Front end Hybrid Industrial Tester

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Tracker Week April ‘03G.Sguazzoni1 FE hybrid assembly and quality assurance The hybrid team: Alan Honma, Michael Poettgens, Gabriella Pasztor, Bernd Reinhold,
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Power Distribution Studies at Fermilab Aida Todri, FNAL ATLAS/CMS Power WG Meeting March 31 st, 2010.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
National Center for Supercomputing Applications NCSA OPIE Presentation November 2000.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Visual Basic.NET BASICS Lesson 3 Events and Code.
, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
SiPM readout for ECAL Lausanne PEBS ECAL meeting, Lausanne 30. April 2009.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. Vincent Lemaitre tracker week
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Testing Setup Top dark box : Avalanche LED driver, 100ps pulse jitter, Fast response LED Triggering from generator Optical Fibre Bottom Box MCP, TORCH.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Setup for automated measurements (parametrization) of ASD2 chip
M. Manghisoni, L. Ratti Università degli Studi di Pavia INFN Pavia
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
Roberto Chierici - CERN
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Large CMS GEM with APV & SRS electronics
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
Hamburg Bonding Report
Results from module testing
UCSB Testing Status Anthony Affolder
US Module Production Quality
Neurochip3.
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Alberto A. Colavita, INFN, TS
UCSB Short-term Testing Plan
EIC Tracking Meeting, March 26, 2012
Vertex Detector Overview Prototypes R&D Plans Summary.
Anthony Affolder UC Santa Barbara
Environmental Monitoring: Coupling Function Calculator
US Module Testing Progress Report
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
US Module Testing Progress Report
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent.lemaitre@fynu.ucl.ac.be In collaboration with RWTH Aachen (M. Axer, F. Beissel, T. Franke, J. Mnich) IRES Strasbourg (JD. Berst, P. Graehling, P.Juillot, C. Maazouzi) http://www.fynu.ucl.ac.be/themes/he/cms/activities/tracker/hybrids.html Vincent Lemaitre tracker week 29.01.03

Current measurements ARC FHIT Comparisons between FHIT & ARC & CMS-like : FHIT does not send triggers while measuring current consumption whereas ARC and CMS-like system do ARC FHIT This problem is solved : FEH needs more current when triggered

Electrical Test: limits From statistics on FHIT measurements intervals = [m-3s; m+3s] where m is the mean of distribution and s the RMS I125 one APV biased Vmin [42 ; 78 ] mA Vnom [48 ; 84 ] mA Vmax [52 ; 88 ] mA I250 one APV biased [220 ; 320 ] mA [300 ; 400 ] mA [320 ; 420 ] mA These limits can be resized with a multiplicative parameter, common for all limit values (available in configuration file).

Functional Test: limits Mux test maximal height 255.0 ADC (Mux output signal height) minimal height 200.0 ADC minimal difference 5.0 ADC Pedestal test number of events 1000 cut window (20 % around the mean) 20.0 ADC Noise test Same data as pedestal test cut window (around the mean) minimal noise cut 0.2 ADC maximal noise cut 1.5 ADC Gain test minimal threshold These are the ARCS parameter All these limits are accessible in the configuration file

FHITS 1.3 New : version 1.3 (updated interface, as asked by industry) Display the # of good and bad hybrids of the current day All part-numbers accepted 1663  1674 (new firmware)

Conversion to XML conversion to XML : direct contact with CERN people to fit to their wishes C – routine being written in Louvain ; not necessary @ industry proposed scenario production and tests @ industry ( logfile creation ) delivery @ CERN of hybrids and logfiles (on CD-R) 1 delivery = # FEH + 1 CD (+ copies) tests @ CERN (with FHIT  logfile creation) creation of XML files (by running the C – routine) @ CERN transfer to database

Number of FHIT set-ups Laboratory Presently In Addition With ARC in CERN 1 mono-FHIT Yes Industry 1 (CT) 1 dual-FHIT No Industry 2 (1 dual-FHIT) Strasbourg 1 mono + 1 dual Aachen Louvain Spares 2 dual-FHIT Yes/No TOTAL 5 boxes + 8 PCBs 3 add. ARC boards

Test procedure @ Industry @ CERN To be tested Test setup A M T E C S A M T E C N A I S N A I S E R N I E R N I FHIT To be tested Test setup Industry 1: Naked hybrids (w/o APVs) Industry 2: Hybrids Before bonding pitch adapter  LINK to DB (XML) @ Industry @ CERN

Mechanics New mechanics : -Easier to handle -Insure thermal contact (“cooling”) -Probe for test of bias return line Heavy cover with auto-retractile probe Pad on hybrid for test of bias return line Hybrid Fine positioning plugs Cooling contact

Summary Difference between set-ups for Current Measurement is understood First estimate of Limits for ET and FT have been evaluate (to be continued) Most recent release of software distributed (FHITS 1.3) -improved display -all part number included (firmware) Agreed procedure for loading FHIT data into DB (almost operational) Proposal for the number of FHIT set up Test procedure including thermal contact of hybrid and test of bias return line.