Tuesday 23/11/10 8:00 Physics fill #1511 dumped

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Ion Commissioning: Thursday & Friday
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
LHC Status Tue Morning 22-Aug
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Week 47 + Start Week 48
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Saturday 30th June - Sunday: Rocky !
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 18 October : Collimation system
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Week 36 plan Todo’s: And also: 12+b injection.
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Sat morning Until 12:40: Loss maps at injection
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Tuesday – Morning and Evening
Another Immortal Fill….
Monday 27th August & night
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Tuesday 23/11/10 8:00 Physics fill #1511 dumped Delivered lumis: Atlas/Alice/CMS: 424/396/394 mb-1 Ramp down take orbit reference 10:00 Change ALICE polarity ALICE solenoid and dipole were in NEGATIVE polarity, go to POSITIVE polarity Change compensators, correct orbit Changed the crossing angle value from -140urad to 140 urad 12:00 Ramp 2 x 4 bunches RF diffusion tests at flat top 16:15 Squeeze, find collisions 17:45 Adjust TCTs around ALICE, trimmed into beam process Loss maps 21:00 Injecting for physics fill #1513 Some problems… 23:30 Injecting again for physics fill #1514 24/11/2010 LHC 8:30 meeting

Philippe Baudrenghien et al. RF diffusion tests Philippe Baudrenghien et al. Objective 1: Which Phase Noise Power Spectral Density (PSD) creates which diffusion effect. This is important in the coming years as systems intended to further reduce the cavity impedance for high intensity will also inject phase noise on the synchrotron sidebands. Objective 2 is more theoretical. Using the beam model, we can compute diffusion coefficients. Experimental data help confirm the studies (US-LARP collaboration) Conclusion: Phase Noise PSD was measured. From these data, we will quantify diffusion effects with Phase noise spectrum in rad^2/Hz. This is important for the design/installation of future systems. The profile data must be analyzed and compared to the evolution expected from the computed diffusion coefficients (US-LARP collaboration). 13:52 Double excitation again (level 16). FIRST VISIBLE effects on bunch length 24/11/2010 LHC 8:30 meeting

BCTFR Sum improved in the afternoon JJ Gras, M.Ludwig Used for Page 1 and a lot more Now sum over bunches taken from high bandwidth signal. Should give correct values as of 16:45 in the afternoon But XPOC BCT values (used for BLM thresholds) unchanged… “We have to check the calibration. We plan to do that during next fill injection process” Fill of the evening: looks better but not perfect… Error around 10 % 24/11/2010 LHC 8:30 meeting

TCTs set-up for IR2 Daniel Wollmann et al. TCTVB.4R2: old center: 4.89; new center: -3.51 TCTVB.4L2: old center: 5.655; new center: -3.175 TCTH.4R2.B2: old center: -0.47; new center: -0.545 TCTH.4L2.B1: old center: 0.01; new center: -0.01 Incorporated this into the beam processes (thanks Mike) Tested the functions Performed one half set of loss maps: B1v, B2v, B1+B2 negative off-momentum. Results (preliminary): - no surprising loss spikes (taking ions into account) - highest leakage into dispersion suppressor 3e-2 (B1v) - highest leakage into other cold magnets 5e-3 (B2v) - highest leakage into IR6 5e-3 (off momentum losses) - highest leakage into TCTs 5e-3 (IR1, off momentum losses) 24/11/2010 LHC 8:30 meeting

‘Physics fill’ 20:30 ions back in SPS after water leak in LSS1 20:30 LHC beams dumped after loss maps 21:15 Injecting for physics, but some problems Offset orbit in IP7 of about 0.5 mm -> BPMs need calibration Large injection oscillations B2, bad trajectory in transfer line Problems with filling pattern update in BQM B1 No BCT data transfer line Large beam size and bad lifetime B2 23:30 Decide to dump the beam and sort out the problems Recalibrate BPMs Injection oscillations are getting close to the limit in the horizontal plane. Also, TI 8 does not look good horizontally There seems to be an issue with the BCTs in TI 2 (or TT60) Emittances, with all bunches injected: B1H 3.0, B1V 2.2, B2H 3.2, B2V 3.6 24/11/2010 LHC 8:30 meeting

Fill, still in this morning 2:00 Stable beams Initial lumi’s not great 24/11/2010 LHC 8:30 meeting

Injected current going down 24/11/2010 LHC 8:30 meeting

Program Dump(ed) this fill now Physics 121 x 121 Outstanding items Van der Meer scan in the coming days. To be decided when, may be depending on BCTs BGI calibration, 0.5 hour (Mariusz) 24/11/2010 LHC 8:30 meeting