Joseph P. Curro, PE, BCEE Principal Engineer

Slides:



Advertisements
Similar presentations
Introduction Future Steel Buildings offer great value due to their truss-free design which ensures 100% usable interior space. They are based on the strongest.
Advertisements

PLATEPRO PHOTOPOLYMER PLATEPRO PHOTOPOLYMER Pre-wash The Photopolymer+CTP plate processor has an integrated Pre-heat and Pre-wash system. The plate processors.
BERG SEMINAR February 2009 RUNNABILITY TECHNOLOGY FOR PAPER MACHINE PRESS SECTION AND SINGLE FELTED DRYING SECTION BERG SEMINAR February 2009.
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
Renewable Energy Project at the Alton landfill site in Richards bay. By Ener·G Systems uMhlathuze (PTY) LTD.
Fluid Mechanics 07.
FrontPower FRONT PTO 540 RPM or 1000 RPM
LANDFILL PROFILING FOR GAS, LIQUIDS AND VACUUM & ENHANCED STEAM BIOREACTORS STI Engineering By Reg Renaud.
Reciprocating Compressor Seals Partner Savings From Compressor Rod Packing Presented to 2005 EPA Star Conference - Midland June 8, 2005 Jim Rauh, Compressor.
Reconstruction of the Eads Bridge Highway Deck
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reactors The Case of the Chlorine Contact Tank.
GeoMat™ Flat Leaching System Installation Manufactured under one or more of the following U.S. Patents; 7,351,005, 7,309,434,
THE WASHINGTON MONUMENT (1884) The purpose of this study is to show how this structure supports its own weight and wind load, by calculating its efficiency.
1 Feel free to contact us at
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Radon Overview Reducing Radon in a Home. Learning Outcomes Upon completion of this module you will be able to:  Recall the most common method to reduce.
Solar Energy Systems in the Eco-Village at the University of Manitoba
Company Reported Opportunities Technologies From Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and Pioneer.
Fluid Bed Reactors Chapter (Not in book) CH EN 4393 Terry A. Ring.
EnE 301: ENVIRONMENTAL ENGINEERING
Pavement Analysis and Design
Problem: surface ponding. Solution: surface or subsurface drainage.
Example (a) What head is supplied to the turbine when Q = 8 ft3/s?
SESSION 4 Drainage Design Considerations. Objectives  Identify types of subsurface drainage  Determine need for subsurface drainage  Recognize importance.
Landfills Part 1. There are 3,091 active sanitary landfills in the U.S. and over 10,000 old municipal landfills - also called rubbish pits or dumps.
 Friction – force that opposes motion  Caused by microscopic irregularities of a surface  The friction force is the force exerted by a surface as an.
Methane Emission Reductions from Reciprocating Compressors
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
Scientific Method Drill: What are the steps of the Scientific Method?
Waste to Energy Incinerator, High Temperature Fume Incinerators – HTT HiTemp Technology Corporation (HTT) is a leading designer and manufacturer of waste.
Track and Trace Systems Track and trace systems is a comprehensive solution for the pharmaceutical industries in protection against counterfeit, ensures.
Packaging Material Supplier in Dubai Buy Storage Boxes, Moving and Packing Materials in Dubai.
Air conditioning is a combination of activities such as conditioning the air i.e., heating or cooling, ensuring air.
Chapter 3 Well Completions. Two basic types: Open Hole Perforated Casing.
J.PRATHYUSHAG.TEJASRI DEPARTMENT OF CIVIL ENGINEERING.
Four Ways To Speed Up The Rate Of Dissolving:. 1-Stirring.
Biogas Process Control and Automation. Anaerobic Digestion Anaerobic means without Oxygen Occurs at 38 degrees C Produces a combustible gas called biogas.
Resin line.
CENTIFUGAL PUMP OPERATION
Solar Water heating System information card
Using 138T Standing Seam Metal Roof in Shingle Recover Application
Making use of Energy lesson 8
TECHNICAL SPECIFICATION AND REQUIREMENTS
Factors affecting solubility& factors affecting rate of reaction
AIR CIRCUIT BREAKER.
Low Volume Non-Standard Shipments Packaging Requirements
Dive Projects 2063 Paxton Street Harvey, LA 70058
GrainPro® TranSafeliner™
If you are not able to implement the solutions offered by tutorial both written and video, you can contact quicken customer support team. You can get plenty.
Oasis Well Screens Wire Wrapped Water Well Strainer Screens are made by winding cold-rolled wire, approximately triangular in cross section, around a circular.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Abandoned Wells Are a Threat to Our Personal Safety and Water Supply
Layer Thickness and Map Width
Raleigh County Solid Waste Authority
Drainage Practices.
Flag Installation on Roll-up Signs
Flag Installation on Roll-up Signs
New Oil and Gas Drilling and Production Technologies
Use the substitution method to find all solutions of the system of equations {image} Choose the answer from the following: (10, 2) (2, 10) (5, - 2) ( -
A GIANT STEP FORWARD FOR SUBSEA PIPE AND STRUCTURAL REPAIR
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Bernoulli’s Principle
6 8 5 Energy Breakout Solutions 750 J 1500 W 225 N 2700 J
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Fluid Components for Small, Smart, Sampling Systems
Fittings and its Professional Use
Scavenger Hunt Solutions
The No.1 Soil Management Solution in Ottawa
Review of Alka Seltzer Lab
Presentation transcript:

Joseph P. Curro, PE, BCEE Principal Engineer Elimination of Positive Pressure Under a Landfill Cap Using Flat, Corrugated, Perforated Collector Piping Boston, MA

Quantification of problem Cap bubbling Positive pressure under cap Dead grass Elevated surface emissions Odors – high H2S gas Cap material overlap – not sealed

Remediation plan Locate extent of problem Determine best solution Horizontal gas collector Choose from collector types Flat, corrugated, perforated pipe Cap modification/repairs

Flat, corrugated, perforated pipe Panel pipe Filter fabric wrapped Supplied in a roll Large width / contact surface Structural strength Ease of installation No stone pack required

Conclusions Problem-free implementation Speed of installation Minimal disruption / odors Thriving grass Low surface methane emissions Reasonable cost Success!