:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
Coordination: G. Arduini, E.B. Holzer, J. Jowett
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Tuesday 22nd January - morning
Monday 6th August & night
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
LHC progress report Week
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10/5 Cryo recovery until 18:30
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Summary week 18 Intensity ramp up & production
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 10th December - morning
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday 26 November 2011.
Tuesday
Presentation transcript:

LHC Morning Meeting - G. Arduini Fri 8/2 Fill 3538 ongoing since 02:57 with ALICE head ON and ATLAS/CMS/ LHCb at 1% of their peak luminosity End of fill at 12:58 (when we were just about to dump…)  BPM in LSS6 ALICE has now reached about the SAME INTEGRATED LUMINOSITY AS ATLAS/CMS 23/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fri 8/2 During the fill ALICE asked to investigate spikes observed in luminosity  nothing observed on BLM, BBQ, some tune trims done Finally ALICE realized that the problem is related to the detector 23/11/2018 LHC Morning Meeting - G. Arduini

Investigations on beam dump #3536 (P.B.) On fill 3536 the B2 frequency was 400.789729 MHz before cogging and the locked freq was set at 400.789676 MHz. So the B2 freq (red trace) had to be decreased by 53 Hz at the rate of 1 Hz/s, plus a series of WAIT programmed in the sequencer. By the time the two rings were at the common frequency the Crossing Point had moved PASSED the detector (undershoot in green trace)...The Cogging therefore moved them back by FURTHER DECREASING the p frequency (VCXO in blue trace) resulting in an excessive displacement and dump. 23/11/2018 LHC Morning Meeting - G. Arduini

Investigations on beam dump #3536 (P.B.) We have been more lucky on fills 3537 and 3538 as the common frequency was changed by +4 Hz and we just made it. However the displacement is much larger for B2 than B1. The Pb arrive at flat top, almost on collision orbit (see Fill3538). To give more margin: The common freq is further increased to 400.789682 Hz. That will make the displacement B2 smaller and B1 larger, and the displacement to off-centred orbit starts at a larger offset from the desired intersection point. 23/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fri 8/2 14:00 Injecting for VdM scan in ATLAS and LHCb Satellite population reduced as compared to previous VdM scan (thanks T. Bohl!!) Fill 3540 Fill 3537 23/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fri 8/2 – Sat 9/2 16:45 STABLE BEAMS #3540. Start of VdM scan in ATLAS 18:30 VdM Scan in ATLAS completed. Start wit LHCb 18:42 RQX.L8 trip. End of fill #3540 RQX.L8 QPS trigger (heaters fired) due to faulty instrumentation related to voltage tap V1 B of current lead 2. Error not related to protection crate working and reacting correctly. DFBX instrumentation to be checked  Access In the shadow replacement of CPU (second time) on RF crate used for synchronization 22:27 End of access: QPS piquet left point 8. a pin on the current lead cable was found faulty (weak connection) 23:47 IT.L8 cryogenics OK. Pre-cycle 02:42 STABLE BEAMS #3541 07:45 Beam dump BPM LSS6 Persistent problem with RF synchronization front end 23/11/2018 LHC Morning Meeting - G. Arduini

Stable Beams Statistics Fill Day Peak L [1028 cm-2s-1] Stable beam [h] Int L [nb-1] Dump reason # bunches [Pb/p] 3523 Mon 4/2 7.2 4:22 0.74 BPMs IP6 192/216 3524 7.4 3:14 (+0:33) 0.43 3525 10 2:09 0.64 Trip of RQTL9.R3B2 338/338 3527 Tue 5/2 1.04 3529 2:08 S12 trip 3533 Wed 6/2 10.7 3:57 1.09 BPMS IP6 3534 11.5 5:03 1.28 3535 Thu 7/2 10.2 5:07 1.33 SIS orbit correctors (EoF test) 3537 5:16 0.8 (VdM) 314/272 3538 Fri 8/2 9.6 10:00 1.98 (ALICE only) 3540 8.5 1:57 0.5 (VdM) RQX.L8 3541 Sat 9/2 11.6

LHC Morning Meeting - G. Arduini Plan Next fill VdM scan in LHCb with standard filling scheme. Physics 23/11/2018 LHC Morning Meeting - G. Arduini

1.38 TeV p-p run End of pPb physics at 06:00 (if fill lost after 03:00 go for dry run/pilot cycle) Access to set-up for the higher intensity  ~ 2 h (starting between 7 and 9 AM) BPMS IP6 (high intensity protons), BBQ, Head-Tail, etc ADT settings for high intensity (HW SR4) and possibly attenuator change (piquet) Re-activate RF hardware interlock on total voltage (can be done before during ramp down) – possibly today Reverting ALICE polarity (LHCb polarity already good) Revert BLM MFs Revert BTVDD delay settings ATLAS Pre-cycle ~ 1 hour 1 cycle with probes for checkout, correcting chroma and tune, verify instrumentation and damper set-up (4 hours) Testing of interlock BPMS (~2 hours) Loss maps at injection and asynchronous dump (4 hours)

1.38 TeV p-p run 1 cycle with 3 nominal bunches for collimator setup (TCTs), collision setup, first loss maps & asynch. dump test in collision. (4-5 hours+ RP set-up if approved) BSRT (B2) and beam dump checks with high intensity and LBDS check (B1) in parallel (5 hours) 2 cycles to complete off-momentum/betatron loss maps  (8 hours).

1.38 TeV p-p run Intensity ramp-up 1 fill with ~80 bunches 1 fill with ~500 bunches (including some individual bunches for VdM scans) 1374 bunches Need to define filling scheme for 500 bunches

Validation tbd=to be done Injection (Inj. Prot. IN) Injection (Inj. Prot. OUT) Flat-top separated Un-Squeezed Collision Betatronic-H tbd Betatronic-V Neg. off-mom -- tbd (+500 Hz) Pos. off-mom Asynch dump tbd=to be done

Pending Accesses for quench test: Scope installation in IP6 (12L6). 2 hours. It has priority over Q6L8 scope installation because we will need it on Monday morning (the first quench test). To be confirmed whether it can be done before high intensity tests/pp physics at intermediate energy Fast measurement system on RQ6.L8 (30 min in the UA83 by Jaromir Ludwig). Ramp to 300 A afterwards. LBDS check (E. Carlier – working hours) if in the shadow of another access