidents and hazardous situations, also applies to waste products.

What is waste? Every year as Gasunie we produce approximately 19,000 tons of waste. Of this waste, approximately 3,000 tons can be classified as hazardous waste. That is quite a mountain, but what is actually waste? In fact there is no such thing as waste, because what is waste to one person is a raw material to another person. However, in general, we can say that anything you want to get rid of can be classed as waste. Generally these are not useless residues, and some parts of the waste can be very valuable and often suitable for reuse. At Gasunie we also encourage conservation and improvement of environmental quality and this is how we make a contribution to sustainable development.

Gasunie applies the following order of priorities with regard to waste processing, which is known as “Lansink’s ladder”: Prevention: preventing waste production. Reuse: separating waste as carefully as possible so that the products and residues can be reused. 3. Recycling: making new products from residues, e.g. paper. 4. Combustion: thermal processing (with energy recovery) if reuse or recycling is not possible. 5. Landfill: if combustion is not possible or permitted, the waste will be sent for landfill, e.g. items containing asbestos.

Waste collection and processing At Gasunie we have three separate framework contracts with service providers for the disposal of waste and residues: Reym: all liquid waste streams such as glycol/water, contaminated waste water, cleaning residue and natural gas condensate. The liquid waste streams are processed at ATM in Moerdijk. Oosterhof Holman: all building materials such as polluted soil and gravel. Envirion (from Gansewinkel): all remaining (hazardous) waste and residues. The following basic principles are applied to waste collection and processing: All waste streams emanating from Gasunie are removed by these three parties exclusively. Waste substances are reported and registered on the basis of the European waste codes (known as Euralcodes). Reporting waste to the authorities and registering Euralcodes and waste stream numbers has been contracted out by Gasunie to the aforementioned service providers.

Due to Gasunie’s statutory obligations as a disposer of waste, the company provides details of waste substances every year in an environmental report submitted to the government. No waste may be stored at Gasunie locations other than waste that has been collected and made ready for transport. Waste substances and residues must be properly wrapped and correctly labelled before they may be transported. The removal of waste shall only be performed by the aforementioned transporters and care shall be taken at all times to ensure that the correct papers are present. Contaminated waste substances shall never be incinerated or stored (permanently) in the ground. Special waste collection points are set up at all Gasunie installations and office locations and at Gasunie projects. All Gasunie’s waste shall be collected in separate containers at these points, for example: metal, wood, building waste, hazardous substances, oil residues and batteries.

Special types of waste Small hazardous waste (SHW) Asbestos This is waste containing chemical substances that are harmful to health and the environment, for example, lead, mercury, cadmium, chromium or organic solvents. When these substances are burned, they pollute the air and when they are landfilled, they pollute the groundwater. That is why these waste streams must be collected separately to other substances. Asbestos If there is any doubt about the presence of asbestos, an asbestos inventory must be taken by Envirion. Individuals must not take samples themselves! Asbestos often occurs at Gasunie in bitumen coating and packaging containing asbestos. These two exceptions to the rule may be removed by Gasunie itself in accordance with a simplified procedure (Class I), without an inventory report, but subject to strict conditions. Waste substances containing asbestos may not be reused but must be clearly labelled, packaged in thick double plastic and landfilled. When transporting gas pipes with a bitumen coating containing asbestos, the sawn-off ends and damaged parts must be tightly covered up/taped up so that they will never give off asbestos emissions into the open air.

Radioactive waste (LSA) Radioactive waste can be released when opening pipelines and installation sections in the high-pressure transport system. This can be established by measurements taken by a radiation expert. As well as being radioactive, this waste may also be contaminated with mercury. Radioactive contaminated waste must always be removed following consultation with the radiation expert from the Safety department. Cables and scrap All cupriferous cables and steel residues are collected separately due to their high resale value. The conditions for sale are that they are accompanied by as little contamination as possible, otherwise a “contamination deduction” is applied to the price.

Natural gas condensate Natural gas condensate consists of liquid hydrocarbons that may be released as natural gas is being produced during the treatment process. This liquid must be removed from the transport network in order to prevent damage to control instruments and other equipment. The Gasunie transport system contains 1200 liquid containment facilities built in for this purpose. These facilities are drained regularly every year. These regular draining exercises are carried out by Reym on a contract basis with natural gas condensate wagons specially developed for this purpose. Oil Oil and products containing oil must be stored in a separate storage space with bunded floors and sufficient containment facilities to prevent possible leaks. All vats must also be provided with the correct labels regarding content and hazard class.

Blasting grit Contaminated blasting grit can be removed by Envirion. It is also possible that the company performing the blasting will remove the (contaminated) blasting grit itself for recycling or making it suitable for reuse. In these cases, Gasunie is not the disposer of waste. This must be clearly agreed in advance in order to prevent incorrect registration of the waste streams.