Sediment Cleanup Options

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

401 Water Quality Certification South Carolina Department of Health and Environmental Control.
By Chris Ford and James Hughes ( ) ( )
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
Confined Disposal Facilities and In Situ Capping Site characterization / selection Engineering design Operational considerations Contaminant pathways and.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
London Convention Guidelines for Assessment of Dredged Material
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
US Army Corps of Engineers BUILDING STRONG ® Regulatory Program Glen Justis Chief, Policy & Administration Regulatory Division Alaska District 2010 Building.
Environmental Legislation & Regulations Professor Bernie Engel ASM 336 September 13, 2004.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Grand Calumet River/Indiana Harbor Canal Feasibility Study
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Sediment Quality in the Corpus Christi Bay Sediment Quality in the Corpus Christi Bay Natalie Bartosh GIS in Water Resources, Fall 2003 Dr. Maidment, The.
Wetland Creation Why and How Char Ison and Caleb Asbury.
 Nuisance.  Person liable if they use their property in a manner that unreasonably interferes with others’ rights to use or enjoy their own property.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Dredging Engineering: Building & Maintaining Underwater Highways
Modeling to Understand Stormwater Management Efforts Portland Harbor Superfund Site Dawn Sanders City of Portland Bureau of Environmental Services September.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
ALTERNATIVE BALLAST WATER EXCHANGE AREAS Workshop on Physical and Biological Oceanographic Considerations June 20-22, 2006; Seattle, WA Concepts Federal.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Management of threats to fish and wildlife from PBTs Scott Redman, Puget Sound Action Team Puget Sound Plankton - The Ultimate Seafood Experience, Jan.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
PIANC USA and ASCE-COPRI DREDGING 2012
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
Strategic Planning for Contaminated Sediment Projects: Setting the Course for Proper Project Execution Howard L. Cumberland Geosyntec Consultants October.
Department of Army Permitting Process: Dredging
76. The central U.S. law regulating water quality is the Clean Water Act (CWA), adopted in The Act initially focused on point sources, which it.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
1 How the Water Board Protects California’s Water Quality Kate Hart, Board Member Chair Central Valley Regional Water Quality Control Board.
Results of Screening Analyses of 224 California MSW Landfills Landfill Compliance Study presented to California Integrated Waste Management Board by GeoSyntec.
State of Alaska Assumption of Section 404 program Michelle Bonnet Hale, Director, Division of Water Alaska Department of Environmental Conservation Steven.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
Wyckoff/Eagle Harbor Site
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Coal Mining Activities
THE CORPS REGULATORY AUTHORITY
Continuing Authorities Program
Coal Mining Activities
Michigan Dept. of Environmental Quality Water Resources Division
Environmental Law Fall 2018
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Sediment Cleanup Options Choosing Among Options Regulatory framework for descisions (Materials courtesy of Portland Office, ACOE) CDF Example: Ross Island (Materials courtesy of Stuart Albright, Hart Crowser) Wyckoff/Eagle Harbor (Puget Sound) 11/23/2018 W. Fish, Portland State University Copyright, 1996 © Dale Carnegie & Associates, Inc.

Quantities of Dredged Sediments 250 million cubic yards from 25,000 miles of navigation channels 75 million cubic yards from permits 325 million cubic yards each year Self explanatory The figure at the bottom is an average for NW Division. Over half of hat is from the Columbia/Willamette system.

How Much Dredged Material? > 5½ feet deep over Washington, D.C. Take your choice but most folks prefer to see DC filled. > 1½ feet deep over Chicago

Authorization Rivers and Harbors Act of 1899, Clean Water Act Section 10 Clean Water Act Section 404 Marine Protection, Research, and Sanctuaries Act Section 103 These are the Three acts that give the Corps/EPA their Authorities to evaluate dredged material for suitability to dredge and dispose of. These acts also require the Corps to regulate the placement of dredged material from private/non federal dredging projects.

Regulatory Authorities U.S. National Marine Fisheries Service U.S. Fish and Wildlife Service U.S. Environmental Protection Agency State Fish and Game Agencies State Water Quality Certifying Agencies State Coastal Zone Management Agencies Other Federal and State Agencies These are the various agencies which also have legislative authorities concerning dredge and fill activities in the US. We are required to consult and or seek approvals from them prior to initiating a dredging project.

Federal Standard The disposal alternative or alternatives identified by the Corps which represents the least costly alternative consistent with sound engineering practices and meeting the environmental standards established by the 404(b)(1) evaluation process or ocean dumping criteria. This is how we are to balance activities regulated by the laws. We are to weigh the alternatives and input from the public and agencies and public notice the alternative which strikes the best balance.

Framework for Environmental Acceptability of Dredged Material Disposal Alternatives Evaluation of Dredging Project Requirements Identification of Alternatives Initial Screening of Alternatives Here is the basic process that each of the disposal alternatives goes through. Detailed Assessment of Alternatives Alternative Selection

Technical Framework Summary Reflects real-world conditions Reflects aquatic, intertidal, and upland environments Indicates biological availability of contaminants Predicts potential environmental impacts Provides appropriate level of protection Is consistent with CWA, MPRSA, and NEPA In summary here is what EPA and the Corps hope to get out of utilizing the document.

TIER I TIER II TIER III TIER IV INCREASING COMPLEXITY/ COST Existing Data TIER II INCREASING COMPLEXITY/ COST ENHANCED RESOLUTION Physical/Chem. data Screening Tests Predictive models TIER III Toxicity Tests Bioaccumulation Tests Now to the tiered evaluation process EPA and the Corps use to evaluation the dredged materials suitability for the various disposal options we have worked through. It is a tiered approach with increasing cost and time as you work from tier 1 to 4. But with the gain of environmental understanding and lack of uncertainty TIER IV Chronic Sublethal Tests Steady-State Bioaccumulation Tests Risk Assessment

And here it is and one place where you can access it And here it is and one place where you can access it. I also have a few paper copies with me. https://www.nwp.usace.army.mil/ec/h/hr/

Basic Dredge Types Hydraulic Mechanical Other / Combinations Pipeline Hopper Mechanical Clamshell Other / Combinations In order to assess a project first you decide on the type of equipment that can do the job

Factors in Selection of Dredging Equipment Physical characteristics of sediments Quantities to be dredged Dredging depth Distance to disposal area Physical environment of and between areas Contamination level of sediments Method of disposal Production required Types of dredges available Here are the factors we use to do that. In the interest of time I want go into detail on these.

Dredged Material Disposal Alternatives Open Water Placement Ocean ~ Estuarine ~ Lakes ~ Rivers Confined Disposal Facilities (CDFs) Diked containment Beneficial Use Applications Here are the three basic methods of disposal available after we select the type of equipment that can do the work.

Beneficial Use (BU) Applications BU is alternative of first choice Needs and Opportunities Material Suitability Logistical Constraints Regulatory Requirements Vary CWA / MPRSA Other The first thing we do is determine if there is a beneficial use for the material. This can be a combination of or either of the other alternatives.

Confined Disposal Facilities Site characterization / selection Engineering design Operational considerations Contaminant pathways and controls Long-term management Monitoring More considerations

Confined Disposal Alternatives 11/23/2018

Engineering Issues Reduce Contaminant Pathways Optimize Capacity Disposal pathways Physical disturbance Seepage Optimize Capacity

Physical Disturbance Erosion and Scour Slope Stability Nature of underlying materials Stability of existing and future slopes Excavation and Removal Intended End Use of Site Consolidation and Settlement Cap Properties

Seepage Excess Pore Water Long Term Seepage

Other Considerations Dredged disposal volume Area of land desired Habitat mitigation requirements Cost comparisons

Ross Island 11/23/2018

11/23/2018

11/23/2018

Typical Cross Section 11/23/2018

Disposal Methods 11/23/2018

Potential Contaminant Migration Pathways - Disposal Processes 11/23/2018

Potential Contaminant Migration Pathways - Groundwater Transport (Present and Future) 11/23/2018

Potential Contaminant Migration Pathways - Physical Disturbance 11/23/2018

Groundwater Movement through Cells 11/23/2018

Potential Groundwater Transport from Containment Cells Upward groundwater flow. Predicted discharge concentrations below risk-based criteria. 11/23/2018

Potential Physical Disturbance of Containment Cells Natural erosion (floods). Human influence (mining). Geotechnical stability. 11/23/2018

Slope Instability 11/23/2018

Potential Physical Disturbance of Cells Minimal erosion potential due to dike. Mining controls would avoid impacts. Slopes are receiving fills. 11/23/2018

W. Fish, Portland State University Wyckoff/Eagle Harbor Bainbridge Island, in Central Puget Sound 3,780-acres Inactive 40-acre wood treating facility owned by Wyckoff Adjacent 500-acre Eagle Harbor Other upland sources of contamination (Shipyard) 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University Wyckoff/Eagle Harbor 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University Site History Shipyard operated from 1903 to 1959 on the northwest shore of Eagle Harbor, resulting in releases of metals and organic contaminants. 1905 to 1988, wood treating operations were conducted on the southeast shore involving pressure treatment with creosote and pentachlorophenol 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University Historical Sources Preservative chemicals were stored in tanks on the property. Contamination of soil and ground water at wood treatment facility led to seepage into adjacent sediments. Wastewater discharged into Eagle Harbor for many years; storing treated pilings and timber in the water continued until the late 1940's. 11/23/2018 W. Fish, Portland State University

Contaminants of Concern Shipyard: Levels toxic to marine life polyaromatic hydrocarbons (PAHs) and other organics heavy metals such as mercury, copper, lead, and zinc 11/23/2018

Contaminants of Concern Wyckoff facility, soil and groundwater are contaminated with: Creosote Accompanying PAHs pentachlorophenol (PCP) 11/23/2018

W. Fish, Portland State University Discovery 1984: NOAA investigations of the Harbor revealed that sediment, fish, and shellfish from Eagle Harbor contained elevated levels of PAHs EPA required Wyckoff to conduct environmental investigation activities under RCRA, and the state required immediate action to control stormwater runoff and seepage of contaminants 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University CERCLA Operable Units 1991, EPA defined three operable units at the Wyckoff/Eagle Harbor site: Wyckoff (OU1) East Harbor (OU2) West Harbor (OU3) Wyckoff Facility groundwater (OU4, 1994) 11/23/2018 W. Fish, Portland State University

East Harbor Capping (OU2) Sept 1993-March 1994, EPA and the Corps of Engineers covered contaminated sediments in the East Harbor Cap of clean sediment at water depths of 17 m and 13 m, respectively. Sediment was dredged from the Snohomish River as part of an annual project for ship navigation 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University Capping Methods Split Hull: Fast but uneven. 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University Capping Methods Hydraulic washoff: 11/23/2018 W. Fish, Portland State University

W. Fish, Portland State University West Harbor CDF (OU3) 11/23/2018 W. Fish, Portland State University