DRE20 Recovery The Problem The Objectives

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

AFT END ARRANGEMENT By Group 1.
Orientation of Load Cells
UNIVERSITY of N ORTHERN C OLORADO. To move forward press enter or the down arrow key To view the previous slide press backspace or the up arrow key.
Retrieval of damaged truck on Geehi River Aqueduct.
Breakdowns and Trail Repairs A guide for preparedness.
Part1: Shollow foundations
Goonyella Riverside Mine Dipper Trip System Improvement Project.
Lecture 4 Excavating and Lifting
ITD Project Development Conference Boise, Idaho April 2005
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
1 Metallurgical Coal EXPERIENCES FROM THE USE OF IN CYCLE TENDON SUPPORT Richard Campbell Principal Geotechnical Engineer Blackrock Mining Solutions.
The Role of Defect Elimination in Reducing Hazard Exposure Presented by: Stuart Tomlins Callide Mine.
Function, Construction and Operation
CPE Rebuild Facility 10/20/11. CPE Cloud Peak Energy (CPE) is one of the safest producers of low sulfur, high quality, subbituminous coal in the United.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
Cutaway View for KDS Winch Parts Gear Clutch Brake mm.
The 30M2 Continuous Miner. Customer Name 30M2 Overview %Heavy duty high power miner for mid-height seams %High productivity from efficient cutting and.
1 DRIVERS TRAINING COURSE VEHICLE SELF RECOVERY OPERATIONS.
1 2 DRAGLINE: Application. Further, the choice of stripping unit is influenced primarily by the system of mining, which is itself influenced by surface.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 PID Support Design Stephanie Yang.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
R. Rinaldesi, K. Kershaw – HE Group
Rolling element bearings A. Lozzi 09
GABBIANI Automatic horizontal Panel Saws for pressed cardboard (transformers industry) Quality Machines from: Jai Industries.Gujarat, India
Drilling Rig URB-10-2SH property of. 2 “INNCOR” Company Presents multipurpose drilling rig “Buran” URB-10-2SH, for the first time designed by the method.
TRENCHLESS TECHNOLOGY
FALL PROTECTION IN THE WORKPLACE Trainer’s Guide
OLD POLE Remediation Project FY11. Old Pole Location.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
What we can resolve and Our experience in the field of industrial solutions.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Carbon Critical Design: Comparison of RE wall and RC viaduct on the Benz Circle Flyover, Andhra Pradesh Adrian Anderson, General Manager Nehemiah Reinforced.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Static Analysis Static Analysis, Internal Forces, Stresses: Normal and Shear 1.
The Leaning Tower of Pisa Group 10. La Torre di Pisa The Tower of Pisa is the bell tower of the Cathedral Construction began in August 1173 Work completed.
Capstone Project Proposal
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
Operating Safety for Draglines, Dozer Operators and Other Groundmen.
MAE 435 Progress Report Team: Formula SAE Due Date: 2/8/2016 Advisors: Dr. Bawab; Nathan Luetke Presenter: Ryan P.
Statics. Identifying Static Situations Objects that do not move linearly (translational motion) or rotate (rotational motion) are static.
LUKHDHIRJI ENGINEERING COLLEGE MORBI SUBJECT :- “BOX SHEAR TEST” 1.Mepani Kiran ( ) 2.Pavasiya Jaydeep ( ) 3.Pindoriya Jenti( )
HUMAN POWERED TRACTOR Team Members: Ethan Harris: Team Leader/Design Engineer Matthew Burtis: Team Reporter/Design Engineer Brandon Roberts: Design Engineer.
FOUNDATIONS.
Statics, Fourteenth Edition R.C. Hibbeler Copyright ©2016 by Pearson Education, Inc. All rights reserved. In-Class Activities: Check Homework, if any Reading.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Concrete Repair.
Rebuilding a 6 m Dish antenna
UNIT-2 MACHINING.
Staircase Civil Engineering Drawing Department of Civil Engineering
TYPES OF CHASSIS FRAMES
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
Logistical information
SERVICES, LLC 1 1.
My engineering project tipping swarf bin
EILERSEN The Weighing experts.
SAFE WORK INSTRUCTIONS
MAINTENEANCE AND REPAIR OF STARTING SYSTEMS
CONSTRUCTION METHODS & TECHNOLOGY
Drag system in Dragline and Backhoe
Monitoring of statistical data related to OCM
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
SR 1 and 2 Hay Point Fatigue Damage Structural Risk
F&T Inc. OVERHEAD CRANE SAFETY.
Strip Foundations The foundation runs under all the loadbearing walls.
Using the Boom Angle Indicator
TT-0M ■ Strong Magnet ■ For Oil Surface ■ 360 Degree Rotating
Presentation transcript:

DRE20 Recovery The Problem The Objectives DRE20 was positioned at a combined angle of 45.5 degrees from the horizontal. The Objectives Recover DRE20: Safely. Minimise collateral damage to the machine. To allow return to work as soon as possible. H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery The Problem Con’t H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery The Problem Con’t Material in the area does not have a high bearing capacity. Machine could not safely be recovered using traditional methods of material removal from under the tub due to the type of material and the angle of the machine. In previous recoveries, machines had slipped along the centreline of the machine (ie Nose down, or ballast box down). Initial meetings determined that traditional recovery methods were not able to be applied in this situation. Initial Centre of Gravity checks determined that the machine required a restraint to be used to control movement. H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery The Solution: The Recovery Method: The recovery of DRE20 required the collaboration of experts in their field of Engineering. The Recovery Method: After the slip, the machine was stabilised and planning had begun on the method of recovery to meet the objectives. Excavation to a level to allow DRE20 to sit level. Attach winch frame and position dragline buckets as anchor points Complete excavation under tub Winch machine back to a level position to allow it to walk out under its own propel system Repair machine as needed. H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Overall Recovery Plan H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery The Righting Frame Weighed 30 Tonnes and was made of 1200mm Welded Beams. When load is applied, it moves the CoG toward the rear of the machine 1m for every 100t applied. H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Dragline Bucket and Winch Location H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Dragline Bucket Installation and Winch Location H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Ready to Winch H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Video – Initial Cut with Excavator H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Video – RC Dozer in action H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Video – RC Dozer in action H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Video – RC Dozer in action H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Video – RC Dozer in action H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Video – RC UG Miner in Action H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Almost level H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Level!!!! H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Repairs post Levelling LHS Boom Foot Stiffening between Clusters 1 and 2. Lube Room Panel Beating Crack repairs Motor Armature cables replaced Oil re-filled H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008

DRE20 Recovery Thanks To everyone involved, as the recovery would not have gone as smoothly without your input and help. H:\01 Administration\Presentations\State of Nations\2008\State of Nation – July 2008