HUD SMAC Conference November 7, 2017

Slides:



Advertisements
Similar presentations
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures OCC – Chapter 6.
Advertisements

The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures HBA – Chapter 6.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Cultural Resources Categorical Exclusion Training Class.
The Lifecycle of Grants: Environmental Review November 7, 2012.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
1 CDBG and Environmental Review For Grant Administrators.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
HUD ENVIRONMENTAL REVIEW ONLINE SYSTEM HEROS Kathryn Au September 17, 2013.
 WELCOME  Welcome to the home page for the Louisiana Mapping Project (LaMP). The LaMP effort is being undertaken by Department of Homeland Security’s.
HUD Environmental Review Requirements November 30,2010.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
USAID Africa Bureau EIA Procedures for Sub-Projects
2009 CDBG/CHIP Recipients’ Workshop Welcome to the COMPLIANCE SESSION ENVIRONMENTAL REQUIREMENTS Afternoon session will cover new CHIP FEDERAL LABOR STANDARDS.
2011 CDBG Recipients’ Workshop COMPLIANCE 9:30EnvironmentalRick 10:30BREAK 10:45Wage Rate ProvisionsMary Alice 11:00Uniform Acquisition Robert 11:15Conflict.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
The National Environmental Policy Act (NEPA)
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
Sacred Sites. Documentation Documentation: Forest Supervisor or Ranger District Offices may document Sacred site (s) information in a variety of ways.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Office of the Vice Chancellor for Research 1 Update on PHS New Rule on Financial Conflicts of Interest (FCOI) Presentation to Business Managers January.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Environmental Review Process for Responsible Entities 24 CFR Part 58 NEIGHBORHOOD STABILIZATION PROGRAM.
Brownfields and Community Gardens. Purpose  The purpose of this presentation is to provide an overview of the Brownfields Program and how it can service.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
1 CDBG and Environmental Review For Local Officials.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Categorical Exclusion Training Class
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Section 232 Environmental Review Handbook Chapter 7.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
3 CDBG Disaster Recovery Waterway Debris Program Wednesday, January 13, 2010.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
FCC’s NEPA Process Overview of NEPA Overview of NEPA Overview of FCC’s NEPA rules and procedures Overview of FCC’s NEPA rules and procedures Nuts and bolts.
ASTM Standard Practice for Assessment of Vapor Intrusion Into Structures on Property Involved in Real Estate Transactions: Status Report presented by Anthony.
Post-Secondary Transition
HUD Environmental Review Online System
Update on the Latest Developments in Government Auditing Standards
Anna Preston Vance, HA of Paris
ACA Conference - September 2017
American Indian and Alaska Native 2020 Decennial Census
HUD REQUIREMENTS FOR DEVELOPING A HOUSING COUNSELING WORK PLAN
Grants Management 101 Part A
National Environmental Policy Act (NEPA)
Environmental Prequalification Requirements
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Engineering Waiver Management
Regulated Materials Review
Cultural Resources Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Post-Secondary Transition
Environmental Commitments
The National Environmental Policy Act (NEPA)
NEPA Assignment Program Overview
Project Manager / Utility Liaison
Presentation transcript:

HUD SMAC Conference November 7, 2017 Environmental Session Topics Environmental Review resources on HUD Exchange Who are the Region IV Environmental Clearance Officers (ECOs) and when do they become involved? Difference in a Phase I ESA and a NEPA EA ERR Do’s and Don’ts Questions?

Region IV –OEE Team Sandy Frye, Regional Environmental Officer - KY Tel: 678-732-2727 Email: Sandra.l.frye@hud.gov Al Cazzoli, Senior Field Environmental Officer - South FL, PR Tel: 305-520-5005 Email: Ubaldo.A.Cazzoli@hud.gov Ramona McConney – Field Environmental Officer - GA, MS, AL Tel: 678-732-2394 Email: Ramona.K.McConney@hud.gov Chuck Melton – Field Environmental Officer - TN, North FL Tel: 678-732-2133 Email: Chuck.A.Melton@hud.gov Len Smith – Field Environmental Officer - NC, SC Tel: 336-547-4000 ext. 2054 Email: Lenwood.E.Smith@hud.gov

Resources for FHA Part 50 Environmental Reviews HEROS Partner Worksheets: https://www.hudexchange.info/resource/5119/environmental-review- record-related-federal-laws-and-authorities-partner-worksheets/ HEROS Environmental Assessment Format: https://www.hudexchange.info/resource/5173/part-50-environmental- assessment-format/ MAP Guide: http://portal.hud.gov/hudportal/documents/huddoc?id=4430GHSGG.pdf HUD environmental website: https://www.hudexchange.info/programs/environmental-review/ Online Training: “Environmental Training for FHA Programs” https://www.youtube.com/watch?v=koGldiHziVI&list=PLDYbj6cykYZ_iPeN__vJfE QDI4c6m5MVY

When is the HUD Environmental Clearance Officer (ECO) review required? 24 CFR Part 50.32 …(NEPA) Assessments for projects over 200 lots/dwelling units/beds shall be submitted to the ECO for review and comment or in their absence the Program ECO (i.e. PECO). MAP Guide at 9.2.B.4… REO/FEO (aka ECO) must be given opportunity to comment on Categorically Excluded (CE) projects: Located in the normally unacceptable or unacceptable noise zone Requiring an Environmental Management and Monitoring Plan ECO Review is recommended for CE projects requiring special analysis with any 50.4 laws and authorities. Refinance … HUD-insured mortgages that do not involve new construction or rehabilitation other than routine maintenance do not require an environmental review however must meet flood insurance requirements in 50.4(b)(1).

When do ECO’s typically start the review process? It is never too early to contact the ECO! ECO should be invited to Concept meetings for projects involving: LIHTC’s Floodplains or Wetlands Historic preservation and; Known contamination issues Staff also encouraged to contact the ECO for technical assistance prior to submitting the completed EA

What is the timeframe for the ECO review and comment period? Draft Part 50 guidance proposes the following: Once a complete review is submitted in HEROS, ECO will have 15 calendar days to review and comment If ECO identifies deficiencies or is unable to verify compliance due to missing information, he/she will return to preparer for revision The 15 day clock restarts upon resubmission in HEROS

NEPA Environmental Assessment vs Phase I Environmental Site Assessment Purpose of a Phase I ESA is to… Make initial determination as to the presence of hazardous substances in accordance with ASTM E1527-13. Determine if there are Recognized Environmental Conditions (RECs) that warrant further investigation (i.e. a Phase II). Document compliance with 24 CFR Part 50.3(i) – all properties proposed for use in HUD programs must be free of hazardous materials, contamination, toxic chemicals and gases…where a hazard could affect the health and safety of occupants or conflict with the intended use. Documented in HEROS under Contamination…

NEPA Environmental Assessment vs Phase I Environmental Site Assessment Purpose of a NEPA Environmental Assessment is to … Insure environmental information is available to public officials/citizens before actions are taken. Identify reasonable alternatives and minimize adverse effects. Help public officials make decisions based on understanding all of the potential environmental consequences to the human environment; and Decisions must be based on information that is of high quality, scientifically accurate, and by qualified data sources. Documented in NEPA EA factors section of the environmental report (see MAP Guide 9.5.Q) and in HEROS.

What do NEPA EA Factors cover? EA Factors include… Land Development Socioeconomic Community Facilities and Services Natural Features See HUD Exchange EA Factors Guidance: Link: https://www.hudexchange.info/resource/3306/environmental-assessment- factors-guidance/

NEPA Factors in HEROS

What is a complete NEPA environmental review? A complete NEPA EA review must include: Detailed project description and justification Map clearly outlining proposed building site and property boundaries Documentation verifying compliance with 50.4 laws and authorities Documentation supporting EA factor compliance EA Analysis including Cumulative Impacts, Alternatives, etc. Housing requirements: Phase I meeting ASTM E1527-13 standards, Phase II, etc. Lead-based Paint, Asbestos, Radon, Additional Nuisances and Hazards Other applicable MAP Guide requirements Must be signed by HUD Supervisor

What constitutes the “site” for environmental review? NEPA…must consider the “project as a whole” and address Cumulative Impacts (direct and in-direct) which can impact off site areas. MAP Guide 9.5 E. Floodplain management… if any part of the site or integral off-site development is located in the 100-year or 500-year for critical actions the project must comply with HUD’s floodplain management regulations. MAP Guide 9.5.D. Historic Preservation…must consider the Area of Potential effect (APE) which is not just the site but can include several blocks beyond the site boundary.

Do’s and Don’ts… DO Provide a detailed project description Provide legible maps with site boundary clearly marked Provide references including specific page numbers Provide information in electronic form i.e. Drop box, etc. For Site Contamination site relevant MAP Guide references

Do’s and Don’ts… DON’T Provide unnecessary documentation (quality vs quantity!) Include non-scope items in the Phase I Make vague references such as “See Phase I” Complete the 8-step public notices prior to HUD approval Send Tribal Consultation letters directly from consultant (must be sent on HUD letterhead and signed by HUD Official https://www.hudexchange.info/resource/4484/hud-memo-section-106-tribal- consultation-in-projects-reviewed-under-24-cfr-part-50/

Questions?