A Silicon-Tungsten ECal for the SiD Concept

Slides:



Advertisements
Similar presentations
A MAPS-based readout of an electromagnetic calorimeter for the ILC Nigel Watson (Birmingham Univ.) Motivation Physics simulations Sensor simulations Testing.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
7 January 2005 MDI Workshop M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V.
R Frey 9/15/20031 Si/W ECal Update Outline Progress on silicon and tungsten Progress on readout electronics EGS4 v Geant4 Ray Frey M. Breidenbach, D. Freytag,
7 June 2006 SLAC DOE Review M. Breidenbach 1 KPiX & EMCal SLAC –D. Freytag –G. Haller –R. Herbst –T. Nelson –mb Oregon –J. Brau –R. Frey –D. Strom BNL.
Design Considerations for a Si/W EM Cal. at a Linear Collider M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator.
R Frey ESTB20111 Silicon-Tungsten Electromagnetic Calorimeter R&D Collaboration M. Breidenbach, D. Freytag, N. Graf, R. Herbst, G. Haller, J. Jaros, T.
NIU Workshop R. Frey1 Reconstruction Issues for Silicon/Tungsten ECal R. Frey U. Oregon NIU Workshop, Nov 8, 2002.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
ICLC Paris R. Frey1 Silicon/Tungsten ECal for SiD – Status and Progress Ray Frey University of Oregon ICLC Paris, April 22, 2004 Overview (brief) Current.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
LCWS2002 R. Frey1 Silicon/Tungsten ECal for the SD Detector M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator Center.
ITBW07 R. Frey1 ECal with Integrated Electronics Ray Frey, U of Oregon Ongoing R&D Efforts: CALICE silicon-tungsten ECal – 2 parallel efforts:  Technology.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
R Frey SiD at SLAC1 SiD ECal overview Physics (brief) Proposed technical solutions: silicon/tungsten  “traditional” Si sensors  MAPS Progress and Status.
KPiX - An Array of Self Triggered Charge Sensitive Cells Generating Digital Time and Amplitude Information Presented by Dietrich Freytag Stanford Linear.
1 Si-W ECal with Integrated Readout Mani Tripathi University of California, Davis LCWS08 Chicago Nov 17, 2008.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
1 LumiCal Optimization and Design Takashi Maruyama SLAC SiD Workshop, Boulder, September 18, 2008.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Silicon-Tungsten EM Calorimeter R&D
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Development of a Particle Flow Algorithms (PFA) at Argonne Presented by Lei Xia ANL - HEP.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
R Frey SiD ECal at ALCPG071 SiD ECal overview Physics requirements Proposed technical solutions: silicon/tungsten  “traditional” Si diodes  MAPS LOI.
1 R&D Advances: SiW Calorimeter LCWS 2010 Beijing SiD Concept Meeting March 28, 2010 John Jaros for SiD SiW Group (thanks to Ray, Ryan, Mani, and Marco.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
R Frey LCWS071 A Silicon-Tungsten ECal with Integrated Electronics for the ILC -- status Currently optimized for the SiD concept Baseline configuration:
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
EMCal Sensor Status (* M. Breidenbach*,
Silicon/Tungsten ECal for the SD Detector – Status and Progress R. Frey U. Oregon UT Arlington, Jan 10, 2003.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
1 LoI FCAL Takashi Maruyama SLAC SiD Workshop, SLAC, March 2-4, 2009 Contributors: SLAC M. BreidenbachFNALW. Cooper G. Haller K. Krempetz T. MarkiewiczBNLW.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
A Forward Calorimeter (FoCal) as upgrade for the ALICE experiment at CERN S. Muhuri a, M. Reicher b and T. Tsuji c a Variable Energy Cyclotron Centre,
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
FCAL Takashi Maruyama SLAC SiD Workshop, 15 – 17 November, 2010, Eugene, Oregon.
Hadrons in a SiW Electromagnetic Calorimeter for a Future Linear Collider Roman Pöschl LAL Orsay LHC EUDET Annual Meeting DESY Hamburg September/October.
Thick-GEM sampling element for DHCAL: First beam tests & more
SiD R&D Plan and Opportunities for New Collaborators
CEPC 数字强子量能器读出电子学预研进展
SiD Calorimeter R&D Collaboration
The ECal in the SiD LOI Overview of status and progress
A SiW EM Calorimeter for the Silicon Detector
IHEP group Shashlyk activity towards TDR
detector development readout electronics interconnects bump bonding
Calorimetry for a CLIC experiment
LCDRD ECal R&D Physics goals drive the design
SiD Electronic Concepts
Simulation study for Forward Calorimeter in LHC-ALICE experiment
Argonne National Laboratory
SiD Tracker Concepts M. Breidenbach
Detector Optimization using Particle Flow Algorithm
Signal processing for High Granularity Calorimeter
Dual readout calorimeter for CepC
Michele Faucci Giannelli
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
LC Calorimeter Testbeam Requirements
Some EGS Studies… Compare with Geant4 Questions of range/cutoff
Presentation transcript:

A Silicon-Tungsten ECal for the SiD Concept Baseline configuration: transverse segmentation: 12 mm2 pixels longitudinal: (20 x 5/7 X0) + (10 x 10/7 X0)  17%/sqrt(E) 1 mm readout gaps  13 mm effective Moliere radius BILCW07

“U.S.” Si-W ECal R&D Collaboration KPiX readout chip downstream readout detector, cable development mechanical design and integration detector development readout electronics cable development bump bonding M. Breidenbach, D. Freytag, N. Graf, G. Haller, R. Herbst, J. Jaros Stanford Linear Accelerator Center J. Brau, R. Frey, D. Strom, M. Robinson, A.Tubman U. Oregon V. Radeka Brookhaven National Lab B. Holbrook, R. Lander, M. Tripathi UC Davis Y. Karyotakis LAPP Annecy BILCW07

Goal of this R&D Design a practical ECal which (1) meets (or exceeds) the physics requirements (2) with a technology that would actually work at the ILC. The physics case implies a highly segmented “imaging calorimeter” with modest EM energy resolution  Si-W The key to making this practical is a highly integrated electronic readout: readout channel count = pixel count / 1000 requires low power budget (passive cooling) must handle the large dynamic range of energy depositions (few thousand) with excellent S/N This takes some time to develop (getting close). Testing in beams will be crucial (major test in 2008). BILCW07

“Imaging Calorimeters” A highly segmented ECal is an integral part of the overall detector particle reconstruction and tracking (charged and neutrals) o in SiD BILCW07

Segmentation requirement In general, we wish to resolve individual photons in jets, tau decays, etc. The resolving power depends on Moliere radius and segmentation. We want segmentation significantly smaller than Rm Two EM-shower separability in LEP data with the OPAL Si-W LumCal (David Strom) BILCW07

Silicon detector layout and segmentation Silicon is easily segmented KPiX readout chip is designed for 12 mm2 pixels (1024 pixels for 6 inch wafer) Cost nearly independent of seg. Limit on seg. from chip power (2 mm2 ) (KPiX) Fully functional prototype (Hamamatsu)

EM Energy Resolution Requirement for jet energy resolution in PFAs is modest for EM:  0.20/sqrt(E) There is no known strong physics argument for excellent EM energy resolution.  Our current design provides moderate resolution: 0.17/sqrt(E) However, it is useful to know how to “dial in” different resolutions, if needed. Lines of constant resolution 1 GeV photons Dependence on Si thickness due to straggling. BILCW07

Simulation Results For a simple W-Si sampling calorimeter, the energy resolution is given by: Doubling silicon thickness to 600μm would reduce resolution by 1.8% Decreasing tungsten thickness by 5% would reduce resolution by 1.4% Would like to see some of this space explored in testbeam: Ideally with wafers of different thicknesses. Could also use thick silicon and vary effective sensitive thickness (depletion depth) with bias voltage (cf. SICAPO). BILCW07

Critical parameter for RM is the gap between layers BILCW07

US Si-W readout gap schematic cross section Metallization on detector from KPix to cable Bump Bonds Tungsten Kapton Data (digital) Cable KPix Si Detector Kapton Tungsten Heat Flow Thermal conduction adhesive Gap  1 mm BILCW07

Conceptual Schematic – Not to any scale!!! Data Concentrator “Longitudinal” Data Cable “Transverse” Data Cable Readout Chip “KPix” Detectors Locating Pins Tungsten Radiator ~ 1m BILCW07

KPiX chip One channel of 1024 Dynamic gain select 13 bit A/D Si pixel Storage until end of train. Pipeline depth presently is 4 Leakage current subtraction Event trigger calibration BILCW07

KPiX Cell 1 of 1024 64-channel prototypes: v1 delivered March 2006 v4 delivered Jan 16, 2007 It’s a complicated beast – may need a v5 before going to the full 1024-channel chip ? BILCW07

Dynamic Range KPiX-2 prototype on the test bench 1 MIP (4 fC) Max signal: 500 GeV electron BILCW07

Saturation Simulation MPV ~ 0.0001 Energy deposited in 3.5 x 3.5 mm2 EM calorimeter cells by muons at normal incidence Energy deposited in 3.5 x 3.5 mm2 EM calorimeter cells by 500GeV photons at normal incidence. ~2000 MIP log(counts) 0.00 0.20 BILCW07

Simulation Results Saturation, even for highest energy electromagnetic showers (Bhabhas at a 1 TeV machine), is not a problem with the default design of 3.5 x 3.5 mm2 cells read out using the KPiX chip. BILCW07

Power Pulsing Switch off KPiX analog front-end power between bunch trains (1% duty cycle) Average power of 18 mW per channel passive-only cooling should be OK BILCW07

prototype Si detector studies BILCW07

v2 Si detector – for full-depth test module 6 inch wafer 1024 12 mm2 pixels Allows for topside bias Vertices removed for spacers Trace layout minimizes Cmax Uses thinner traces near KPiX Low resistance power and ground connections ready to go except for funding BILCW07

R&D Milestones  pending funding Connect (bump bond) prototype KPiX to prototype detector with associated readout cables, etc Would benefit from test beam (SLAC?) - 2007 A “technical” test Fabricate a full-depth ECal module with detectors and KPiX-1024 readout * – functionally equivalent to the real detector Determine EM response in test beam – 2008 Ideally a clean 1-30 GeV electron beam (SLAC?) Test with an HCal module in hadron test beam (FNAL?) – 2008-? Test/calibrate the hadron shower simulations; measure response Pre-assembly tests of actual ECal modules in beam – >2010  pending funding BILCW07

Summary The R&D leading to an “ILC-ready” Si-W ECal technology is progressing well. There are no show-stoppers for meeting the demanding physics and technical requirements. This effort depends crucially on highly integrated readout electronics (KPiX) This Si-W R&D should result in full-depth modules which will require test beam evaluation Our Si-W module (30 layers x 16cm x 16cm) - 2008* These highly segmented, analog devices should provide an interesting test for simulation modeling of (early developing) hadron showers. BILCW07