ATLAS Upgrade R&D and Plans

Slides:



Advertisements
Similar presentations
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Advertisements

Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Planning for the SLAC ATLAS Program Page 1 Planning for the SLAC ATLAS Program D. MacFarlane Deputy ALD for PPA.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
June 11, 2009The SLAC ATLAS Program: Upgrade R&DPage 1 ATLAS Upgrade R&D and Plans Su Dong DOE proton review: SLAC ATLAS program Washington DC June 11,
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Roger Rusack – The University of Minnesota 1.
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
CERN, Main challenges for the ATLAS upgrade project in the coming year.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
M. Gilchriese ATLAS Pixel Upgrade Thoughts on US Role.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
ATLAS Trigger Development
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades Jan 2005 Lawrence Berkeley Lab Welcome.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Muon Upgrade Meeting ( ) – P. Campana Since our last discussion : - CB decision to prepare a LOI for an Upgrade of LHCb (approx 100 pages, 10 for.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Technology and R&D Summary and next steps Burkhard Schmidt.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
For the CMS Pixel detector
SVT – SuperB Workshop – Annecy March 2010
Detector building Notes of our discussion
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
June 22, 2017 Burkhard Schmidt for the DT coordination team
Hybrid Pixel R&D and Interconnect Technologies
L1Calo upgrade discussion
Upgrade Tracker Simulation Studies
SiD Calorimeter R&D Collaboration
ATLAS L1Calo Phase2 Upgrade
TK Upgrade report.
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
CO2 cooling requirements for the IBL
SLHC Non-Inner Detector Upgrades
Status and Prospects of Tracker Services Hans Postema (CERN)
Tracking in SuperLHC 1. Radiation damage
The LHCb Front-end Electronics System Status and Future Development
For the CMS Pixel detector
Presentation transcript:

ATLAS Upgrade R&D and Plans Su Dong July 7, 2008 SLAC Annual Program Review

Meeting the Challenge of superLHC Luminosity 1034->1035 gives ~40% higher effective energy reach for new physics 2013: Pixel b-layer replacement 2013-15: Improved L1 Trigger 2016 superLHC: New Si tracker for SLHC Trigger DAQ upgrade LAr and Muon upgrades Intense radiation environment: ~2x1016 P/cm2 (10yr@1035) at R=4cm Dramatic pileup background: ~400 interactions/crossing July 7, 2008 SLAC Annual Program Review

SLAC Involvement in superLHC Upgrade superLHC is probably an inevitable path for HEP: Early discoveries would imply the effective extra energy reach at high lumi could uncover additional new particles. Given the present investment, SLAC should continue to sLHC, with complementary physics to Linear Collider. If early phase of LHC not revealing new physics, it would be hard to argue for ILC as is or other new facilities. sLHC will be taking on an even central focus of hope for new physics through its effective additional energy reach. The time to be involved is Now. Schedule for upgrade design and construction is already not optimistic. With the end of B-factory operation and launch of GLAST, this becomes a natural interest among many staff members. The upgrade activities at SLAC will be a key addition to better utilize the SLAC resources and expertise to complement current ATLAS efforts. The joint activities of physics, operations and upgrade will combine to a role appropriate for a national lab and encourage growth of user presence at SLAC. Important detector training ground for postdocs and students. July 7, 2008 SLAC Annual Program Review

sLHC Tracker Upgrade: Introduction The entire inner detector of pixel+SCT+TRT will be replaced with an all silicon tracking system for sLHC: Inner most pixel layer(s) need new sensor technology Outer tracking with short and long silicon strips Increased granularity for higher particle density demands new approaches to cooling, power deliver, data transmission. Aiming at lower material budget. SLAC has silicon experience from MK-II, SLD (pixel), GLAST and future silicon detector design of SiD. Long strip Short strip Pixel (from a early SLAC study of strawman07 layout) July 7, 2008 SLAC Annual Program Review

Tracker Upgrade: 3D Sensor for pixel 3D Sensor technology pioneered by Sherwood Parker et al is a primary candidate for inner most pixel layer: Radiation hardness Active Edge The 3D R&D devices are produced at the Stanford Center of Integrated Systems. Future ATLAS 3D sensors designs are also expected to have test samples from Stanford first for testing before production at SINTEF. SLAC is participating in the Jun-Jul/08 3D beam test at CERN, and performing 3D sensor simulation. SLAC is developing upgrade pixel teststand with compatibility to current and future ATLAS pixel readout electronics. Ideally located for first testing of 3D devices from Stanford. Preparing proposal to join the 3D sensor collaboration. July 7, 2008 SLAC Annual Program Review

Tracker Upgrade: CO2 Cooling (I) The commissioning of the current evaporative C3F8 cooling system has been a rather difficult experience. Cooling becomes a central focus for the larger and higher granularity silicon system for sLHC with bigger challenge to avoid thermal runaway. CO2 cooling is widely perceived as a better alternative to the current C3F8 cooling system and already chosen as baseline for strip detector upgrade. High latent heat and high heat and high vapor pressure allow efficient heat transfer with smaller pipes for reduced material. Also a more environment friendly solution. Despite the priority and broad interests, very little has happened on CO2 cooling. More practical for a national lab. SLAC engineer Marco Oriunno visited NIKHEF, CERN LHCb CO2 cooling system to engage in cooling system design for ATLAS. CO2 cooling is also the new trend in industry and synergy with particle-astro applications. July 7, 2008 SLAC Annual Program Review

Tracker Upgrade: CO2 Cooling (II) SLAC’s plan for CO2 cooling involvement: Step 1: Build an open loop small refrigeration system to study basic design features Step 2: Serve the detector mechanical prototype cooling tests to iterate on design choices for piping/fitting and the overall system. Step 3: A small pilot cooling plant at SLAC to serve stave tests and develop/validate the overall cooling system design. SLAC is geographically well situated between LBNL and Santa Cruz as a center for the various cooling related tests for both pixel and strip detectors. It’s a natural gateway to broader involvement in mechanical system designs. July 7, 2008 SLAC Annual Program Review

Tracker Upgrade: Data Transmission The high hit density and high radiation at sLHC poses new challenges to data transmission. Current pixel optical data transmission elements will not survive sLHC radiation dose, and even more difficult to work for the colder operating temperature of -350C expected from CO2 cooling. SLAC is leading the alternative technology R&D with multi-Gb/s electrical transmission through microCoax cables. Already demonstrated 4Gb/s on a rad-hard microCoax with bit error tests on FPGA test boards. Doing radiation tests on better dielectric sample to validate a custom design with more favorable material budget and even better transmission bandwidth. => See Martin Kocian’s breakout session talk for details. July 7, 2008 SLAC Annual Program Review

Tracker Upgrade: Teststand/DAQ Teststand will be a central point of integration to investigate designs and execute production. A versatile and performant test system is essential. SLAC has current pixel Turbo DAQ system running and helping on improving the LBNL strip stave teststand DAQ. Investigating a teststand system with more on board processing power to speed up tests. Multi-channel readout for stave tests and cosmic telescope. Thinking more generally to serve pixel and strip tests with the evolution to new Read Out Driver in mind. Based on extensive DAQ design experience at SLAC. July 7, 2008 SLAC Annual Program Review

Upgrade Tracker: Strip Stave Design The development of the strip detector barrel stave is one of the most central tasks in tracker upgrade. The Jun/08 stave review at CERN selected the stave concept pursued by Carl Haber et al at LBNL based on CDF runIIb upgrade with lower mass and more advanced electrical integration. Dave Nelson from SLAC has been helping on teststand DAQ improvements and other electrical integration issues. SLAC is interested in becoming a significant partner in the strip stave effort. Besides the electrical integration and testing, another possible area of contribution is mechanical design and testing in concert with the CO2 cooling development. Based on SiD and past silicon experience and well located between LBNL and Santa Cruz. July 7, 2008 SLAC Annual Program Review

Pixel B-Layer Replacement Before superLHC, pixel b-layer is expected to reach its radiation dose limit by ~300fb-1, so that a replacement needs to be planned for 2012. Can no long do simple b-layer replacement with <9 months shutdown. The b-layer task force reached recommendation for an insertion of new b-layer inside present detector on a smaller beam pipe. Requires some of the new technology for sLHC upgrade to be ready in time for this to be viable. SLAC may naturally become part of the project if seriously moving ahead. July 7, 2008 SLAC Annual Program Review

Tracker Upgrade: Simulation and Layout The tracker design layout is a central activity which critically relies on simulation. The local design choices also inevitably rely on simulation for selecting optimized choice. The upgrade simulation has become a universal source of frustration due the inflexibility for introducing new geometry and heavy CPU demand. The LCsim framework developed at SLAC for Linear Collider Detector designs, has very flexible and simple geometry input for producing fast design studies. We are investigating a strategy to significantly improve the simulation utilities for ATLAS upgrade leveraging the strong simulation expertise at SLAC. July 7, 2008 SLAC Annual Program Review

Trigger/DAQ: Current system July 7, 2008 SLAC Annual Program Review

Trigger/DAQ Upgrade: Introduction Trigger/DAQ upgrades/improvements are inevitable for ATLAS like every other experiment, but people are very busy with current system so far. Known prospects at Phase 1 (by 2013) some L1 improvements Calo, Muon, Central trigger Level 1.5 Fast Track Trigger Known prospects for Phase 2 (by 2017) Rebuild of many frontend electronics to allow more L1 improvements with longer latency ROD/ROL/ROB/ROS rebuild to improve bandwidth L1 track trigger ? Allow L1 rate to go >100KHz beyond the baseline ? Must decide soon or upgrade tracker design may prohibit this. July 7, 2008 SLAC Annual Program Review

Trigger/DAQ Upgrade: New Readout System Current Read Out Drivers (ROD) have 7 different flavors for different subsystems, which no one is proud of. They cannot last 10 years. The Read Out Link (ROL) limits L1 rate to <100Khz. Mike Huffer (SLAC) has a draft proposal to condense the entire ROD/ROL/ROB/ROS system into one layer of new ATCA (Advanced Telecommunications Computing Architecture) based readout system: Reduces 932 RODs-> 234 ROMs Can absorbe L2supervisor and ROIB as well Improving bandwidth to L2/EF from 8GB/s -> nx45GB/s. More intriguingly, the improved local density and high bandwidth of inter-module data availability is what one looks for in an ideal trigger system. Based on extensive DAQ experience at SLAC and the Petacache project for fast random data access. July 7, 2008 SLAC Annual Program Review

Trigger/DAQ Upgrade: New Readout Crate July 7, 2008 SLAC Annual Program Review

Trigger/DAQ Upgrade: Petacache system Prototype Petacache system Rear Transition Module Reconfigurable Cluster Element (RCE) module ATCA crate Cluster Interconnect Board July 7, 2008 SLAC Annual Program Review

Synergy between Projects The choice of projects had the efficient use of lab resource in mind to best utilize our expertise: CO2 cooling, data transmission, teststand/DAQ are relevant for both strip and pixel detectors. Teststand/DAQ, Gb/s transmission, Trigger/DAQ upgrade are based on the general Trigger/DAQ experience. We strongly believe in the need to open up L1 bandwidth and working on the two key enabling aspects: tracker data transmission and DAQ upgrade. July 7, 2008 SLAC Annual Program Review

SLAC Annual Program Review Summary and Outlook We have identified many interesting directions making significant contributions to the ATLAS upgrades and started some detailed R&D and design. We believe these directions speak to the real needs to complement existing upgrade effort. There are strong synergies among the investigated projects to maximize utilization of SLAC expertise. We intend to keep the broad vision of the overall ATLAS upgrade needs and pay attention to system design issues. We believe SLAC can play a major role in the ATLAS upgrade. July 7, 2008 SLAC Annual Program Review