AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.
Advertisements

OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Grid Access Unit Small and Micro Generator frame-work key focus areas Date : 18 April 2013.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Small-Scale Embedded Generation (AMEU and its Work Group Input) Gerrit Teunissen 18 April 2013.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Chapter 7.  A contract where a seller transfers or agrees to transfer the property in goods to the buyer for a price.  In other words a contract to.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Energy Agency of the Republic of Serbia
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
Wheeling Challenges Presentation To AMEU Tariff Committee Utility Services/Electricity Services/ 11 November 2015.
Establishing the Independent System & Market Operator (ISMO) March 2012.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Renewables IPP frameworks for successful PPAs Dr Muriel Watt Head, Energy Policy & PV.
HOW TO DRAFT CLAUSES WHICH COMPLY WITH REGULATION 330/2010
Latest Developments and Impact on the Financial Sector
COMMERCIAL LAW.
GC0104 – Demand Connection Code (DCC)
Latest developments in Estonia
Damitha Kumarasinghe Director General
Transmission Workstream 6 January 2011
Operationalizing One Nation One Grid
Establishing the Independent System & Market Operator (ISMO)
Content Overview of the Regulatory Environment Regarding The Electricity Distribution Industry in South Africa Who is NERSA? Regulatory Principles The.
INTERCONNECTION GUIDELINES
Direct lines - problem in Bulgaria
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
Overview of the Electricity Regulation Bill
Overview of the Electricity Regulation Bill
NEDLAC REPORT TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITTEE ON ENERGY
Direct lines - problem in Bulgaria
Generator tariffs and charges overview
PRESENTATION TO WHOLESALE ENERGY PROCUREMENT POSITION PAPER
National Energy Regulator of South Africa
Update on European Network Codes
Direct lines - problem in Bulgaria
Regulation of franchise in Tunisia
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
Fabio Bortolotti Buffa Bortolotti & Mathis, Torino-Milano
Direct lines - problem in Bulgaria
SALAM.
bihar electricity regulatory commission
Progress on the Renewable Energy IPP Procurement Programme
Presentation to the Parliamentary Portfolio Committee
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Network Contracting with Generators (incl Network Contracting with Generators (incl. Independent Power Producers (IPPs)) Presentation to AMEU Pricing Committee, 10 November 2010 Juan la Grange

Purpose of this presentation To provide background on the contracting requirements for generators To clarify the network contracting framework for generators, taking into consideration: Electricity Regulation Act, License, Grid and Distribution Code requirements (technical and contracting) Physical vs contractual power flows Multitude of expected IPP generators, majority will be <100 MW and thus embedded (within a distributor). The urgency and importance of efficiently connecting generators, especially during the next few years of expected generating capacity shortages. 2018/11/23

Electricity Regulation Act (ERA) (Act 4 of 2006) requirements “A … distribution licensee must … provide non-discriminatory access to the … distribution system to third parties. (Section 21, subsection (3)).” Interpreted, this means fair treatment by the network provider ito Network pricing Network connections The use of the network Standard legal terms and conditions in agreements For all generators and loads 2018/11/23

Types of IPP energy transactions Embedded in Munic, selling to the same Munic Embedded in Munic, selling to Single Buyer (SB) or Other (eg Wheeling) Embedded in Distribution, selling to the same Distribution region Embedded in Distribution, selling to SB or Other, or wheeling Transmission connected, selling to SB or Other or wheeling Embedded in a customer’s plant, selling to that plant or own use Embedded in a customer’s plant, selling to SB or Other or wheeling International IPPs selling to International Trader 2018/11/23

The split between energy and network IPPs will typically have Power Purchase Agreements (PPAs) with some other party for the sale of their energy. But they also need an agreement with the network provider, to allow connection and the use of the network or system. Thus Distributors and Transmission will need network-only agreements with IPPs. 2018/11/23

Distribution Code contracting requirements Distribution Code requires Connection, Use of System (UoS) agreements, for generators and loads. Operating agreements where required by the Network Provider license. Each Licensee should have standard legal terms and conditions, so as to comply with their licence and the ERA requirement of non- discriminatory access. We need to harmonise these agreements as far as possible. Other processes and principles also need a framework / standardisation: Use of system pricing Connection standards Quotation process 2018/11/23

Transmission License and Grid Code requirements Licensee (NTC) shall provide non-discriminatory access to users of the Transmission System This implies standard contractual terms and conditions, and thus standard contracts Three types of contracts are required: Connection agreement (for a new or upgraded connection) Transmission Use of System agreement Operating Agreement An Ancillary Services agreement is possible if the parties agree. 2018/11/23

Grid Code requirements: contracting 2018/11/23

Physical vs Contractual electricity flows Contractual electricity flows assume that the electricity flows between the contracting parties. Physical flows are subject to the laws of physics, cannot be determined second to second, and change according to system conditions and events. For example, an embedded generator may sell to the Single Buyer: The physical flow may normally be restricted to the surrounding distribution system and loads (unless the loads disconnect due to an abnormal event). The contractual flow will be across a number of distribution systems and the transmission system to the Single Buyer. Or viewed differently, the transaction is only possible if the distribution and transmission systems exist. 2018/11/23

Contractual arrangements Type of IPP Type of network contracts Embedded in Munic, selling to same Munic or Single Buyer or Other (eg wheeling) Munic network agreement including compliance to the Grid Code PLUS Operating Agreement with Eskom Transmission and System Operations when PS≥50 MW or network configuration referred by Munic, then Transmission to decide Embedded in Eskom Distribution, selling to same Distribution Region or Single Buyer or Other Distribution network agreement; including compliance to the Grid Code PLUS Operating Agreement with Eskom Transmission and System Operations when PS≥50 MW or network configuration referred by Eskom Distribution, then Transmission to decide Connected to Transmission selling to Single Buyer or Other Transmission agreements only Note. The types of contracts will not be influenced by the energy transactions, it is size and Distribution / Transmission connection point that matters. 2018/11/23

Contractual arrangements (cont.) Type of IPP Type of network contracts Embedded in a Distribution connected customer’s plant, selling to that plant or own use or selling to Single Buyer or Other (eg wheeling) Distribution network agreement; including compliance to the Grid Code PLUS Operating Agreement with Eskom Transmission and System Operations (proposed) when PS≥50 MW ; or network configuration referred by Distribution, then Transmission to decide Embedded in a Transmission-connected customer’s plant, selling to that plant or own use or selling to SB or Other (eg wheeling) Transmission agreements International IPPs Distribution and / or Transmission agreements depending on connection point 2018/11/23

Action Name Date Action Plan Request SA Grid Code change to set out the requirements for embedded generators contracting with Transmission (> 50 MW) Eskom Transmission to submit to the GCAC 2018/11/23