BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017

Slides:



Advertisements
Similar presentations
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Advertisements

Register Digital Multimeter Usage Click Register to begin the course.
NERC BAL Frequency Response Reliability Standard
© 2011 Ericson Manufacturing, Willoughby, Ohio
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 2 – The Power Supply.
1 CREZ COMMUNICATIONS Presented by American Electric Power Telecommunications Engineering Matt WilliamsDon Demand Columbus, OHTulsa, OK.
1 9/10/2015 PanelDog DC Graphical LCD Meter Series.
ELG4125 Transmission and Distribution Systems
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
LAB SCOPES. HIGH SPEED VOLTMETER n Replaces: Test LightTest Light Digital Voltmeter/Ammeter/OhmmeterDigital Voltmeter/Ammeter/Ohmmeter Frequency MeterFrequency.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
AESO Export Capability Workshop February 16, 2006 Metropolitan Centre, Calgary.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
PR570 POWERITE II TRAINING Dedicated to Success in Electronic Servicing for 50 Years.
Automotive Electricity and Electronics, 3/e By James D. Halderman Copyright © 2011, 2009, 2005 Pearson Education, Inc., Upper Saddle River, NJ All.
O. MÄKINEN FI Session 3 Block 3 Barcelona May What is an intermittent earth fault (IE/F)? Insulation Conductor Screen Insulation break-down.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman OSCILLOSCOPES AND GRAPHING MULTIMETERS 43.
Automobile Charging System By Daniel Joo Functional Diagram Alternator Signal Conditioning Voltage Regulation.
Electrifying! Ken McAuliffe Chapter 30. Summary Ken McAuliffe Explains the complexities of wiring a large building for electricity. Describes how electrical.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
{ PRESENTATION ON TRANSFORMER. 1. INTRODUCTION: - TRANSFORMER : A static device- Utilized for raising or lowering the voltages. Transfers electrical energy.
NERC Published Lessons Learned Summary
Clock Signals: 555 Timer 555 Timer Digital Electronics TM
Summary Rich Bauer, Senior Reliability Engineer
NERC Published Lessons Learned Summary
Transformers.
Oscilloscopes and Graphing Multimeters
Eleanor Ewry Base Case Coordination Subgroup Chair
Next Steps in Load Modeling
Kurt Uhlir President Standby Power System Consultants, Inc.
GROUND-FAULT GROUND-CHECK MONITOR
What is an Operation and Misoperation
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Removal of Fraser RAS from RAS Databse
Peak online TSAT Implementation Update
Background Information on Hurricane Matthew Event No.1 Event No.2
Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)
Using Cathode Ray Oscilloscopes (CRO’s)
555 Timer 555 Timer Digital Electronics TM 1.2 Introduction to Analog
Building the Pharmacy Dynamic Model
Eric Oberla, Hervé Grabas, JF Genat, Sam Meehan
Diodes AIM: To understand diode characteristics
WECC August 2017 Reliability Workshop James Merlo, PhD
Attachment-K Q3 Public Meeting Coos Bay Area Transmission Planning Study Kickoff Area Planner: Adam Lint Presented by Larry Frick September 13, 2018 Choose.
555 Timer 555 Timer Digital Electronics TM 1.2 Introduction to Analog
Toledo-Lucas County PODS Mass Dispensing Exercise
Confidential - For Internal Use Only
WECC August 2017 Reliability Workshop James Merlo, PhD
What is an Operation and Misoperation
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
CECOM LAR Tropo Operation Course
WECC Joint Synchronized Information Subcommittee
Removal of Fraser RAS from RAS Databse
Hongming Zhang EMS Applications Manager, PEAK RC
Daniel J Marquis PNM Transmission Engineering
Confidential - For Internal Use Only
Palo Verde-COI RAS Retirement
BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017
Palo Verde-COI RAS Retirement
Wavewin Sniffer 24 Configuration & Polling Software
Emerson CSI 6500 Interfacing Architecture Revision 01
Lab 8 Induction to Oscilloscope
- + 24V DC V DC Kill Switch 24 Volt Supply IAI DS- Controller
Created by Jimmie Fouts Houston County Career Academy for
Oscilloscopes and Graphing Multimeters
Presentation transcript:

BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017 Daniel Goodrich To WECC OPAS August 22, 2017

11/21/2016 Pinched wire caused DC ground

Alvey 500 Station RAS made the controller thing that both Marion-Alvey and Alvey-Dixonville were both out of service

Alvey False Line Loss Signals Because the RAS equipment falsely reported a line loss of two 500 kV lines into Alvey, the RAS controls properly dropped generation. Here is a portion of the Sequential Events Recorder: The false line loss signals are at the top. Note that it is just the “A” side, pointing to a RAS unnecessary operation. 11/21/16, 12:42:32.474 RAS AC A MARION-ALVEY LINE LOSS RECEIVED RAS AC A ALVEY-DIXONVILLE LINE LOSS RECEIVED 11/21/16, 12:42:32.500 RAS ACA AC INTERTIE DYNAMIC BRAKE ALGORITHM TRIPPED RAS AC A AC INTERTIE LOW GEN DROP ALGORITHM TRIPPED

Card Performance Characteristic Setting Performance DC Volt input threshold 84 81-83 Vdc Debounce Time 2 0.75 milliseconds The DC grounds caused brief inputs into the RAS equipment, but because it was triggering sooner than the 2 msec setting, the misoperations occurred. The above times are based on BPA testing.

Next Steps BPA Protection and RAS Design determined which Units are affected: 287 cards at about 50 sites. Replace the cards (ongoing), to be completed by the end of 2017 Increasing the input debounce time from 2 to 16 msec was completed at all critical sites by mid-August.