Technical Summary - ANL

Slides:



Advertisements
Similar presentations
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Advertisements

Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Superconducting Undulator (SCU) Development at ANL Efim Gluskin on behalf of the APS/ANL team Superconducting Undulator R&D Review Jan. 31, 2014.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Superconducting Undulators WBS: APS-U Yury Ivanyushenkov Physicist, SCU Project Technical Leader ASD/Magnetic Devices Group DOE Lehman CD-2 Review.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
P. Emma, …for the SCU R&D collaboration: ANL, LBNL, SLAC August 28, 2014 P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC C. Doose, J. Fuerst, Q. Hasse, Y. Ivanyushenkov,
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Part 2: NbTi Magnet Performance Yury Ivanyushenkov for the APS SCU Team: S. Bettenhausen, C. Doose, M. Kasa, Q. Hasse, I. Kesgin, D. Jensen, S. Kim, G.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Summary of discussions
MICE Absorber and Focus Coil Magnet – Test Results
Teleconf ACS – FREIA 28th March 2017
Mechanical and cryogenic configurations
FEL SCU development at APS/ANL
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Spectrometer Solenoid Update
LARP Vertical Test Facility
Spectrometer Solenoid Fabrication Status and Schedule
(vertical cryostat, Gersemi)
SCU R&D Motivation P. Emma …for the SCU R&D collaboration: ANL, LBNL, SLAC Close-Out Review Mar. 3, 2016.
Summary of discussions
Dan Potratz M.S. Student Mechanical Engineering
A Cold SCU Phase-Shifter
Cryomodule Assembly Plan
Presentation transcript:

Technical Summary - ANL Part 1: Cryostat (J. Fuerst) Part 2: Magnet (Y. Ivanyushenkov) for the APS SCU Team: S. Bettenhausen, C. Doose, M. Kasa, Q. Hasse, I. Kesgin, D. Jensen, S. Kim, G. Pile, D. Skiadopoulos, E. Trakhtenberg, Y. Shiroyanagi, M. White Mar. 3, 2016

SCUs in operation at the APS SCU0 installed in APS January 2013 (0.3 m magnetic length) SCU1 installed in APS April 2015 (1.1 m magnetic length) LCLS SCU R&D leveraged a mature cryostat design to save development costs. Design was originally developed at the Budker Institute of Nuclear Physics and brought to ANL through a cooperative effort.

Cryostat Layout – from 0.3 to 1.5 meter magnets Cryostat thermal performance is essentially independent of magnetic length. The same cryostat is used to test both LCLS R&D magnets.

Cryogenic System Design Closed cycle (zero boil-off) liquid helium bath-cooled magnets with cryocooler-based recondensation. Excess 4 K capacity is about 0.5 W. Helium bath pressure/temperature is regulated using a heater. Beam chamber is cooled at a higher temperature level due to high beam-induced heat loads (up to 20 W) in storage ring applications. Numerical simulations verify existing design and guide future effort.

Vendor-Supplied Components Vacuum vessel, thermal radiation shields, and liquid helium tank are built-to-print following a detailed SOW. To date, three units have been ordered from two separate vendors. Cold mass components (magnets, piping, beam chamber, support frame, etc.) are separately sourced or fabricated in-house.

NbTi Magnet - Cold Mass Assembly (1) Magnets & beam chamber are installed and pre-aligned to the support strong-back Magnetic gap and chamber clearance are established

NbTi Magnet - Cold Mass Assembly (2) The liquid helium tank is mounted and connecting pipes between tank & magnets are routed. Current leads, voltage taps, temperature sensors etc are added.

NbTi Magnet - Cold Mass Installation Wiring checkout & end loading

Nb3Sn Magnet - Cold Mass Assembly (1) Magnet envelope is similar to NbTi version. Additional tuning and cooling features need to be accommodated. Alignment between beam chamber and magnet is critical.

Nb3Sn Magnet - Cold Mass Assembly (2) The project purchased two cold mass support frames so LBNL could do pre-assembly prior to shipment to ANL. ANL activity upon receipt consisted of alignment check, LHe tank installation, and wiring

Final Assembly, Cooldown, Measurement Final electrical connections are made between the cold mass and the current lead/cryocooler turrets. Vacuum vessel turret and end covers are installed. Cryostat is moved to the measurement bench and aligned.

Cryostat Performance – NbTi Magnet

Cryostat Performance – Nb3Sn Magnet Dots represent NbTi magnet cooldown Nb3Sn cooldown profile is very similar Subtle differences reflect variations in design and assembly.

Typical NbTi Magnet Quench Response Initial spike indicates rapid boiling, after which liquid and vapor return to equilibrium. System remains closed throughout, with no helium venting. Slow linear reduction in temperature/pressure reflect the available excess cooling capacity of the cryocoolers.

Summary/Future Work Mature cryostat design performed as expected. Prior assembly experience reduced risk & enabled the project to focus on magnet development. This project has jump-started future cryostat R&D for both storage ring and FEL light source applications. OLD NEW 5-meter FEL SCU concepts with QTY3 1.5-m magnets New APS cryostat concepts are being developed based on experience and further analysis.