Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 32 Started with luminosity production…
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Tuesday 22 November 2011.
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Summary Thursday h21: Stable beams fill #1303.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
07/08/2010 Fill #1264 dump at 02:14:38.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Tuesday 20 September 2011.
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement. In the shadow: CMS (tunnel), ATLAS, ALICE. Lost patrol in point 5 (PM56) once more. 13:00 Inject and dump check for MKI2. 17:50: STABLE BEAMS #1991. Initial luminosity 1.88x1033. This fill had working point (0.308,0.318) 22:40 Lost cryo conditions for arc 12 (cryo-valve PROFIBUS controller in UJ16 – likely SEU) ==> Beam dump. End of Fill #1991. 27 pb-1 in ~5 h. 23:30 Problem with nQPS card of B19R1 leading to spurious trips during precycle  OK after 2 resets 04:30 trip of MKI B1 during soft-start. Piquet working

Injection kicker MKI2 (M. Barnes) FPS replaced MS-3; switch was 'MELTON' (installed during last Tech Stop, at the start of July). Now switch MOULIN installed on PFN-3 (NOTE MOULIN was in this same position prior to last TS). MELTON left in UA23 as a spare. Several electronic cards, associated with MS-3, were replaced by EC, including the following: PU.M3.G2A, TRIG M3, PU.M3.G2B, TRIG M3, PU.M3 CUR, TRIG M3 interlock thresholds adjusted as per cards removed. EC also replaced following electronic cards: FAN OUT for triggering, and cards in erratic detection chain for M3. Kicker system was operated in local mode, in the tunnel, and shown to be OK. A SoftStart was then run from the CCC. Everything seems OK.

Fill 1991 vs. 1990 Fill 1990: Emittance in collision from luminosity ~1.9 mm BB tune shift ~ -0.007/IP Lumi lifetime ~17 h (over 7.5 h) Fill 1991: Emittance in collision from luminosity ~2.0 mm BB tune shift ~ -0.0065/IP Lumi lifetime ~14 h (over 5 h). Slightly larger emittance from injection.

Fill 1991 vs. 1990 Fill 1990 Fill 1991

Fill 1991 vs. 1990 Fill 1990 after ~1h Fill 1991 after ~1.2h 1-2-5-8

Fill 1991 vs. 1990 Some spikes just after levelling in IP8 Fill 1991

Injection kicker status (M. Barnes) Erratic trigger on main switch during the soft-start process The erratic occurred at voltage higher than nominal (could be some de-conditioning of the thyratrons after 1 month) The erratic detection system worked correctly and the main and dump switches were re-triggered correctly No additional erratic seen in the other following soft-start Inject and dump verification ongoing (~2 number of typical injections)

Plan Go for another physics fill with different working point (0.312, 0.322)

Fill list Fill Termination Peak L [1033 cm-2s-1] Length [h] Int. L (pb-1) e coll. [mm] Dump cause 1975 STABLE 1.6 2.5 13 Cryo valve PROFIBUS (UJ76) (SEU?) 1976 ADJUST 1.6E33 - BLM TCSG.L7 1977 SQUEEZE RF Module trip 1979 1.3E33 6 23 QPS RCO 1980 RAMP QPS RQTL7 1982 1.7E33 EL. perturbation 1984 Vacuum R2 1985 1.75E33 11 50 El. perturbation 1986 1.85E33 14 2 RF klystron vac 1990 1.92E33 7.5 41 1.9 QPS trigger RCBXV3.R1 (SEU?) 1991 1.88E33 5 27 Cryo valve PROFIBUS (UJ16) (SEU?) 11/23/2018 LHC 8:30 meeting