Lancaster “Project” Tracy Rolstad Avista Transmission System Planning.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Central California Clean Energy Transmission Project
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
ACE Diversity Interchange (ADI)
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Reading a GE PSLF *.epc into PWS
Designation Process (EB ) and East-West Tie Line (EB ) March 23, 2012.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Regional Planning Group Project
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Presentation to Montana Public Service Commission October 27, 2004.
NORTHWEST POWER POOL Reliability Update
Dworshak-Taft 500 kV Line Daily Outage June Hours.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
2014 Northwest Hydro Operators Forum Special Thanks To Our Sponsors: 1.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
授課教師 : 吳元康 老師 學生 : 詹博雄 HVDC Connection of Offshore Wind Farms to the Transmission System.
Montana Ambassadors Helena, Montana February 25, 2011.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
Rocky Mountain Area Transmission Study Transmission Projects Recommendations to RMATS Steering Committee June 9, 2004.
2013 Alternative Transmission Development Robert H. Easton March 17, 2004 RMATS Stakeholder Meeting.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Avista Wind Integration Thoughts Clint Kalich, Avista Utilities (509) Wind Integration Forum Technical Workgroup.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Gaelectric North America Northwest Power and Conservation Council Missoula Meeting January 12, 2011.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Northwest Power and Conservation Council The Northwest Forecast – Energy Efficiency Dominates Resource Development Tom Eckman Manager, Conservation Resources.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Jeff Billo Manager, Transmission Planning
ColumbiaGrid Reliability Activities ColumbiaGrid Board Meeting Presentation August 15, 2007.
NW Loss of Load Probability James Gall Power Supply Analyst
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Topics Corporate Overview – Transmission Expansion Planning - Members
Nacogdoches to Lufkin SS 345 kV Line Project
Kenneth Silver Los Angeles Department of Water & Power
NORTHWESTERN MONTANA REAL ESTATE
ECEN 460 Power System Operation and Control
A Sample of Seldom Used Tools and other Power Flow Trivia
DEC System Voltage Planning - June 2018
Recent Approved WECC Cases
Windsor-Essex Electrical Service Needs and Solutions
Win Our Money Round 2.
HVDC Transmission Systems:
TONBRIDGE POWER GREEN LINE
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

Lancaster “Project” Tracy Rolstad Avista Transmission System Planning

Lancaster Request Avista has requested BPA evaluate two options (Lines and Loads Request) Alt A: Loop into Boulder—Rathdrum 230 kV Alt B: Loop into Beacon—Rathdrum 230 kV

Lancaster Loop In Five Alternatives Studied by Avista Status Quo Alt A: Loop into Boulder—Rathdrum 230 kV Alt B: Loop into Beacon—Rathdrum 230 kV Alt C: Noxon—Lancaster 230 kV into Rathdrum Alt D: 230 kV trunk line from Rathdrum

Basic One Line Western MT Hydro Cabinet Gorge 500 kV to Grand Coulee And Montana Libby Lancaster Bell Hot Springs Noxon Rathdrum Boulder Beacon

Lancaster-Noxon 230 kV Bell-Lancaster 230 kV Beacon-Rathdrum 230 kV Bell-Taft 500 kV Boulder-Rathdrum 230 kV

Bell-Taft 500 kV Lancaster-Noxon 230 kV Cabinet-Rathdrum 230 kV Beacon-Rathdrum 230 kV Boulder-Rathdrum 230 kV

Superior Option Alternative A Bring Lancaster into Boulder—Rathdrum 230 kV line “Intercepts” westbound energy before it travels east through the Bell—Beacon complex Increases use of Boulder and Rathdrum stations Decrease use of Beacon and Bell stations Losses are reduced equally for AVA and BPA Perhaps as much as 2 to 3 MW always Technically a “win” for both parties

Parameter Status Quo Alt A Alt B Alt C Alt D Total System Losses 6395.11 MW 6387.74 MW 6388.40 MW 6388.24 MW 6388.79 MW NW Area Losses 1270.71 MW 1263.43 MW 1263.96 MW 1263.78 MW 1264.32 MW AVA Owner Losses (MW) 76.71 MW 72.46 MW 72.76 MW 72.40 MW 72.85 MW AVA Owner Losses (MVAr)  494.22 MVAr  462.12 MVAr  465.07 MVAr  461.01 MVAr  464.47 MVAr Bell 500/230 kV 128.21 MW 134.02 MW 131.17 MW 130.69 MW 133.53 MW Bell 230/115 kV 236.32 MW 218.25 MW 220.24 MW 220.40 MW 221.20 MW Beacon 230/115 kV #1 215.07 MW 214.13 MW 218.62 MW 216.46 MW 216.08 MW Beacon 230/115 kV #2 202.34 MW 200.99 MW 202.77 MW 202.05 MW 201.78 MW Boulder 230/115 kV #1 113.05 MW 132.87 MW 127.18 MW 129.04 MW 127.97 MW Boulder 230/115 kV #2 106.85 MW 124.95 MW 120.57 MW 121.26 MW 121.33 MW Rathdrum 230/115 kV #1 70.32 MW 77.64 MW 77.28 MW 78.09 MW 77.46 MW Rathdrum 230/115 kV #2 90.80 MW 100.97 MW 100.48 MW 101.60 MW 100.73 MW   Beacon-Bell #4 230 kV -286.08 MW -184.47 MW -190.29 MW -192.63 MW -198.29 MW Beacon-Bell #5 230 kV -277.73 MW -167.29 MW -165.02 MW -172.06 MW -178.39 MW Beacon-Boulder 230 kV 157.84 MW 60.88 MW 89.78 MW 79.82 MW 84.69 MW Beacon-Rathdrum #2 230 kV -11.43 MW -124.23 MW N/A -133.63 MW -125.87 MW Boulder-Rathdrum 230 kV -142.73 MW -266.79 MW -281.53 MW -272.57 MW Boulder-Lancaster 230 kV -312.17 MW Lancaster-Rathdrum 230 kV 37.27 MW Beacon-Lancaster 230 kV -155.86 MW 178.93 MW Beacon throughflow (MW) 629.46 MW 515.70 MW 548.96 MW 537.62 MW 542.35 MW Bell throughflow (MW) 1146.50 MW 894.37 MW 902.65 MW 912.05 MW 925.54 MW Boulder throughflow (MW) 300.35 MW 372.72 MW 356.92 MW 361.78 MW 357.64 MW Lancaster throughflow (MW) 372.50 MW 449.87 MW 446.54 MW 249.78 MW 442.38 MW Rathdrum throughflow (MW) 350.41 MW 320.46 MW 464.00 MW 613.06 MW 596.15 MW

Disclaimers Actually study is performed by BPA BPA results are presumably definitive BPA study is not yet complete Station expansion will be required Implies all associated issues such as property acquisition, environmental issues, outages, etc