1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.

Slides:



Advertisements
Similar presentations
Planning For The Future Idaho Powers 2006 Integrated Resource Plan.
Advertisements

In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
1 TEPPC March 25, CCPG Transmission Providers.
August 31- September 1, 2011 Rio de Janeiro, Brazil
Siting Laurie A. Woodall J. D. K.R. Saline and Associates, PLC KR Saline and Associates 160 N. Pasadena Suite 101 Mesa AZ W M
Texas Energy Independence Week Renewables & Natural Gas: Confluence, Conflict, or Something In Between? February 23, 2011 Todd Foley Senior Vice President,
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
2014 – 2020 Northern Ireland ERDF Investment for Growth & Jobs Programme PAUL BRUSH Head of European Support Unit DETI Tuesday 12 th February 2013.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
GPA Renewable Energy Resource for Guam Power Authority
September 2012 Energy Opportunities: Solar, Wind, Energy Efficiency.
California Independent System Operator Corporation Overview of ISO Renewable Resource Program Karen Edson Vice-President of External Affairs October 9,
EIM DISALLOWANCE CASE: PROGRESS IN THE SOUTHWEST Aka: Continued Assault.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Engineering Technology Division
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Technical Conference on Net Metering Load Research Study November 5, 2014.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Designing for Renewable Energy A View From Arizona BLM Jim Kenna April 2010.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
APS Top Renewable Transmission Projects Arizona Public Service Company November 23, 2009 Brian Cole John Lucas.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, June 7 th 2016.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Distribution System Planning in Hawaii
JU September Stakeholder Engagement Conference Webinar #1
RENEWABLES AND RELIABILITY
Economic Regulation of Irish Water
Developing a Solar Roadmap Tapping every ray of the sun
SunZia Project Description
New capital versus existing capital
Energy Storage Study PPRAC Meeting May 17, 2017.
Creating a Clean, Unbreakable Grid
Michael Bailey, P.E. SDS Meeting, June 25-26, 2018
Prepared by: Maha Abu Mowais 31 October 2018
Forecasting and Operations CAISO Case
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Energy Storage Study PPRAC Meeting May 17, 2017.
WECC 2019 Scenario Demand-Side Models
Presentation transcript:

1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission to Support Renewable Energy Development Renewable Energy Development April 20, 2009 Docket E-00000D Brian W. Cole Manager, Resource Planning Arizona Public Service Co.

2 BTA Order First Part: Commission-regulated electric utilities shall, by April 30 th, 2009 conduct a joint workshop or series of planning meetings to develop ways in which new transmission projects can be: Identified Approved for construction Financed in a manner that will support the growth of renewables in Arizona

3 BTA Order Second and Third Parts: Each Commission-regulated utility, either alone or in cooperation with other utilities, and by 10/31/09: Use the results of the RTTF and identify the top three potential transmission projects Develop plans to identify future renewable transmission projects Develop plans and propose funding mechanisms to construct the top three renewable transmission projects

4 Utilities Evaluation Process File Top 3 along with plans and funding mechanisms (Due 10/31/09) Individual Utility Evaluation of Renewable Resource and Transmission Options Utility Coordination & Common Projects Identification Example Inputs to Economic Evaluation: Resource Cost Water Availability Resource Capacity Available Capacity & Energy Benefits Transmission Cost Timing Policy Issues: Funding Mechanisms Cost Recovery Siting Constraints Export Markets

5 Economic Analysis of Resource & Transmission Project Options Overall value will be assessed comparatively to determine highest priority transmission projects –Resource and Transmission Combinations will be evaluated –Goal: To develop transmission lines and resources that we expect will bring the best value proposition for our customers Includes: –Financing –Capital Cost of transmission –Capital Cost of resource –Timing of resource in-service dates Takes into account expected delivery of energy for resource –Quantity –Timing Assesses value to customers due to: –Capacity value of resource –Energy value of resource

6 CSP Production and APS Load Profile Solar Production Data from Forecast for July 6, 2015 Figure 49 from APS Resource Plan Filing (Page 121), Docket No. E01345A

7 Wind Production and APS Load Profile APS System Load Wind Output System Peak Figure 50 from APS Resource Plan Filing (Page 122), Docket No. E01345A

8 APS Value Example Value Adjusted Delivered Cost Operational Credit & Capacity Credit Levelized Cost ($/MWH) Integration Cost & Capacity Cost

9 Utility Evaluation Process File Top 3 along with plans and funding mechanisms (Due 10/31/09) Individual Utility Evaluation of Renewable Resource and Transmission Options Utility Coordination & Common Projects Identification Example Inputs to Economic Evaluation: Resource Cost Water Availability Resource Capacity Available Capacity & Energy Benefits Transmission Cost Timing Input from Workshops RTTF Finance Group Work RTTF ARRTIS Group Work 2008 BTA Order Policy Issues: Funding Mechanisms Cost Recovery Siting Constraints Export Markets RTTF Group Work 2006 BTA Order 69389