Fri 15th – Sun 16th June Friday Saturday Sunday Monday

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary week 23 Luminosity production
Week 32 Started with luminosity production…
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Summary week 18 Intensity ramp up & production
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Tue/Wed 12/ :00 Probe beam back again
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Fri :52 Stable beams fill #2536
Thursday
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Tuesday
Tuesday
Presentation transcript:

Fri 15th – Sun 16th June Friday Saturday Sunday Monday 02:42 Stable beams #2733. Initial lumi: 6.7e33 cm-2s-1 15:54 Beam dumped, triplet RQX.L2 tripped. Delivered lumi 183 pb-1 17:30 MKI temperatures ok, waiting on EPC and precycle RQX.L2 19:45 Injection septum is misbehaving, getting FMCM RMSI.R8B2 Injection problems, longitudinal and transverse 22:50 Stable beams #2734. Initial lumi 6.3e33 cm-2s-1 Saturday 14:24 Beam dump by OP. Integrated lumi 204 pb-1 14:59 MKI8 at 105% of interlock level. Need to wait… 20:10 Stable beams #2736. Initial lumi: 6.5e33cm-2s-1 Sunday 13:40 Dump fill #2736. Integrated lumi 233 pb-1. 14:30 Waiting for injection kickers to cool down. Integrated lumi for 2012: 6.5 fb-1 20:57 Stable beams #2737. Intial lumi 6.1e33 cm-2s-1 22:30 Holland dumped. Germany and Portugal inj. into quarter finals. Monday 00:34 Beam lost RF line 2B2. Lumi 66 pb-1 Kickers cooling down. ATLAS water leak, access. 05:15 Injecting again. MKI B2 vacuum interlock, looks like e-cloud again. 18/06/2012 LHC 8:30 meeting

Integrated performance and main ‘worry’ Injection kicker temperature over the week All time high in temperature = All time high in performance = All time record in waiting for cool down between fills 70 C 60 C 18/06/2012 LHC 8:30 meeting

Beam Intensities and Lumi over the week Stable performance 2e14 Mixed bag Stable performance 6e33 18/06/2012 LHC 8:30 meeting

51 % of time in stable beams; total of 1.3 fb-1 in one week ! Overview of fills Fill Duration Ibeam Lpeak [e30 cm-2s-1] Lint [pb-1] Dump 2723 2:26 2.03E+14 6406 46.06 Trip of ROD.A81B1, SEU? 2724 1:13 6329 25.905 Electrical perturbation 2725 7:04 2.05E+14 6520 115.5 Trip of S81 2726 8:58 6499 142.5 Elecitrical perturbation, FMCM 2728 11:41 2.06E+14 6525 171.5 Operator dump 2729 3:28 6502 67.7 BLM self trigger 2732 1:52 6592.5 40 QPS trigger RQX.R1, SEU? 2733 12:34 6674 183 Triplet RQX.L2 tripped. 2734 15:33 2.01E+14 6257.5 203.5 2736 17:29 2.02E+14 6465.5 233 2737 3:36 1.99E+14 6021 66.1 RF Trip 2B2 Tot 51.1% 1301 51 % of time in stable beams; total of 1.3 fb-1 in one week ! 18/06/2012 LHC 8:30 meeting

Overview of main ‘down time’ MKI waiting for cool down 13 h 40 min Injectors 6 h 30 min Waiting for experiments 3 h 28 min Others (> 1h) 7 h 51 min Total 18.7 % ‘down time’ 18/06/2012 LHC 8:30 meeting

Total lumi: > 6.5 fb-1 (ATLAS) Could not access the CMS plots…. 18/06/2012 LHC 8:30 meeting

Start of the week Monday 11th June LHCb Polarity Monday morning first thing – Polarity back to negative Test ramp to centre collisions with 24 bunches Results very reproducible Could consider skipping the test ramp… No problems due to LHCb polarity change SPS beam quality Already on Monday problems with SPS beam quality Filling not smooth due to various BQM interlocks in SPS (bunch length, bunch peak, satellites, pattern) Problems with SPS beam quality continued throughout the week Only minor effect on LHC peak luminosity Bunch intensities 1.70 1.35 18/06/2012 LHC 8:30 meeting

Injection from SPS still difficult Sunday eve Same problems still at end of the week Reduced intensities leading to lower initial lumi last fill 18/06/2012 LHC 8:30 meeting

Fill from Sunday evening Losses back beginning of fill, both beams, several manual tune trims to improve lifetime 18/06/2012 LHC 8:30 meeting

Fill #2725: Tuesday morning 3:02 am Dumped during injection for physics Beam dump caused by a wrong manipulation of the access door. CSR forced the PAD in PM18 to add a missing "plombage" on the internal handle. This caused the loss of beams and of S12 and S81 as foreseen. Security guard team opened the PAD, using their key. Apparently there was a "plombage" missing on the inside of the PAD, and they wanted to repair it!!! They tell us that CSA told them he had called the CCC and it was ok to touch the PAD. We did not know anything about the intervention. Forcing a door at 03:02 in the morning… 18/06/2012 LHC 8:30 meeting

Bunch-by-bunch losses #2725 Low for both beams B2: some bunches additional losses in squeeze This disappeared on later fills…and came back again… 18/06/2012 LHC 8:30 meeting

Abort gap population #2725 Around 13:45 the abort gap filled suddenly above cleaning threshold and kept filling. The abort gap cleaning was switched on at LOW. After about 15 min the abort gap population went back to a normal level. 10 min later the same thing happened again. Since then the however abort gap is calm. Abort gap cleaning is off. The RF experts have not found any explanation yet However, it did not come back after regenerating the RF functions which had a ‘funny’ in it, see next slide 18/06/2012 LHC 8:30 meeting

RF function (Synchro Loop) The two functions had never been trimmed. The errors were present in 2011, and probably there since 2009... With the new (correct) settings, the Synchro Loop should be more stable at high energy 18/06/2012 LHC 8:30 meeting

Beam Dump at Start of Adjust, Thursday PM Losses show that this was a beam 2 problem only… Also: All losses in IR7  Betatronic, no longitudinal problem! Losses on many bunches Problem did not come back… 18/06/2012 LHC 8:30 meeting

MKI Kicker Vacuum IL on Thursday MKI vacuum interlock from 19:49:54 is understood: It just happened when we had the shortest bunch length at the start of the ramp and the vacuum signals look as e-cloud as well. Reset the vacuum interlock and soft start when we need to reinject. Happened second time Sunday evening, Similar this morning 18/06/2012 LHC 8:30 meeting

Fri15:54 triplet RQX.L2 tripped [ms] [ms] R.Schmidt / I.Romera 18/06/2012 LHC 8:30 meeting

Fri15:54 triplet RQX.L2 tripped The fault was originated by an internal problem on RTQX2.L2, which generated voltage oscillations of the three nested converters. I_ref had a sudden jump; that was probably due to the change of current of RQX2.L2 by -5 A This resulted in orbit oscillations Beam was dumped by fast losses on TCLA.B6L7.B2 The pc tripped by overcurrent inside the RTQX1.L2, after 300 ms N.B. Behaviour of the PC (and protections) correct, apart for the initial current change (which is not clear whether is coming from the PC.) the subconverter 3 of RTQX2.L2 went probably in short-circuit OK to continue, but check if improvement of protection on the longer term 18/06/2012 LHC 8:30 meeting

Fri15:54 triplet RQX.L2 tripped This has been one of the standard cases during the design of the MP system, and the reason for the diverse redundancy in the systems We would not have dared to test such case with high intensity beams MP worked as expected….. EPC should investigate how to send out a Powering Failure event in such case In order to no only rely on the BLMs, the Fast Beam Current Change Monitor is required … R.Schmidt / I.Romera 18/06/2012 LHC 8:30 meeting

New Filling Scheme from Friday onwards No problems 18/06/2012 LHC 8:30 meeting

Injection kicker MKI temperatures All time record temperatures 18/06/2012 LHC 8:30 meeting

Injection Kicker MKI M.Barnes Bake-out jackets to be removed in coming TS Will (only) give a 5 C gain in measured temperature Possibly new MKI-8D with more stripes in TS3 M.Barnes 18/06/2012 LHC 8:30 meeting

MKI cool down Sunday afternoon For critical temperature MKI.DB2.UP 07:00 Max temperature reached: 10 % above interlock 13:40 Beams dumped, still 9 % above interlock 18:35 Below interlock threshold Spent 1h25 minutes below threshold Optimisation difficult… 18:35 OK 13:40 beams dumped 21:00 >IL 18/06/2012 LHC 8:30 meeting

Planning Ahead (tbc by M.Lamont, Barbara Holzer) Aim: Delivering lumi until start of the MD Dump early afternoon to allow for injection kicker cool-down Clear majority of access list while MKI cooling down (depends on temp) Access: TCLIB.6R2.B1 electronics and LVDT sensor. MAD PM15: motors of inner doors not working (at least 4 hours). BI in Pt4 (3-4 hours, working hours). TOTEM vacuum gauge (3 hours). MCBV18.L4B1 and RCO.A12.B1 to be repaired / changed. LBDS Check/repair Ethernet connection on FEC cfc-ua63-mkdtspm. 1 hour during working hours, N. Magnin. Collimator cooling check TCT IR8 – Oliver Aberle Pt.7 (IMPACT: 18638) to exchange two amplifiers for the diamond BLMs. 2 hours (Ewald). BI: UA43 - lost remote communication with one of our controls front-ends. ½ hour. BI: Q7R4 (RF zone) - install attenuator and temperature probes on the HT- monitor to be retrieved during the next TS. ½ hour. 16:30 Impact of TETRA on hump / beam: 30 min. at injection with probe bunches. 17:00 ADT: Pilot for 15min. 6b nominal for 15min. 18:00 Start of 90 m pre-MD Tue 06:00 Start of MD block 18/06/2012 LHC 8:30 meeting