Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.

Slides:



Advertisements
Similar presentations
DOCKMEN TRAINING LINC LOGISTICS INSIGHTS CORPORATION.
Advertisements

Create a Detailed CTC Machine Model with JMRI/PanelPro
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Introduction, Computers work by following a series of steps. Computers work by following a series of steps. These steps organize objects (set of variables)
Radio Etiquette Training
Standardized Work Creating Continuous Flow
Welcome to WebCRD.
CATHERINE AND ANNIE Python: Part 3. Intro to Loops Do you remember in Alice when you could use a loop to make a character perform an action multiple times?
Workshop: Car Service Rules 7 thru 11 ACACSO May 7 th, 2008 Kyle Campbell CSX Transportation.
1 Introduction to Transportation Systems. 2 PART II: FREIGHT TRANSPORTATION.
Model RailRoad Manager Simulate Prototype Operations on your Railroad.
WAREHOUSING MANAGEMENT
Ms. Hahn’s Classroom Procedures
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar - Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Card Tricks Arranged By Liam Saliba Source – Mismag822Mismag822.
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
STEP 1 ARRIVAL OF MERCHANDISE AND DOCUMENTATION The merchandise arrives at the broker's terminal on the U.S. side of the border. The commercial invoice.
Scorekeeping Instructions
Or Stop that train going round and round It’s making me giddy!! This presentation will run itself – no batteries required. If you are using Internet Explorer.
Local Switching Operations Steve Prevette PNR Vice President Burnt Hills and Big Flats RR
Freight Car Forwarding Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
Card Order Update Training March TOPICS Operations –Why, What & How –Call Board –Yards & Permissions –Operating Tips –Manifests Interactive Lessons.
Model RailRoad Manager Quick Start: Automated Traffic Generation.
CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”
Measuring Prototype Structures for Models Kevin Looff Rick Watson March 1, 2008.
1957 NRHS Convention Roanoke, Virginia Bill Volkmer Was There.
Mrs. Reeves’ 5th Grade Classroom Procedures.
Realistic Operations for Model Railroaders by R. B. Trombley, MMR PSR – NMRA Rev May, 2011.
Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
TRAIN OPERATIONS IN THE GARDEN
Conductor Decertification Discipline
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
Using Model Railroad Switch List Software
Model RailRoad Manager Inventory Management. Inventory: Rolling Stock and Everything Else l Locomotive, Freight Cars, Passenger Cars, Caboose, MOW l Trackage.
Please use the following two slides as a template for your presentation at NES. Completing the DD Form 1149: — A Basic Perspective Walt Clark, CPPM Property.
OPERATIONS – A Starter Kit
B&O CAR CARD AND WAY BILL OPERATIONS. INTRODUCTION To date, the B&O model railroad has directly written switch-lists for movement of cars. By moving to.
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
Model Railroad Operations Prepared by Dick Roberts, MMR My thoughts on the subject, presented with the assistance of all those operators who have gone.
Transportation (CHAPTER 23). Over Half of Railroad Employees Run Trains—Over the Road, Yards/Terminals, and Local Crew Districts - Increased in Recent.
Processing Warehouse Orders for Pinnacle Auto Parts.
Draft as of 4/1/05 Management …. Are You Ready to Conduct the Inventory Training for Your Team?
City and Parking Strategies / Rules of Road Hill Parking.
This is a slide show to explain in detail how to solve a puzzle of a common sort. Use the right arrow key to go to the next step and left arrow keys to.
Erie Consolidated Lime Co.Lakeview Building Materials SW Yard Throat SW 97 - Lakeview West Dame MouldingDonco Twistboard Products East Lakeview West.
CLASSROOM PROCEDURES Mrs. Conn, Entering Class BE ON TIME, OR HAVE A PASS! (if you are not in your seat when class begins, YOU ARE TARDY!)
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
CHAPTER 8 RAILROAD OPERATIONS. The “Average” Freight Train !!! No Contract Rates Paperwork Path (EDI) Demurrage Two Primary Documents.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
Operations on the Pennsylvania Southern Railroad Presented by Bob Weinheimer 2009 Version.
Project Ⅱ Task 4 shipping documents. Section 3 III. Ocean shipping documents Trade documents are generally classified into commercial documents, financial.
Before creating your first shipment, please take the time to follow the brief online computer based training. This will provide you with information required.
Updated for the 2016 Season. Contents GRAL Handbook Head Timer Description Head Timer Duties Timer Duties.
1 Touch Screen Voting Device Training Election Systems & Software.
Page1 Railroad Engineer The year is 1890 and you are a Steam Train Engineer. It is your job to transport a train of cars from Lawrence 7, Kansas to Reno,
Touch Screen Voting Device Training Election Systems & Software Presented by: Bill Lowe.
CE2303 Railway Engineering
2012 Touch Screen Voting Device Training The Mississippi Secretary of State’s Office, Elections Division 2012 Prepared and presented by: The Secretary.
Chester County 24 Challenge® Tournament Overview
Outbound Process Using Wave, Pick-HU, Packing, Staging, and Loading
How to Read Track & Trace / DHL MRT Tracking
Unload and Receive UNLOADING TL SHIPMENTS UNLOAD PERSON
ROUTE MANAGER TRAINING
MCAS Administration Training
5S Numbers Game The purpose of this game is to demonstrate the impact the way our workplace is arranged impacts on how the work is done.
Operations on the Pennsylvania Southern Railroad Presented by Bob Weinheimer MMR National Model Railroad Association Cleveland 2014 July, 2014.
Kanban for Inventory Management
SAP EWM Staging Area & Transaction Unit Call / WhatsApp :
Welcome to WebCRD.
1st Q, wk #1 Aug , 2018.
Presentation transcript:

Card Order Basics

Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what car goes to what location & when –Uses individual pieces of paperwork (the Card Cards) for each rolling stock

Card Order Basics How does it work? –The waybill tells the train crew: what industry in which town to spot the car. –The yard sorts cars based on the destinations on the waybills –Train crews only work on cars for which they have paperwork Set-out cars with waybills in the train pack Pick-up cars with waybills in the pick-up box

Elements of the Card Order System Car Cards –Rolling Stock Sleeves –Waybills –Engine Cards –Caboose Cards –Train Packs Card Pockets in Towns Call Board Yard Operations

Car Cards Rolling Stock Sleeves –Provides identifying information for the car Road Name Reporting Marks & Number Type of Car, Color & Length

Car Cards Rolling Stock Sleeves –Lets look at a sample:

Car Cards Waybills –Provides information about where the car is to be transported Shipper Consignee Type of Load Type of Car Special Instructions

Car Cards Waybills –Lets look at a sample:

Car Cards Engine Cards

Car Cards Caboose Cards

Car Cards Train Packs –Collects all of the car cards for a train in a convenient carrying pouch –All made-up trains will have a train pack Trains ready for departure will include a caboose card as the last card in the train pack Train crews reporting for duty in Pontiac must collect the appropriate engine card and place it in the train pack of their train Trains in staging will have the engine card already included in the train pack

Elements Car Cards –Rolling Stock Sleeves –Waybills –Train Packs –Engine Cards –Caboose Cards Card Pockets in Towns Call Board Yard Operations

Card Pockets Located at each town or industry Holds the car cards for each piece of rolling stock spotted at the town Split into 3 sections –Set-Out –Hold –Pick-up

Card Pockets The Set-Out / Hold / Pick-Up box cycles rolling stock through the industries in a realistic manner. All of the cars with paperwork in the Pick- Up box are ready to be removed from the industries and taken back to the yard. Cars in the Hold box are still in the process of being loaded/unloaded, and should be left at their current locations.

Card Pockets When the train crew arrives at the town to be switched: –Paperwork for cars in the train to be spotted at industry spurs in town is placed in the Set-Out box –Cars to be picked up and placed into the train have paperwork in the Pick-Up box –Cars to remain at their current location are found in the Hold box

Example You are assigned a train with engine, caboose, and two revenue cars. –Y–You would have four card cars in your train pack Two car cars for the revenue cars The engine and caboose also have car cards –E–Each revenue car has a waybill The first car is billed to Birmingham The second car is billed to Royal Oak

Example You proceed to Birmingham... –You set-out the revenue car billed to Birmingham at the industry specified The car card is placed in the Set-out Box in Birmingham Dont turn the waybills – just follow the instructions on the waybills –The other revenue car is left in the train (remember that it is billed to Royal Oak)

Example While in Birmingham... –If there are car cards in the Pick-up Box in Birmingham, you must place the associated revenue cars in your train. Take the paperwork with you!!!! –When you leave town: The number of car cards in your hand matches the number of revenue cars in your train There are no card cards left in the Pick-up Box The card cards for your set-outs are left in the Set-out Box

Example Then, you can move on to Royal Oak –Where you repeat the process... When you have set-out all of the revenue cars you started with, you return to your originating yard.

Everyones Job: When a card order session has been set- up (when there are car cards in the pockets), please do not move trains or cars around –Unless you also move the paperwork… Any new rolling stock or caboose added to the layout must have paperwork created for it – inform Michael McCreight prior to placing new cars on the layout

Everyones Job: Do not flip or change the waybills in the car cards. That is done only by the Trainmaster; or during set-up of a session. All engines used during card order sessions must have a blue locomotive card – blanks cards are available

Elements Car Cards –Rolling Stock Sleeves –Waybills –Engine Cards –Caboose Cards –Train Packs Card Pockets in Towns Call Board Yard Operations

Call Board List of trains & crews Shows the order of trains to be called / run during the operating session. Allows train crews to sign-up for train assignments, or mark-off to take a break Trains should be run in the order posted on the Call Board.

Elements Car Cards –Rolling Stock Sleeves –Waybills –Engine Cards –Caboose Cards –Train Packs Card Pockets in Towns Call Board Yard Operations

Pontiac Yard is the main classification yard for the layout Ferndale Yard is the secondary yard for local consists and storage All local crews will go on-duty at the Pontiac Yard office Train crews are responsible for hostling their own engines

Yard Operations Pontiac Yard Track Assignments –Tracks 1 – 4Arrivals & Departures Car cards for each train are in a Train Pack, and placed in the appropriate numbered box –Tracks 5 – 8Classification Tracks Cars being sorted for outbound destinations Car cards placed in appropriate numbered box –Track 9 (thoroughfare)no car storage Keep track empty for movement of locomotives

Yard Operations Pontiac Yardmaster will classify cars into cuts as follows: –Locals, Eastbound (Birmingham, Royal Oak) –Locals, Westbound (Waterford, Holly, Linden, Gaines) –Ferndale Transfers (Pleasant Ridge, Ferndale, Seven Mile, Chrysler Center, Milwaukee Junction) –Eastbound Manifests (to Detroit staging) –Westbound Manifests (to Durand staging) –Storage / To Be Classified

Card Order Sessions Crew Assignments (in order) 1.Trainmaster 2.Dispatcher 3.Pontiac Yardmaster 4.Pontiac Top Job (switcher) 5.Train Crew 6.Train Crew 7.Train Crew 8.Train Crew 9.Ferndale Yardmaster 10.Pontiac #1 Job (switcher) 11.Train Crew 12.Train Crew 13.Additional train crews...

Whew! I think that is enough for now. So... Any QUESTIONS?

This has been a presentation of: