CMAST Update March 25, 2014.

Slides:



Advertisements
Similar presentations
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Advertisements

Eyeblaster Std. banner code generation AM permissions Removing post click reports for publishers Transparent Video Loader background Playing assets.
Overview QW Gateway is a new front-end to QuipWare
Tina design review Main design decisions. Top level modules. Responsibilities. Phases A & B. Test plan. Time table.
ECOM Software Limited INTRODUCING THE MAGNIFICENT 7.
SIM346. General information about the software application.
S PECIFYING A UTHORITY T UTORIAL ( PLEASE CLICK ON SPEAKER ICON TO HEAR INSTRUCTIONS ON EACH OF THE FOLLOWING SLIDES )
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
NCI Clinical Trials Reporting Program CTRP User Meeting May 2, 2012 Gene Kraus CTRP Program Director.
High-Speed, High Volume Document Storage, Retrieval, and Manipulation with Documentum and Snowbound March 8, 2007.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Update COPC Action Item Jim Vermeulen 13 November 2008.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Test & Evaluation/Science & Technology Program Net-Centric Systems Test.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008.
Fontana Unified School District Budget Update
BES-MSP Interface ( BMI ) MPUG Presentation- December 3, 2003 MS Office Project/Project Server -- Case Study Follow-up: Integration between MSP and BPA’s.
CMAST I MPROVEMENT P ROJECT Report to the CMAST Advisory Task Group June 19, 2013.
IFTA, Inc. Clearinghouse Funds Netting Update Lonette Turner (IFTA, Inc.) Patricia Platt (KS) September 18, 2008 IFTA Managers and Law Enforcement Seminar.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
Software Quality Assurance
Grow your business... Protect their investment. Property Technologies International, LLC Work Order Processing in the PTI web suite for: Beacon Communities,
Microsoft Project Management and Accounting Project Server/Solomon Demonstration May 2005 Synergy Business Solutions Inc.
Management of Software Project CSM Software Configuration Management (SCM)
CMAST I NSTALLER A Information for the CMAST Advisory TG November 1, 2013.
CMAST I MPROVEMENT P ROJECT Report to the CMAST Advisory Task Group August 13, 2013.
System Analysis and Design Copyright © Genetic Computer School 2007 SAD14-1 CHAPTER OVERVIEW  Overview Of System Maintenance  Tasks Performed During.
Scheduler CSE 403 Project SDS Presentation. What is our project? We are building a web application to manage user’s time online User comes to our webpage.
How RSB is Making it Easy for Unit Staff to Find and Refresh BO Internal Control Reports+ HYPERLINKS TO HAPPINESS Deb Lennington May 20, 2013.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
CMAST I MPROVEMENT P ROJECT Update for the CMAST Advisory TG September 19, 2013.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
ISO 9001:2015/14001:2015 Certification Transition Process
CMS Experience with the Common Analysis Framework I. Fisk & M. Girone Experience in CMS with the Common Analysis Framework Ian Fisk & Maria Girone 1.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Doc.: IEEE /0051r1 Submission May 2011 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report - May 2011 Date: Authors:
Page 1August 9, 2000Market Information Forum Market Information Forum ADS Phase 2 Update Presentation to Stakeholders Greg Ford and Kristen Kelley.
Opening Session.
HMA Follow On Activities
BEIS Update SEC Panel 21 April 2017.
Jason Bury Dylan Drake Rush Corey Watt
Updatecenter Module 3 Application Server SE/EE 8.1 Installation
MobileNAV News Sándor Brecsok Tibor Major Partner Manager MobileNAV
Procurement Desktop Defense (PD²) and the System for Award Management (SAM) SPS Spotlight Series April 2014.
Updatecenter Snjezana Sevo-Zenzerovic
Specifying Authority Tutorial (please click on speaker icon to hear instructions on each of the following slides) CMA & Title 24 Webinar; Jan 28, 2010.
Technical Session Jonathan Wood.
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
LCGAA nightlies infrastructure
Basic Work-Flow with SQL Server Standard
Copyright Scott Bloss, All rights reserved.
3.0 Internal Audit Process
Tax Rate Redux Sue Anne Athens, CIO August 2016.
CSE 403 Project SDS Presentation
VIG TG Update NFRC Fall Membership Conference
Z2 Crediting Project Update RTWG
Chapter 1 (pages 4-9); Overview of SDLC
Participant Browser Services (PBS) Update
nd Vice Chair’s Report - May 2011
nd Vice Chair’s Report May 2013
(Improper Payments Prevention Initiative)
Projector April 2014 Release Overview
Goal: Improve Nominating Process for Board of Directors
ID Card Billing from System Administration to Student Account
Lesson 1 Understanding Software Quality Assurance
Overview of Projector 4.1 (712) , access code
Structure of the Code Phases 1 and 2
Overview of Contract Association Batch Upload
Voyage into Validation
Octorara Area School District
Presentation transcript:

CMAST Update March 25, 2014

CMAST Improvement Project CMAST Update CMAST Improvement Project On schedule and budget Approximately half way complete Concludes in December 2014 May need to explain reason for including UI modifications with September update (installer) March 25, 2014

CMAST Improvement Project CMAST Update CMAST Improvement Project Completed to date Label Certificate improvement Separating the Actual Size information from the Label Certificate to the Supplemental Info Report via the Supplemental Info checkbox Product type modification (metal/nonmetal frame) User interface Type glass id Double click for the frame configurator Bid report improvements (Phase 1) Make available on the server March 25, 2014

CMAST Changes (not Improvement Project) CMAST Update CMAST Changes (not Improvement Project) CMAST billing changed since the beginning of the CMAST Improvement Project Removed billing function from CMAST Now billed from staff IGDB updates to 33.0 34.0 will be with next release March 25, 2014

CMAST Improvement Project CMAST Update CMAST Improvement Project Next on schedule Smart Synchronization Internal testing in April May launch anticipated March 25, 2014

Next Items in Improvement project CMAST Update Next Items in Improvement project WINDOW7/THERM7 integration (calculation changes) Will begin to test now Batch approval process Will speed component upload Update Document Trail Audit (change allowing the IA to reset the SA’s DTA if necessary) Update Role Visibilities Bid Report Phase 2 Update Server DB (ongoing) Update Client DB (ongoing) March 25, 2014

New Items for CMAST Improvement CMAST Update New Items for CMAST Improvement Supplemental information revision on bid report Staff and task group creating business case Improved algorithm integration NFRC 100 ballot must pass March 25, 2014

Questions?