Robert Karas and Frank McCloskey

Slides:



Advertisements
Similar presentations
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Advertisements

Week 1 intro to PM Project Management Introduction to Project Management and the Software Development Lifecycle Week 1 Winter quarter 1/7/02 SOS.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Catheter Tube Assembly Process
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
Inflating Padding Antifracture Girdle
Project Status Report Presenter Name Presentation Date.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Darren Jordan Adam Huck Daniel Ortiz September 22 nd, 2010 Our design is to install an automated fire suppression system in a vehicle and in the act of.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Project Goals Design and build a fully submersible robotic fish platform powered by McKibben muscles Execute realistic fish motion with a fish-like appearance.
Group 18 Chen Zhang Client: Professor Frank Yin Sept. 30, 2015 Smart Walker Project PRELIMINARY PRESENTATION.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Mapping Formal Methods to NASA Capability Needs Template Slides.
ETEC 4301 Design Lab Jacob Ison Solar Energy and The Family Farm: The Mid-Semester Edition!
Project Management PTM721S
Under Pressure: Pressure Ulcer Reducing Device
IT Strategy Building Blocks - Strategy Map Approach
Infant CPAP Breathing Apparatus Design
Pressure Ulcer Reducing Wheelchair Pad
Systems Analysis and Design in a Changing World, 4th Edition
Overview of Project Planning
Nodal Status Report: Program Controls Update
Robert Karas and Frank McCloskey
A Novel Approach to Treating Pressure Ulcers
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
P07203 Dynamometry Laboratory Infrastructure
A novel approach to treating pressure ulcers
Initiative Name Initiative Leader Target Go Live Date: Reporting Date
[Project Name] Post-Mortem
PROJECT NAME POST-MORTEM
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Tree Limbing and Harvesting ROV
Overall Project RAG Status
Group 14 SmartGLove Software design
Insert subhead here Project Status.
Training of Process Facilitators
Pressure Ulcer Reducing Pad : Under Pressure Pad
“Fold-and-Go” Legends: Overall Status:  
Figure 3: Risk Analysis Model
Inflating Padding Antifracture Girdle
NGN Project Status – SE2 Conversion (6th-8th Jan 2017) 14th Dec 2016
Rob karas, corina Malone, frank mccloskey, Jacob dodman, bobby lorenz
[Project Name] Post-Mortem Presentation Template
Project Name Post-Mortem
SmartMeterTM Steering Committee Update – July 2012
What would improve the RAG status when amber or red
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
What would improve the RAG status when amber or red
Overall Project RAG Status:
Daresbury ESS In-Kind Contributions
Type Name 2016 Air Force Art Contest Presented to
Overall Project RAG Status:
Overall Project RAG Status:
XRN4361 – UK Link Future Release 2
XRN June 19 Release - Status Update
XRN4361 – UK Link Release 2 - Delivery
Project Progress Summary - Week 18
Remote Sensor Interface for IoT
Project Overview.
Reporting Status or Progress
Schedule (Major Deliverables and Milestones)
XRN4361 – UK Link Release 2 - Delivery
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
XRN June 19 Release - Status Update
XRN June 19 Release - Status Update
PROJECT NAME YOUR LOGO PROJECT CODE: PROJECT MANAGER: DATE OF REPORT:
Key Activities/ Milestones
Presentation transcript:

Robert Karas and Frank McCloskey Under Pressure Robert Karas and Frank McCloskey Key achievements in the last two weeks Remote was connected to the Arduino Code was programmed to target specific bladders Testing of pump capability Integration of valves into the design Project Metrics Status Budget Schedule Communication Contribution Overall Status: G O G G G Project milestones Target date Expected completion Final Prototype 03/16 03/23 Device testing & Modification 03/26 03/31 Poster Design 03/20 4/5 Key actions planned for the next two weeks Formal testing of bladders Fabricate air splitter for the pump Incorporate Force Sensors into design Fabricate seat with layers of foam integrated Key Discussion Areas Testing of device Key risks / issues / scope changes New Hoses for connections Remote is IR, so box will have to be transparent or designed that sensor is able to be targeted Battery Major issues Some issues Satisfactory R Completed In Progress  Legends: O G