Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR9023200,WR9023300,WR9023400,WR9023500,WR9023600,WR9023700,WR9023800,WR9023900,WR9024000,WR9025200,

Slides:



Advertisements
Similar presentations
Title Presented by: For: Date:. Summary The summary is intended to provide the audience with a quick overview and basic understanding of the essential.
Advertisements

DC234KL Dust Extraction Adaptor rebuild Reason for change –In 2010 a cordless dust extraction unit was brought to the market. –When connecting the cordless.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Shielding options Jean Paul Surrey Space Centre, University of Surrey, UK ESA Study: WP2 24 th November 2006.
December 1, 2011 A presentation by USFpedals.org A project of Environmental Studies students in “Humans & Environmental Change” (ENVA 109) University of.
House Painters in Sydney. House Painters and decorator are responsible for the painting and decorating of buildings, and are also known as decorators.
Installation of Gil’s Fuel Box By Albert “ARAMP1” Rampone.
1/11 ISSUE 00 2 novembre, 1999 Patrick POTIGNON Systems Engineering SNECMA Proprietary This document is Snecma ’s property, it may not be used, reproduced.
PROJECT TITLE Name Date Etc. PROJECT OVERVIEW & PROGRESS: SLIDE 1 Bullet.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Research Project. Every year, from September 15 through October 15, we celebrate Hispanic-American Heritage Month. Different activities and events are.
What is PowerPoint? By Kettina L. Robinson. Unit Questions What do I want to accomplish? What do I want to accomplish? What content do I need to cover?
Cover Slide. Landforms Overview Landform 1 Text Picture.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Paint bottom first. Two coats of paint Paint the top last.
Presented to: By: Date: Federal Aviation Administration Obstacles in the Visual Segment 20:1 Background, Policies and Action Gerard G Lebar Eastern Flight.
Single Module Vertical Outlet Tube Change
2017 Single Module Beta to LP Changes
New Turbocharger Plumbing Oil Drain Connection for QSB6.7 T3
2018 Natural Gas Beta to LP Changes
The Relay based Multiplexer
Name of Small Business location
Overview of Design Background
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
CEAF Type: Change Approval Request
2016 PM sensor water shield addition in Horizontal Side-Out (ISB and ISX applications) and Vertical End-Out (ISB applications Only) SCR 11/30/2015.
2017 X15 Turbo Compressor Cover V-band Clamp Reorientation
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
Aircraft & Commercial Enterprises, Inc.
VPCR CEAF César F. Demarchi March, 22nd 2017.
Information To support CEAF Increase of Thermostat Temperatures on Euro VI Products (EC9108, EC9045, EC9076, EC9080),(D0F3008BX03, D0F3012BX03, D0P3001BX03,
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
ISB6.7 Euro 6 EGR Crossover Tube Insulation Removal
Implementation of bolt spacers to the oil cooler hardware
Affected Options: BR Option; EB Option; PH Option;
2017 X15 EH Bracket Machining Change
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
µHVIC™ PRODUCT FAMILY Advantages
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Planning Sales Dialogues and Presentations
Oil Pans with Full Circumference Clamping Plates for ISB6
Sticker Label Location Change on UL2 Supply Module
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Updated Power on Indicator Lamp from J1-76 to J2-07 in CM2350 Beta Wiring Diagram (B6.7/L9 Stage V) 5/30/2017.
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
Reader Swap out Guide.
L9 and B6.7 Component ID Change All options - D313029BX03 (B 2017) All options - D563025BX03 (L 2017) Mike Langevin 3/9/2017.
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Thieves—a great Previewing Textbook Strategy
Model of the IMC Planning Process
After service guide for changing PCB
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Presentation transcript:

Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR9023200,WR9023300,WR9023400,WR9023500,WR9023600,WR9023700,WR9023800,WR9023900,WR9024000,WR9025200, WR9025800,WR9026300,WR9026500,WR9026600,WR9026700, WR9026800,WR9026900,WR9027000,WR9027100,WR9045000,WR9045100,WR9045200,WR9045300,WR9045400,WR9058900, WR9059000,WR9059100,WR9059200,WR9060200 Engine Family: ISB6.7 L Date:3/01/2017

Project Scope Change Summary: Background: The backshell on the oil pressure sensor connector is been removed from the wiring harness assembly Background: Historically, a protective rubber boot was used to protect the connector from paint. The new program is using paint shield for that purpose and a backshell was added to enhance the harness robustness and cover exposed wires at the end of the connector. The backshell is creating a hard interference with some application, such as Compressor Freon bracket Implementation Strategy and Date: N/A

Change Summary (Using Graphics) Connector w/ backshell Wiring Harness Overview Connector w/o backshell Area of change Note: This change will affect multiple wiring harness part numbers and one of the wiring harnesses is used on this side as an example for graphic illustration.

Change Summary (On Engine Pictures) Connector w/ backshell Connector w/o backshell