Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Advertisements

DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Progress on 2006 Committee Recommendations Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Project Management Mark McKinnon Project Manager.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Rick PerleyEVLA Advisory Panel Meeting May , Scientific Impact of Descopes Rick Perley.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Review Context and Purpose Selection of OMT Design for the EVLA X-band Receiver Mark McKinnon EVLA Project Manager.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
Rick PerleyNSF Mid-Project Review May 11-12, Scientific Impact of Descopes Rick Perley.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Rick PerleyEVLA Advisory Committee Meeting December 14 – 15, EVLA `Descoping’ Options Rick Perley.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Future LBO Developments
EVLA Availability - or - When Can I Use It?
EVLA Front-End CDR – EVLA Front-End Schedule
EVLA Project Peter Napier
Committee Charge Fred K.Y. Lo
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Science Commissioning
EVLA Advisory Committee Meeting System Status
Software Requirements
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Gustaaf van Moorsel September 9, 2003
Software Requirements
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Background Information P.Napier
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

Budget, Schedule, Contingency Mark McKinnon EVLA Project Manager Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Outline Schedule Budget Contingency Project Risks Risk Analysis Descope Options Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Schedule Completion Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

WBS Level 2 Completion Status WBS Element % Spent % Complete Project Management 52.1 45.8 Systems Integration 76.1 70.1 Civil Construction 87.8 80.5 Antennas 69.1 59.2 Front End Systems 55.1 43.4 LO Systems 75.5 75.1 Fiber Optic Systems 64.4 58.8 IF Systems 61.5 52.7 M&C System 57.6 51.1 Data Mgt. & Computing 51.2 40.0 Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Antenna Retrofits Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Maintaining Schedule Staff is becoming more efficient in antenna retrofits Operating antenna can be produced in about 3 months Retrofits becoming an assembly line Major components stockpiled (e.g. cryo compressors, L-band feed horns) Most electronics designs are mature All retrofits have proceeded serially, except for most recent retrofit of antenna 26 Original project plan calls for overlap of antenna retrofits. Project is staffed for overlapped retrofits. With a 1 month overlap, a 3 month retrofit duration, and a 1 month testing period, the rate of antenna retrofits can be accelerated from 5 to 5.5 antennas per year. Expect progress in software areas of the project because of recent addition of e2e staff, formation of e2e Division, and finalization of M&C design. Shift front end production emphasis to Ka-band while solving design issues with wideband OMT. Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Budget: Staff Profile Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Contingency Cost to complete project = $37.39M Current contingency = $2.83M Percent contingency = 7.6% Prefer contingency at minimum of 15% Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting External Risk Factors Strength of Canadian dollar Correlator funding profile NRAO operating budget Commodity prices Aluminum, steel Gold plating Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Retirement of Risk Bulk purchase of half transponders Bulk purchase of module interface boards Successful implementation of reference pointing M&C software support of transition mode observing Eliminated spurious correlation with redesign of digitizer in DTS Solved timing problem between EVLA and VLA antennas Solved image rejection problem in 4P downconverter (T301) with new filter design Solved aliasing problem in baseband downconverter (T304) that limited sensitivity with new filter design Selected appropriate fire protection system for new correlator shielded room Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Project Risks Failure to stay on manpower curve $1.2M Extend e2e support $1.1M Extend AIPS++ support $1.0M Contribute to EPO program $0.5M Improve RFI protection $0.3M Additional module parts $0.3M Additional feed costs (S, X, Ku) $0.3M Spare correlator boards $0.2M Improve phase stability & RTP $0.2M Improve wideband OMT $0.2M Improve synthesizer (L302) $0.1M Correlator installation manpower $0.1M Redesign 3-bit, 4Gsps samplers $0.1M IF retrofits $0.1M Feed demoisture system $0.1M Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

EVLA Advisory Committee Meeting Risk Analysis Sum total risk = $5.8M Root sum square risk = $2.1M Contingency = $2.8M Conclusion: contingency coverage of risk is marginal Goal for FY06 is to refine contingency and risk analysis at finer level of detail (i.e. increase contingency and more accurately assess risk). Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006

Value of Descope Options Eliminate receiver bands: X (8-12 GHz) $1.0M Ku (12-15 GHz) $1.3M S (2-4 GHz) $1.4M Ka (26-40 GHz) $1.2M Purchase receiver components, but assemble/install as part of operations X $0.2M Ku $0.2M S $0.4M Ka $0.2M Eliminate solar observing mode $0.2M Transfer e2e effort to operations budget $0.7M Reduce number of antenna retrofits Mark McKinnon EVLA Advisory Committee Meeting May 8-9, 2006