PSerc TAMU Site Meeting

Slides:



Advertisements
Similar presentations
PS ERC 1 T&D Technology Research Stem Mladen Kezunovic, Stem Leader IAB Meeting, Atlanta December 11-13, 2002.
Advertisements

MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
Sharing with Families Healthy Produce A Fraction of Cost Rejoice for the Monthly Savings Eat & Enjoy.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
PS ERC Transmission and Distribution Technology Research Stem Meeting #9 Committee Meeting Schenectady,May 29, 2002.
WP5– HANDBOOK ON PLANNING METHODOLOGIES Giovanni Leonardi JOINT ACTION HEALTH WORKFORCE WP5 Workshop, Turin – September 18 th 2014.
PS ERC New Pserc Projects Mladen Kezunovic. PS ERC Newly approved projects "...Enhanced Reliability..." Kezunovic "...Automated Integration..." McCalley.
Information Technology Needs and Trends in the Electric Power Business Mladen Kezunovic Texas A&M University PS ERC Industrial Advisory Board Meeting December.
Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Costas N. Georghiades Alireza Shapoury PS ERC PSerc Review Meeting Texas A&M University.
M. Kezunovic, G. Huang, TAMU M. Grady, S. Santoso, UT Austin W-J. Lee, UT Arlington ERCOT, August 11, 2006 ©2006 Mladen Kezunovic. All rights reserved.
PS ERC Transmission and Distribution Technology Research Stem Meeting #10 Committee Meeting Mount Hood, August 15-18, 2002.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
Substation Data Integration & Information Exchange Advisor: Dr. Mladen Kezunovic Student: Sasa Jakovljevic Texas A&M University, Department of Electrical.
Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Alireza Shapoury PS ERC PSerc Meeting Texas A&M University College Station November,
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
Lesson 41 first second third fifth eighth ninth twelfth fifteenth twentieth twenty-first one two three five eight nine twelve fifteen twenty twenty-one.
Junior College Planning Night March 2017
T&D Technologies Stem Meeting
Agenda MC Aug 13.
Olathe South ACT Timeline
HITSP Project 2007/2008 Work Plan and Schedule
Ward Jewell Mladen Kezunovic
Campus Master Plan.
Testing Plan Workshop Santa Cruz County BH
Mission-critical performance with Microsoft SQL Server 2016
CONSOLATA LANGUAGE CENTRE ACADEMIC CALENDAR
Months of the Year ©Copyright
Title of the presentation
Substation Automation IT
Welcome to the Cardiff Health and Social Care Network, 3 December 2015
James D. McCalley, Iowa State University, System Stem Leader
Issuance Platform Overview Pepper Residential Securities (PRS)
JULY SEPT OCT NOV DEC PCE ONLINE EXAM DATES (PART A,B,C&CEILI)
13-block rotation schedule
Welcome to your senior year…..
2018/2019 School Calendar July August September October November
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
Student Assignment Review Advisory Committee
Accurate Fault Location Using Modeling and Simulation
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
PSerc T&D Technology Stem
HCA Program Outline & Calendar Visit the Online Student Center!
FAY Dates School Year Traditional Fall 4x4 Spring 4x
WG7 Agenda Pau, F2F Meeting
PSerc TAMU Site Meeting
Dunlap Community Unit School District #323
PBIS Update December 2005.
2300 (11PM) September 21 Blue line is meridian..
HCA Program Outline & Calendar Visit the Online Student Center!
EVENING ASAP’S FIRST MEETING! January 16, :30 – 8:00 PM
McDonald’s calendar 2007.
HCA Program Outline & Calendar Visit the Online Student Center!
Faculty Champion Meeting
FAY Dates School Year Traditional Fall 4x4 Spring 4x
@ Sycolin Creek! We are very excited to announce that BYOT (Bring Your Own Technology) is coming to Sycolin Creek! The kick off date for certain classes.
Binghamton City School District
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
MONTHS OF THE YEAR January February April March June May July August
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
Enhanced State Estimation by Advanced Substation Monitoring
Substation Automation IT Needs
PBIS Update January 2006.
Welcome to Parent Forum.
JANUARY M T W T F S S Monday 1st semester Unit 2.
Calendar Overview – Phase I – REVISED April 2019
2015 January February March April May June July August September
Presentation transcript:

PSerc TAMU Site Meeting PSerc Project Review Meeting Texas A&M University College Station, Nov 7, 2002 PSERC

Contents Agenda Introductions Overview of PSerc Activities Project Reviews Discussion

Agenda 1:30-1:45 Introduction (Mladen Kezunovic) 1:45-2:15 Project #1; Voltage Stability (Garng Huang) 2:15-2:45 Project #2: Multi-Utility State Estimation (Ali Abur and/or Garng Huang) 2:45-3:15 Project #3: Substation State Estimation (Ali Abur)   3:15-3:30 Coffee Break 3:30-4:00 Project #4: Fault Location (Mladen Kezunovic) 4:00-4:30 Project #5: Wireless Communications and Mobile Agents (Alireza Shapoury and Xiangjun Xu) 4:30-5:00 Comments on initial activities on the new PSerc projects (Mladen Kezunovic) 6:30p.m. Dinner (Christopher’s World Grille)

WELCOME AND INTRODUCTIONS Industry Representatives TAMU Faculty: - A. Abur - C. Georghiades - G. Huang - M. Kezunovic TAMU Students/Researchers

TAMU Students/Researchers Q. Ding (left) Z. Galijasevic (left) S. Jakovljevic J. Lei Y. Lu (left) N. Nair S. Luo A. Shapoury J. Shi (left) M. Todorovic (left) S. Xu (left) X. Xu (left) H. Zhang (left) L. Zhao S. Zhong B. Xu

OVERVIEW OF PSerc ACTIVITIES Project starting date: Sept. 1, 2000 First project Review Meeting at TAMU (kick-off): October 19, 2000 PSerc IAB Review Meeting: Nov. 30-Dec. 1, 2000 Second Project Review Meeting at TAMU: March 22, 2001 PSerc IAB Review Meeting: May 31-June 1, 2001 Third Project Review Meeting at TAMU: October 8, 2001 PSerc IAB Review Meeting: Dec 5-7, 2001 Fourth Project Review Meeting at TAMU, March 22, 2002 PSerc IAB Review Meeting: May 30-31,2002 Fifth Project Review Meeting at TAMU, Nov. 7, 02 Next IAB Review Meeting: Dec. 12-13, 2002 Project closing date: December 31, 2002

LIST OF TAMU PROJECTS Voltage Security (G. Huang) Multi-Utility State Estimation (G. Huang, A. Abur) Enhanced State Estimation (A. Abur) Accurate Fault Location (M. Kezunovic) Wireless and System-Wide Communications (M. Kezunovic)