Information To support CEAF Increase of Thermostat Temperatures on Euro VI Products (EC9108, EC9045, EC9076, EC9080),(D0F3008BX03, D0F3012BX03, D0P3001BX03,

Slides:



Advertisements
Similar presentations
Contents Operating Conditions and drivers for lubricant requirements
Advertisements

ENGINES, TRANSMISSIONS, FINAL DRIVES, TRAVEL/SWING MOTORS & HYDRAULICS: IMPROVE LIFE BY 2X TO 3X STRATEGIES TO INCREASE LIFE OF COMPONENTS AND EQUIPMENT.
GM Diesel Technology Charles E. Freese V Executive Director, Diesel Engineering General Motors Corporation.
Learning intentions That organic chemistry is the chemistry of carbon That alkanes are a homologous series of hydrocarbons with a general formula C n H.
EPA Tier 4 / EU Stage IV - Technical Overview Sept 2009.
SIZING MODELS AND PERFORMANCE ANALYSIS OF WASTE HEAT RECOVERY ORGANIC RANKINE CYCLES FOR HEAVY DUTY TRUCKS (HDT) Ludovic GUILLAUME 1 & co-workers : A.
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Univ logo Control algorithms for optimisation of engine combustion process with continuously changing fuel composition By KinYip Chan Supervised by Prof.
Global Lubricants © 2009 Chevron Corporation 7/20/09 G090254_August2009_Jobbers Copyright 2009 Chevron Global Lubricants, a division of Chevron U.S.A.
Part Five, Issue 12 Motor Vehicles and the Environment.
1 Bernardo MARTÍNEZ Automotive Industry Unit Transposition of EURO VI requirements into UN/ECE R49 GRPE January 2012 Submitted.
WEEK 1 You have 10 seconds to name…
Comparison Of cucumber plots from transplanting to harvest Location: Shaki Farm– Achituv Company: Hydrological Israel Date: 23/5/2013 May 2013 Hydrological.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Date of download: 6/2/2016 Copyright © ASME. All rights reserved. From: Comparison of Filter Smoke Number and Elemental Carbon Mass From Partially Premixed.
Date of download: 6/23/2016 Copyright © ASME. All rights reserved. From: Project ABSOLUTE: A ZEBRA Battery/Intermediate Temperature Solid Oxide Fuel Cell.
ECO 372 Week 3 DQ 3 What is the difference between contractionary and expansionary monetary policy? What is the intention of each policy under a depression,
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
Single Module Vertical Outlet Tube Change
New Turbocharger Plumbing Oil Drain Connection for QSB6.7 T3
ArcPIC2D update: Arc spreading through flat emission Kyrre N
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
2017 X15 Turbo Compressor Cover V-band Clamp Reorientation
L9 E6 OBD Phase C Product Update
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Information to Support CEAF: ISL Euro3 WWCP V Software Update
Information to Support CEAF: New Software release for ISB and ISL Euro 4 and 5 Products Lisa Ferguson Cummins Confidential.
Implementation of bolt spacers to the oil cooler hardware
2017 X15 EH Bracket Machining Change
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
City Statistics Illustrated
Objectives AHU processes - HW2 Cooling cycles.
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Off-Highway Diagnostic Improvement Project
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Oil Pans with Full Circumference Clamping Plates for ISB6
Sticker Label Location Change on UL2 Supply Module
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
EDLC(Embedded system Development Life Cycle ).
Statistical Atlas to accompany the Eurostat Regional Yearbook 2012
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
EGTS CAL ID Update Cummins Confidential CEAF Type: Change Notification
Countries that Ratified the Paris Agreement, August 2017
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Updated Power on Indicator Lamp from J1-76 to J2-07 in CM2350 Beta Wiring Diagram (B6.7/L9 Stage V) 5/30/2017.
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
L9 and B6.7 Component ID Change All options - D313029BX03 (B 2017) All options - D563025BX03 (L 2017) Mike Langevin 3/9/2017.
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Thing / Person:____________________ Dates:_________________
PLAN-DO-STUDY-ACT (PDSA) WORKSHEET
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Objectives Processes in Cooling towers and AHUs.
2010 Heavy Duty OBD Overview
Presentation transcript:

Information To support CEAF Increase of Thermostat Temperatures on Euro VI Products (EC9108, EC9045, EC9076, EC9080),(D0F3008BX03, D0F3012BX03, D0P3001BX03, D0P3002BX03, D313017BX03, D313031BX03, D563018BX03, D563025BX03) Date Week 47 2016

Project Scope Change Summary: Background: Increase of thermostat nominal temperature on all Euro VI products Background: The intention of the change is to improve fuel economy, fuel evaporation rate from oil and robustness to soot amalgamation in the EGR loop. Implementation Strategy and Date: Implementation strategy would be to prioritise the Euro VI B series products followed by the L

Change Summary The parts will be visibly the same but the control functionality will be different. This plot shows a duty cycle comparison of a standard thermostat to a higher nominal operating temperature thermostat.

Overlay of New option(xx) & Old option(EC9108, EC9045, EC9076, EC9080)