Career & Technology Education

Slides:



Advertisements
Similar presentations
Area and Perimeter Third Grade
Advertisements

Principles of Manufacturing M anufacturing Mathematics Copyright © Texas Education Agency, All rights reserved.
Cabinet and Countertop Installation
CON 4003 Construction Estimating Prof R. V. Locurcio.
FORMWORK Prof Awad S. Hanna.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
STEEL CUTTING CHARGES ACTION: Calculate and place steel cutting charges. CONDITONS: Given a 2 hour block of instruction, students handout, FM ,
1 References For This Page Handbook References Frame Kit References Last revision 5/30/09 References to Forms New or Revised Document of 15 Lowe’s Program.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Wood Products Lumber Measurements Calculations
WOOD JOINTS Items to consider when choosing a wood joint.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Calculating board Feet linear feet square feet
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
The Conclusion of the Cabinet Section
CON 4003 Construction Estimating Prof R. V. Locurcio.
Materials Reminders. Get out your agenda if you see your name below. I would like to have you in my FLEX tomorrow. Period 2Period 7.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Please start Bellwork # HW, red pen, book on desk.
You will learn to solve problems that involve the perimeters and areas of rectangles and parallelograms.
Old Main. Finalized Process Plans  Front Face Process Plan.
1 Setting Up Inventory Lesson Lesson objectives To get an overview of inventory in QuickBooks To practice filling out a purchase order for inventory.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
Wood Types and More. Commercial Importance of Wood People have used wood for millennia for many purposes, primarily as a fuel or as a construction material.
Principles of Manufacturing M anufacturing Mathematics Copyright Texas Education Agency (TEA)
Bell Ringer Calculate the perimeter of the figure. 2.Calculate the area of the figure.
Construction Math This presentation gives examples of scenarios one would use math in construction situations.
Detailing References: Jefferis, A. & Madsen, D. A. (2005). Architectural drafting and design (5 th ed.). Clifton Park, NY:Thomson. Allen, E. & Iano, J.
Agricultural Mechanics Fundamentals & Applications
BILL OF MATERIALS. BEGINNING THOUGHTS ► IDENTIFY ONE MACHINE THAT YOU WILL USE TO BULID YOUR CONCRETE FLOAT? ► WHY MUST YOU USE A RULER WHILE BUILDING.
What goes up and down but never moves?
Stock Preperation Warm-Up. Explain the difference between the USE of the JOINTER and the SURFACE PLANER.
Chapter One Introduction To Cabinetmaking Pg
Production Decisions Chapter 6 Mr. Higgins. Objectives Identify the need for a plan of procedure Identify the need for a plan of procedure List the steps.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Objective Calculate the amount of materials needed for a construction project.
Cabinets -2- Cabinet Details & Joinery. Construction Joints u Used to increase strength u Improve looks u Complex joints more common in higher quality.
Wood Joints and clamping. Wood Joints “joints”…this term is used to describe the close securing or fastening together of two or more smooth, even surfaces.
Slope as Rate of Change. Calculating a rate of change. Dependent variable is the y variable. Usually on the bottom. Independent variable is the x variable.
Planning Considerations in planning are: –Function or Usefulness: is it needed? –Kind of Wood: Depends on function and finish used. –Size & Proportion:
Copyright © Cengage Learning. All rights reserved. 1.3 Perimeter, Area and Volume.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
THE COST OF MANUFACTURING How much does manufacturing cost?
 Overview of Interior Finishes  Types  Examples.
INDUSTRY STANDARDS AND QUALITY WORK Principles of Architecture and Construction Copyright Texas Education Agency (TEA) 1.
Now that I built it, How much did it Cost?
Board Footage Cutting Board Example Project (I) Example Project (II)
State Practice Exam Wood Joints.
Copyright © Ed2Net Learning, Inc.1 Three-Dimensional Figures Grade 5.
Board Footage What is board footage How to Calculate it Example of calculating project costs with board footage.
Review Grimsby Construction Program. ExamView Program  You must have a login account to access program  Your must enter your student number ( I will.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
For more information contact: Arkansas Wood Doors l l
Drawing Floor plans.
Wood Products Lumber Measurements Calculations
Ork Watch Tower – First Floor Measurements may vary on your printer
Setting Up Inventory Lesson 10.
READ PGS section of CARPENTRY FUNDAMENTALS textbook
FORMWORK DR. Nabil Dmaidi.
Building a Nightstand Woods 1 Final Project Step #1
Standing and Running Trim
Quadrilaterals II Geometry – Unit 6.
EDUCATOR SERIES Solutions for Life. Learning. Discovery.
Reading a Tape Measure.
Career & Technology Education
Career & Technology Education
August 29th AGENDA Please have 2 sharpened pencils for use today
Building an Experiment Cart
Presentation transcript:

Career & Technology Education Casework Presented by Jim Broich AWILL Career & Technology Education Module 12

Room 46 Bookcases Locate Floor Plan and Elevation Floor Plan – Pg 1 Elevation – Pg 5 List number of 36-inch bookcases needed Develop List of Materials (White Melamine) Sides Tops and Bottoms Shelves Backs (1/4-inch) PVC edge banding 2 X 4 ladder base stock Locate the Cost sheet for Bookcases in the back of your handbook. In the Tool Tall Towers building, find Room 46 on the floor plan, and determine the number of 36-inch bookcases in the room. Presenter verify with attendees the following quantities of parts: ANSWER: 25 bookcases; 50 sides; 50 tops and bottoms; 125 shelves; and 25 backs List the PVC edging by number of pieces and the 2x4 studs required for base. ANSWER: PVC 50 pcs 7ft; 50 pcs 3ft; and 125 pcs 3ft; STUDS 25 LF; Jacks 40 ea. Instructor says list the quantity and size for the items, and add to the Costing Sheet Target time = 5 minutes usually

Get Number of SHEETS Based on 4 x 8 How many lineal feet of 2 x 4? . . . How many for sides? . . . How many for tops and bottoms? . . . How many for shelves? . . . How many for backs? How many lineal feet of 2 x 4? Convert your quantity of parts to number of sheets required for each. Total the PVC edging and the lineal footage of 2x4 studs. Fill in material placement costs in cost sheet. Target Time =

Price the Materials Fill in the quantity for each type of sheet Look up cost of material Apply overhead Develop material cost Fill in quantities and costs in Bookcase worksheet. The instructor can remind attendees that the material cost sheet is included in the packet. The percentage for overhead is developed for our examples remember to calculate your own when you return to the plant. Target Time = 3 mins.

Spot Check Table Captains Do We NEED more Waste Factor? Report your table consensus on the total developed price for materials Do We NEED more Waste Factor? Presenter needs to explain that the ‘developed’ cost includes 28% for overhead. No additional waste factor is required as we calculated the number of sheets.

Calculate Labor Costs - 200 Cut, machine and assemble 36-inch modules with dowel construction Section 200 200 and 250 Open your cost book to section 200, find the operations for 200 and 250. As the operation 200 is calculated by the sq ft, figure the square footage of the sheets of material and calculate the hours required. Total the lineal footage of edge-banding and calculate the hours. The next slide is a spot check and will not be noted in your handbook.

Spot Check Table Captains Report your table consensus for hours required to cut sheet stock Report your hours for edge-banding ANSWER: 8 hours - cutting ANSWER: 2.4 hours - edge-banding

Calculate Labor Costs - 400 Section 400 Drill for dowels Drill for adjustable shelf holes Groove parts for backs Insert dowels Case clamp assembly Note special condition Turn to Cost book section 400; find the operations and determine labor hours required. Add up the total labor for all bookcases. Time - 7 mins.

Spot Check Table Captains Report your table consensus for total labor hours required for complete fabrication. Presenter requests labor hours from Table Captains. Our answer is 63.7 hours There are two aspects of these bookcases that do not meet the AWI Quality Standards for this project. If you know what they are, save your answer for tomorrow, there may be a great prize in your future. ANSWER: 1) Bookcase shelving needs to be 1” thick for spans over 32” - in QSI8, 400-G-8; 2) Structural lumber for toe-kick is not recommended in QSI8, 400 A-T-1.

Summary Bookcases Notice the layout of the Cost Book sections The labor hours provided are a consensus of AWI members to give you an average. When you return, look at your own cost reports and fill in your own plant labor hours. Does everyone have a total cost for bookcases?

Plastic Laminate Cabinets Rms 25, 26 ,27,42 ,47 & 48 Floor Plan – Pg 1 Elevation – Pg 4 Develop List of Materials Sides Tops, Shelves, and Bottoms Doors (HPDL) Backs PVC Edge Banding Hardware Presenter Jim Broich does this section of 12_Addendum

Plastic Laminate Cabinets Listing of Materials Fill in spread sheet with material listing Extend material units, apply waste factor, and develop totals List hardware

Plastic Laminate Cabinets Spot Check for Materials View Table consensus of Totals Explain they can base their Door labor listing from their S & R wainscot

Plastic Laminate Cabinets Labor Listing Operations Cost book sections 200 & 400 List section and labor hours Extend labor hours and develop totals

Plastic Laminate Cabinets Summary Spot check for labor totals View table consensus of totals Total Calculations Add total to your bid. Presenter does a summary of what task has been completed and total amounts. Presenter informs attendees to place totals with their bid.

Cabinetry: A/V and Storage Turn to elevation of A/V storage unit Refer to section 400 Listing Start with panels Hardware Stile & rail doors List materials List Labor Presenter Jim Broich does this section of 12_Addendum

Information Given Material mark up is 28% Euro. Cabinet construction (no face frame) Labor rate is $50.00 per hour. Material Prices: 3/4” Melamine .70 sqft 1/2” Melamine .55 sqft. 4/4 Red Oak $2.50 Bdft. Red Oak edge band .15 per ft. Hinges $4.00 ea. Touch latches $2.00

Cabinetry: A/V and Storage Panel Listing Item Material Description Qty Un Size Thick Size Width Inches Size Length Lft Table 2 & 4 Table 3 Net Total Materials Unit Waste Multiplied Material Total Req’d 1 Backs 1/2" Melamine Sqft . 2 Sides 3/4" Melamine 3 Bottoms Explain they can base their Door labor listing from their S & R wainscot

Cabinetry: A/V and Storage Summary Total Calculations Summarize and Apply Overhead Markup Total Your Material Costs Add total to your bid. Presenter does a summary of what task has been completed and total amounts. Presenter informs attendees to place totals with their bid.