Planning Quality control - Manufacturing logbook Photos Conclusions

Slides:



Advertisements
Similar presentations
Lim Sei cK. a) Business profile b) Description of business c) Description of product(s) / service(s) d) Human Resource Management e) Products and.
Advertisements

LHC Ring Collimation – Overview – R. Assmann, AB/ABP for the LHC Collimation Project.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
RWA, 15/6/ R. Assmann, AB LHC MAC June 15 th, 2007 Collimation System Update.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Work required to have a proposal in June (for discussion) RA, CPM, 15/4/03.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 New Product Introduction: Life Cycle Phases Team Members: Our names date Solar Plus.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Review of Mechanical Movement and Motorization for LHC Collimators The LHC Collimation project LHC Collimators for Phase 1 Alessandro Bertarelli.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Chamonix XV - V.Vuillemin / TS-MME 1 MME TS-MME Workpackages Beam Instrumentation Collimators.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
MMT Retreat Technical Services across ESS Peter Rådahl
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Crab Cavity Technical Coordination meeting:
Cryostats for superconducting magnets
News and Introduction from CERN June 15th, 2005
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Brief Status SPS Prototype PSB Prototype Installed in LS1
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
LIU Wire Scanner Milestones June 2017
LARP Phase II Secondary Collimator RC1
Chamonix XV - V.Vuillemin / TS-MME
Review on collimator movement with stepping motors
Impact of TIDVG problem on LSS5 dump design schedule
ISUAL Product Assurance
Renovation of the 45-year old PS magnets
Planned activities on collimator for LS1
Collimator Production and Installation
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
Mauro Morandin & Antoine Daël
WP-73 TDR ART Review Report: Hard X-Ray Monochromator
2th EuCard Col/Mat WP Meeting
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Review on collimator movement with stepping motors
Phase II Collimators : design status
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
LARP Rotatable Collimators for LHC Phase II Collimation
Target collaboratin Board Meeting
Wednesday June 30,  40-S2-A01 (open session)
Installation of Photon Beam Transport to FEH
LARP Phase II Secondary Collimator RC-0 and RC-1
Extraction Michael Bevins May 17, 2007
East Hall under construction
Presentation transcript:

Planning Quality control - Manufacturing logbook Photos Conclusions 2 PROTOTYPES FOR SPS - OUTLINE Planning Quality control - Manufacturing logbook Photos Conclusions 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

2 PROTOTYPES FOR SPS -MANUFACTURING Planning – production – installation Very detailed planning established at the start of the manufacturing drawings Including ALL operations - on a daily basis TOTAL: 123 days until installation 18.08.04 8:00h This included: Design, stores, workshop, brazing, metrology, lab for thermal measurements, assembly, pressure test, vacuum test, electro beam-welding, bakeout equipment, calibration, test of moving mechanism Space requirements in SPS, safety - radiation installation logistics, transport ON TIME within less than 5 days 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

2 PROTOTYPES FOR SPS MANUFACTURING Quality control - Manufacturing logbook Record non-conformities Record dimensional measurements Record reference measurements for final alignment in SPS Time of operations for estimation of series production - will serve as an example for industry Photos 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME CONCLUSIONS The mechanical design remains close to the LEP collimators BUT high beam energy requires carbon and very efficient cooling - new jaws design Extensive thermo-mechanical analyses predict that the requested 25 μm should be possible but not proven yet… prototype manufactured on standard machines Temperature measurements confirm thermal calculations Prototype design finished, series design started 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME CONCLUSIONS – next steps Manufacture of three prototypes according to schedule, two for the SPS – one for tests Installation date in sight Market survey for series production launched Many different versions ( TCP, TCS, TCT, TCLI, TCLP, TCHS, TCDI ) with different angles “Standardisation” of different types of collimators will require considerable design effort ( one motor, two motors, plug-in, spares ) Special types with two beams in the same tank need still to be studied in detail 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

KEEP THE MOMENTUM GOING Re-enforce the design team FINAL REMARKS Next “Milestone” drawings for tender of part of the series - end of August lot of work still ahead! KEEP THE MOMENTUM GOING Re-enforce the design team TO MEET THE DEADLINE OF THE FINANCE COMMITTEE BY THE END OF THE YEAR 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME