Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Week 13: R. Assmann, J. Wenninger
Floating MD week 28 summary
Ion Commissioning: Thursday & Friday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday Morning – recovery from cryo.
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Plan for 1 m b* J. Uythoven & J. Wenninger
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
Another Immortal Fill….
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven Scrubbing with 50 ns Ion beam commissioning J. Wenninger & J. Uythoven for the operation and commissioning teams 08/11/2010 LHC 8:30 meeting

E-cloud and beam scrubbing End of week 43: Strong vacuum and e-cloud activity with 50 ns beams for trains of 24 and 36 bunches. Trains of 24/36 bunches with 50 ns could not be ramped. Clear need to understand the e-cloud effects and associated vacuum pressure increases. Attempt to scrub (‘clean’) the vacuum chamber with beam. 08/11/2010 LHC 8:30 meeting

E-cloud studies E-cloud studies and scrubbing plan Effect of varying the bunch population for batches of 36 bunches (4E10 to 11E10). Comparison of effect of batches of 12, 24 and 36 bunches. Effect of 2 batches of 24 bunches as a function of the batch separation (from 20 msec to minimum of 225 ns). Vacuum chamber scrubbing with beam of increasing number of batches of 24 bunches. Keep pressures high by adding more beam as conditions improve. Attempt to bring ~100 bunches with batches of 24 bunches to stable beams. 08/11/2010 LHC 8:30 meeting

36 bunch trains Onset of e-cloud/vacuum effects at 6E10 p/bunch. Strong emittance increase along the train. F. Roncarolo 08/11/2010 LHC 8:30 meeting

Vacuum pressure as function of 24 b train spacing 08/11/2010 LHC 8:30 meeting

Emittances for the different bunches (24 b trains) F. Roncarolo 08/11/2010 LHC 8:30 meeting

Vacuum for trains of 24 bunches Cold to warm transition: worst case 2e-6 Sunday: Valves in Tuesday evening with 228 bunches Scrubbing 60 bunches 5e-7 08/11/2010 LHC 8:30 meeting

with ~6 hours of scrubbing Comparison 12 + 36 bunches 31 October: max p @ LSS3 VGPB.5L3.B = 5.5E-7 mbar Gained factor 10 with ~6 hours of scrubbing 03 November: max p @ LSS3 VGPB.2.5L3.B=6E-8 mbar 08/11/2010 LHC 8:30 meeting

Collisions with 24 b per train (50 ns) Last physics fill with 1 + 12 + 4 * 24 = 109 bunches in the night of Wednesday to Thursday. Request by Alice to operate with spectrometer and solenoid off. Strong effect on vacuum in IR2 with magnets off, leading to vacuum interlock when injecting 108b for B1. Field of the solenoid is suppressing e-cloud effects !! Solenoid and spectrometer had to ramped up again to be able to fill (and then ramp). Towards physics Beam lost on 3.5 TeV flat top when switching off transverse damper – beam is highly unstable !! No collisions could be provided – lack of time. 08/11/2010 LHC 8:30 meeting

IR2 pressure variation during injection ALICE ramping up ALICE OFF 08/11/2010 LHC 8:30 meeting

E-cloud studies Dependence of e-cloud/vacuum pressure on number of bunches, bunch intensity and batch separation was measured. Food for models. Improvement of ~ 10 in pressure after around 6 hours of effective beam scrubbing. Input for evaluating length of cleaning periods in 2011… Beams are very unstable, collisions could not be established with 24b trains due to lack of time. 08/11/2010 LHC 8:30 meeting

Expected to quench here Quench test - Monday 1.11 Quench test at 3.5 TeV with wire-scanner Beam of 12x12 =144 bunches with 50 ns spacing. Local / critical BLM thresholds increased. The wire was scanned on B2, slowing down the speed at each scan: 1 ms/s 0.75 m/s 0.5 m/s 0.37 ms/ 0.3 m/s 0.2 m/s 0.15 m/s 0.05 m/s ….. finally quenched D4 ! Loss duration ~ 40 ms. Data analysis ongoing… Expected to quench here 08/11/2010 LHC 8:30 meeting

Thursday 4.11 – switching to ions Morning and afternoon: access and preparation. 18:00 : Ions extracted to TI2/8 downstream TEDs. A bit of steering of the trajectories. No problems. B1 in TI2 before correction (wrt proton reference) 08/11/2010 LHC 8:30 meeting

Thursday PM – ions to the LHC Adjustment of the offsets LHC-SPS to place ions bunch on the MKI of B1. 20:20 First 75+ trajectories in the LHC. B1 turn 1 compared to proton closed orbit – not bad !! 08/11/2010 LHC 8:30 meeting

Circulating B1 20:30-22:00 RF : placing bunch into correct bucket. 22:00 :B1 captured and circulating for many seconds. 01:50 : both beams circulating. B1 ion orbit compared to proton orbit – no steering ! 08/11/2010 LHC 8:30 meeting

B1 (and RF) progress 08/11/2010 LHC 8:30 meeting

Ion Commissioning: Thursday & Friday Optics Checks BI Checks Collimation Checks First Ramp Collimation Checks Squeeze B1 Inj., Circ. & Capture B2 Inj., Circ. & Capture 08/11/2010 LHC 8:30 meeting

No problems (at least for this stage !) Beam instrumentation No problems (at least for this stage !) BPMs, WS, BRST, BCTs, BGI, Shottky, BRANs, FBs etc all working to full satisfaction at this stage of the ion commissioning. 08/11/2010 LHC 8:30 meeting

Friday PM: first ramp – no losses There is light a bit above 0.5 Z TeV Bunch length increasing at injection (IBS), down during the ramp, increasing again at 3.5 TeV (IBS) 08/11/2010 LHC 8:30 meeting

Bunch length – injection ramp P. Baudrenghien et al. Flat top Ramp Injection 08/11/2010 LHC 8:30 meeting

Bunch lengthening at 3.5 TeV 08/11/2010 LHC 8:30 meeting

Loosing from the bucket No losses from the bucket in the first few hours at 3.5 TeV Bunch length Amplitude Length*amplitude Losses No losses P. Baudrenghien et al. 08/11/2010 LHC 8:30 meeting

Injection Injection oscillation corrected on Sunday. Injected ion energy matched to ring using horizontal correctors (Sunday) to improve capture and phase loop transients: +0.25 permill B1 +0.2 permill B2 To be refined if required… 08/11/2010 LHC 8:30 meeting

Optics measurements 450 GeV Optics in good agreement with protons. 08/11/2010 LHC 8:30 meeting

Optics measurements at 3.5 Z TeV, squeezed Again very similar to protons R. Tomas et al. 08/11/2010 LHC 8:30 meeting

Emittances Emittances at injection around 1-2 um (with Pb gamma!). ! Normalized emittances quoted in eLog and WS plots are ~2.5 x larger as they are based on proton gamma ! Emittances on flat top 1.5-3 um Need more experience and stable conditions (collisions) to evaluate blow up. 08/11/2010 LHC 8:30 meeting

Collimation checks at 450 GeV Check collimator alignment at 450 GeV Gap centers checked for 11 collimators per beam. Reproducibility from proton to ion at 0.4 mm level (last alignmnet in May !). Loss maps - betatron cleaning inefficiency: Leakage to dispersion suppressor: 0.5% - 2% Experimental IR's: clean Arcs: 0.1% RF: clean Loss maps - momentum cleaning inefficiency: Leakage to dispersion suppressor: 0.5% - 4% Experimental IR's: 10% (TCTH in IR1, b2), 1% (TCTH in IR5, b1) Arcs: 0.3% RF insertion: 0.5% 08/11/2010 LHC 8:30 meeting

Betatron loss maps – 450 GeV Leakage to DS 08/11/2010 LHC 8:30 meeting

Off-momentum loss maps – 450 GeV Momentum losses B1 -1000Hz (‘covered’ by RF freq interlock) Momentum losses B2 -1000Hz (‘covered’ by RF freq interlock) 08/11/2010 LHC 8:30 meeting

Conclusions from collimation team We loose about a factor 50-100 in cleaning efficiency for ions compared to protons. Expected (ion fragmentation and dissociation) Main losses in predicted locations, namely the dispersion suppressor magnets. At injection a large 10% leakage into IR1 from IR3 losses for beam 2 has been observed for positive momentum errors. It is not clear what ion species escapes IR3 and travels to IR1. To be analyzed in detail. 08/11/2010 LHC 8:30 meeting

Saturday late evening – collisions ! 00:30: Colliding in all IPs with TCTs at 25 sigma. With proton settings for Xing and lumi scan knobs (ALICE separation to 0). 2 bunches / beam. 08/11/2010 LHC 8:30 meeting

Saturday PM – collision setup Xing in ATLAS and CMS to 0. Xing in ALICE to 0 effective Xing angle. External angle -140 urad. Optimized orbit and beam overlap. Luminosity ~ 2 x 1023 cm-2s-1 (1 colliding pair / IP) 08/11/2010 LHC 8:30 meeting

Collimator setup for collisions Round 1 : beam dumped during TCT movement in Pt2. 5 TCTs setup in B1, 3 TCTs set up in B2 Round 2 : all TCTs aligned Sunday 21:00. Round 1 Round 2 08/11/2010 LHC 8:30 meeting

Loss maps in collisions – B1 V 08/11/2010 LHC 8:30 meeting

Asynchronous dump test Looking good 08/11/2010 LHC 8:30 meeting

Stable beams preparation status Collimator loss maps done. Conclusions similar to other maps. Leakage to exp. IRs small. ½ of them still required analysis. Asynch. dump test done. Analysis to be finished. Collimator functions ready. ALICE TCTV setting to be changed to OPEN. IR2 triplet BLM thresholds reduced factor 2 wrt protons. Limited by noise spikes. To be done Length of beam process to go into collisions must be increased. The present length provides only time to switch ALICE from +110 urad to -40 urad. Last -100 urad must be trimmed by hand… 08/11/2010 LHC 8:30 meeting

Coming next Stable beams 2x2 Injection of 4 bunches Stable beams with 17x17 Stable beams with 128x128 08/11/2010 LHC 8:30 meeting