Informal document GRPE-74-20

Slides:



Advertisements
Similar presentations
Amendment procedures of the 1958 Agreement (Draft Revision 3) 1958 Agreement including its Appendix Art. 13: Amendments to the Agreement and its Appendix.
Advertisements

Informal document GRPE st GRPE, 8-12 June 2015,
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 69 Geneva, 05 June 2014 Informal document No. GRPE (69th GRPE,
Informal document GRPE (69th GRPE, 5 – 6 June 2014, agenda item 3(a))
Draft progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by chair of IWG AECS Informal document GRSG-106-ХХ 106.
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Transposition of EURO VI requirements into UN/ECE R49 Status report GRPE 9-June 2011 Submitted by the expert of European Commission 1 Informal document.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
Informal document No. GRPE (72nd GRPE, January 2016,
Report to 169 th WP.29 session from the 21 st IWVTA Informal Group meeting Transmitted by the IWVTA Informal Group informal document WP , (169th.
Possible implementation of WLTP into a UN Regulation WP.29 Secretariat Informal document GRPE rd GRPE, 6-10 June 2016, agenda item 3(b)
Document No. WLTP-17-14e (WLTP IWG #17 – Geneva January 2017 )
Transmitted by the Co-Chairs of IWVTA Informal Group
Working Party on Noise (GRB) General information and WP.29 highlights
Informal document GRE-77-18
1st Informal Group on WLTP Palais des Nations, Geneva
Simplification of Lighting and Light-Signalling Regulations
Review of the 1958 Agreement
UNR116 splitting Informal document GRSG
Note by the secretariat
Note by the secretariat
WLTP Informal Working Group
Informal document GRE-74-13
Informal document GRPE-76-24
Informal document GRPE-75-18
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Development of Amendment # 2 to UN GTR No. 16 on Tyres
Informal document GRPE-77-21
Transmitted by the IWVTA Informal Group
Working Party on General Safety Provisions (GRSG) General information
PN Levels in UN Regulation N°83.07
Working Party on General Safety Provisions (GRSG) General information
Note by the secretariat
VIAQ (Vehicle Interior Air Quality) Informal Working Group
Submitted by the experts of OICA
Informal document GRPE-78-14
IWVTA-GRPE Ambassador
Simplification of Lighting and Light-Signalling Regulations
Informal document GRPE Rev.1
Transmitted by the IWVTA Informal Group
Commission position on the introduction of CoP provisions for WLTP
Working Party on Noise (GRB) General information and WP.29 highlights
WLTP-24-03e_UNR WLTP IWG 24th Session 18th -20th September 2018, Tokyo, Japan Update from WLTP Transposition Task Force September.
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Participants/Address list
Exchange of information with the WP.29 secretariat
Informal document GRE-79-15
Informal document GRE-81-15
Simplification of Lighting and Light-Signalling Regulations
Working Party on General Safety Provisions (GRSG) General information
Review of the 1958 Agreement
Informal document GRE-76-02
Working Party on General Safety Provisions (GRSG) General information
Note by the secretariat
Transmitted by the IWVTA Informal Group
Request to GRPE for Approval of Prolongation of Mandate and
Informal document GRPE-79-19
Status Report Cop Taskforce
Highlights of the 177th WP.29 session and
Working Party on Brakes and Running Gear (GRRF) General information
Working Party on General Safety Provisions (GRSG) General information
Informal document GRPE-79-08e
Note by the secretariat
Inputs Regard to “Test Phase” to TFCS
Simplification of Lighting and Light-Signalling Regulations
WLTP-27-02e Informal document GRPE-79-xxe
Note by the secretariat
Informal document GRE-78-16
Working Party on Noise (GRB) General information and WP.29 highlights
Presentation transcript:

Informal document GRPE-74-20 74th GRPE, 9-13 January 2017 Agenda item 3(b) Transposition of GTR15 (WLTP) into UN Regulations Update from WLTP Transposition Task Force

Background The creation of the WLTP transposition task force was endorsed in June 2016 at the 169th Session of WP.29 through the adoption of document ECE/TRANS/WP.29/2016/73 (submitted as an AC.3 official document (ECE/TRANS/WP.29/AC.3/44) for the 170th Session of WP.29 in November 2016.) No meetings of the task force yet held. Document WLTP-17-14 from WLTP IWG #17 provides a summary of the discussions / decisions on the WLTP transposition from June 2016 onwards This document provides a summary for the 74th GRPE

IWG #16 and IWG #17 IWG #16 OICA presented a stepwise approach on how to transpose the gtr 15 into the 1958 agreement. Step 0: transitional provisions in R.83 and R.101 Step 1: transpose EU regulation (xxx/2016) into R.83 (new 08 series) and R101? Step 2: full transposition of GTR15 into UNR Japan registered their concerns over undertaking Step 1. IWG #17 Japan provided their position on OICA’s proposals Do not support OICA’s proposal for Step 1 Support Step 2 and will provide input and their full support to the task force

Step 0 – 170th session of WP.29 The secretariat recalled the urgency of this proposal and stressed that it should be an official document for the March 2017 WP.29 session, subject to the endorsement by GRPE in January 2017. WP.29 noted WP.29-170-05 and requested the secretariat to issue it as an official document for the next session in March 2017. The secretariat requested the representatives of OICA and EU to provide their comments by 5 December 2016 at the latest, so that they can be taken into account when preparing the official document.(Source: ECE/TRANS/WP.29/1126) Amended transitional provisions provided in the following working documents for the 171st session of WP.29 in March 2017: ECE/TRANS/WP.29/2017/42 – Regulation No. 83 06 series ECE/TRANS/WP.29/2017/43 – Regulation No. 83 07 series ECE/TRANS/WP.29/2017/44 – Regulation No. 101 01 series

Step 2 UNECE secretariat proposed an approach for the transposition of WLTP into UN Regulation at the 73rd GRPE (GRPE-73-26) The secretariat underlined the complexity to be fully in line with the 1958 Agreement in the transposition process, particularly in a situation where not all Contracting Parties applying that Regulation would accept any of the alternative requirements. The secretariat informed GRPE about a possible way forward, although alerted that it would only be comprehensible under Revision 3 of the 1958 Agreement and it would be subject to the endorsement of the Office of Legal Affairs (OLA) and all Contracting Parties to the 1958 Agreement. The secretariat highlighted that any Contracting Party intending to cease applying a Regulation should notify it at least one year in advance. GRPE noted the urgency to solve the issues related to the transposition of WLTP into a new Regulation and agreed to further discuss it at the next GRPE session on the basis of the work carried out by the Task Force dealing with this topic. (Source: ECE/TRANS/WP.29/GRPE/73 Report of 73rd GRPE).

Possible way forward to avoid “options” in the case “alternatives” are not accepted by all Contracting Parties Regional levels (Level 1a, Level 1b, etc.) to be published in the original version of the new Regulation on WLTP, whereas the harmonized Level 2 to be introduced by the 01 series of amendments to that new Regulation The original version of the WLTP Regulation and its 01 series of amendments can be adopted by WP.29 at the same time The original version of the Regulation could contain introductory provisions as it was the case e.g. in Regulations Nos. 116 and 117 Possible introductory provisions: “As from the date of entry into force of this Regulation, Contracting Parties shall not grant type approvals according to this Regulation until [the date of entry into force of the 01 series of amendments].” This possible way forward would only make sense under Revision 3 of the 1958 Agreement and would be subject to the endorsement of the Office of Legal Affairs (OLA) and all Contracting Parties to the 1958 Agreement Source GRPE-73-26

Possible way forward to avoid “options” in the case “alternatives” are not accepted by all Contracting Parties Adoption of the original version of the WLTP Regulation and the 01 series of amendments by WP.29 6 months – OLA notification for the original version Original version comes into force but not yet applicable as by the introductory provisions 6 months – OLA notification for the 01 series of amendments First series of amendments comes into force Original version is now applicable Latest series of amendments (Level 2 – most stringent one) only subject to mutual recognition N.B. Similar process was done for the entry into force of Regulations Nos. 132 (REC) and 135 (PSI), but without introductory provisions. Source GRPE-73-26

Step 2 continued Task Force Participation – interest in participating in the Task Force has been registered by: EU; Japan; India; OICA; and IWVTA representatives. Request for any other interested parties to contact Task Force leader as soon as possible (e-mail details at end of this document) Task Force meetings Aim to hold a minimum of two Task Force meetings prior to the next WLTP Informal Working Group (IWG #18 in Berne, April 2017) First meeting preferably a face-to-face meeting. Venue to be agreed. Informal document providing an update on progress to be presented to the 75th GRPE in June 2017

Contact information Alessandro Marotta, European Commission Alessandro.Marotta@ec.europa.eu Robert Gardner, TRL rgardner@trl.co.uk